Loading...
2014, 09-24 Permit: ROW-2014-0521 ROW City of Spokane Valley 7^; soon Community Development r000Va11ey. 11703 E. Sprague Ave., Suite B-3 Spokane Valley, WA 99206 (509)720-5240 permitcenteq@spokanevalley.org ROW-2014-0521 DE-ROW PROJECT NAME: COMCAST OF WA JOB TRACKING#129449 ISSUED: 09/24/2014 SITE ADDRESS: 15708 E 11TH AVE SPOKANE VALLEY EXPIRES: PROJECT DESCRIPTION: OPEN TRENCH/BORE 52' IN ROW&PLACE 2"PVC ALONGSIDE AND UNDER E 11TH PARCEL: 45243.0209 APPLICANT: COMCAST-INVOICE OWNER: YURKIN,ANDREY 1701 JOHN F KENNEDY BLVD 3933 LAKE WASHINGTON BLVD#100 PHILADELPHIA,PA 19103 KIRKLAND,WA 98033 360-527-8213 ELECTRICAL CONTRACTOR: Prince Telecom LLC License: PRINCTI939KW 13701 24TH ST E BLDG G Expires: 05/16/2015 SUMNER,WA 98390 253-261-1882 FEES: Paid Due Right of Way $110.00 Totals : $110.00 CONDITIONS * Prior to excavation, it is the Contractor responsibility to contact the purveyor of any transmission pipeline that is within 100 feet of permitted work, as per RCW 19.122.033. * *The traffic control plan submitted has been approved for concept only. The Contractor is responsible for determining specific signage and layout as required by the Manual on Uniform Traffic Control Devices(MUTCD),WSDOT specifications and Washington State modifications to the MUTCD.All devices shall conform to the MUTCD and WSDOT specifications. * For all permits that include road obstruction the Contractor shall notify the Spokane Valley Public Information Officer(PIO) at 509.720.5411 within 24 hours of receiving this approval. For any changes to the schedule of the road obstruction the Contractor shall notify the PIO of the change with a minimum of 48 hour notice prior to the road obstruction. The Contractor shall provide the location of the work, expected start and end times and dates of the road obstruction. The PIO will notify the newspaper, school districts, Spokane Valley Police Department, or fire dispatch as necessary. *The City of Spokane Valley may request changes as warranted by traffic conditions and motorist behavior. * If the construction zone is open to traffic before completion of final paving the Contractor shall provide warning signs, as required by the MUTCD and WSDOT specifications. *WSDOT Work Zone Traffic Control Guidelines are available at www.wsdot.wa.gov. For future submittals, please use the "Work Zone Traffic Control Plans (TC-1 —TC-18)if applicable to your project. Printed by:Tamara Fauroton:09/24/2014 11:38 AM Page 1 of 2 City of Spokane yalley o� lle Community Development DE-ROW ,,,,.1rValley 11703 E. Sprague Ave., Suite B-3 Spokane Valley, WA 99206 ROW-2014-0521 (509)720-5240 permitcenterc@spokanevalley.org The ownership of a Spokane V Iley Development Permit will inure to the property owner. The permit applicant, by definition, is the poperty owner or an authorized agent of the property owner. It is the responsibility of the applicant/ permittee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required and may necessitate removal of certain parts of the construction are the applicant's/ permittee's or property owner's expense. Owner/Agent Date: Staff Approval / / Date: q/;141 Printed by:Tamara Faurot on:09/24/2014 11:38 AM Page 2 of 2