2009, 10-08 Permit: 09003245 FurnaceSpokane
jValley°
Site Information
Site Address: 13413 E IOTH AVE
Parcel Number: 45224.1054
Subdivision:
Block: Lot:
Zoning: R-3 SF Res District
Owner: RANDALL, LISA
Address: 13413 E PITH AVE
SPOKANE VALLEY, WA 99037
Building Inspector: SOUTH
Water Dist: VERA
PERMIT CENTER
11703 E. Sprague Avenue, Suite B-3
Spokane Valley, WA 99206
Project Information
Project Number: 09003245 Inv: I Issue Date: 10/08/2009
Permit Use: 1 FURNACE
Applicant: ACI
6600 N GOVERNMENT WAY
COEUR D ALENE, ID 83815
Contact: ACI
6600 N GOVERNMENT WAV
COEUR D ALENE, ID 83815
Setbacks- Front: Left: Right:
Group Name:
Project Name:
Phone: (208)772-9571
Phone: (208)772-9571
Rear:
Permits
Mechanical Permit Contranor: ACI License N: ACIN0P922D8
GASAPPLIANCE<_y W,000131' 1 $1100 PROCES'SINGFEE 53700
Total Permit Far. $3000
FOR MECHANICAL INSPECTIONS CALL (509) 688-0054.
'.J 1 f•'IK�Yl
Processed By: Main, Jodi L PERMIT
Printed Bv: MORRIS, HEATHER Page 1 of I
Payment Summary
Total Fees
$50.00
AmountPaid
$50.00
AmountOwine
$0.00
Tran Date
10/08/2009
Receipt p
20310
Payment Amt
$50.00
'.J 1 f•'IK�Yl
Processed By: Main, Jodi L PERMIT
Printed Bv: MORRIS, HEATHER Page 1 of I
NOTICE
The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by
definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the
applicant permiftee that the use described on the front of this permit complies with applicable codes and that required
inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before
progressing beyond the point where inspections are required may necessitate removal of certain parts of the
construction at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE
REQUIRED by City Code:
FOOTING -when forms and reinforcement are in place and prior to placement of Concrete -all structures, including manufactured homes.
NOTE: This inspection includes review of the structure's setback from property lines. Minimum setbacks are established by City of Spokane
Valley Ordinance. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable
setback provisions lies solely with the permittee -neither the City of Spokane Valley nor its authorized representatives assume any
responsibility for the verification or location of your property lines. Please verity their location prior to locating your structure. Failure to
properly locate the structure may require its relocation at the owner s/peruniffee 5 expense.
FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete.
PLUMBING - after rough -in, before Covering, and final.
MECHANICAL - rough -in of piping, before Covering, metal chimneys before concealment, and final.
FRAMING - after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are Complete, and prior to
concealing.
FINAL - when complete and prior to occupancy and/or use. All permits require final inspection.
NOTEIn addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site
plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access,
on-site drainage (208' Swales), road improvements, parking and landscaping are Common requirements of a perniVsite plan which must be
Completed prior to final approval of a building or issuance of a Certifcate of Occupancy.
MANUFACTURED HOMES - Final Inspecton required when complete, stairs, handrails, skiving, etc. installed, and prior to occupancy,
Completed inspection record Card must be available on site.
PLUMBING REVERSALS FOR SEWER CONNECTIONS - prior to cover.
RIGHT-OF-WAY/APPROACH- prior to placement of concrete/asphalt or, if gravel approach, after Completion.
In addition to the above, any plumbing or mechanical systems or material which would be Concealed by framing, drywall, Concrete, etc, must
be inspected prior to Cover. Check with the Building department for "special inspections" in conjunction with Commercial projects.
FOR INSPECTIONS
Please give one working day/24 hour notice. Different parts of your project may require permits and Inspections from more than one agency.
Building. plumbing (includes interior reversals for sewer) and Road cuts for utilities or driveways, City of Spokane Valley
mechanical, City of Spokane Valley Building Division 688-0054 Public Worcs 688-0195 or State Dept of Transportation
324-6000
Portion and mspeclions for Normal ernng. Stale papal of LaOw portly and mepMmne for Sewe, Cl. Spokane County Vlilllles RMvm
end lndo:Ines a24.25ee a11.Wl4
Penis and msceeunnn to onzue nepuc nnlelrs.:plane adynnal Ind spnnxIn, and alarm nMvrSai1M,are aoceas,oad mnpes'uonn. SWkane will
Health Crund 324-1560 pry Decadmenl laze 122
Sole law new Is I I c ne,res Ihal odor Id any o, cod — 0e'CALL BEFORE 1. IJ all cent¢, mull re notified. Call before you dig at 112 varking daya m advance, 4%radoo.
PERMIT EXPIRATION AND REFUNDS
All permits shall expire by limitation and be paddled void if a) work is not started within 180 days of obtaining a permit, or b) work is
abandoned for 180 days or more after beginning work, or d) after two years from the date of permit Issuance, regardless of whether the work is
finished. If a permit Is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to
finish the original pemnit.
All refund requests most be made In writing by the original permittee to the Building Official no later than 180 days after the date of fee
payment. 100% refunds will be granted for any fee erroneously paid or collected Refunds of not more than 80% of a permit fee may be
authorized when no work has been done under the perinit issued. Refunds of not more than 80% of a plan review fee paid may be authorized
when an application is withdrawn or cancelled prior to the plan review being completed
Owner/Agent Date
Staff Approval Data
r
City of Spokane Valley
Building Dept
Receipt
Receipt Number:
20310
Customer Number
10/08/2009 3:1836 PM
By:
Projects
Logon User:
BldgCounter
Station:
CX_SV00014A
Override By:
Full
ProjectNb
Inv Nbr FeeAmt Inv Amt
owine
PAID Pmt
09003245
1 $50.00 $50.00
$50.00
$50.00
Total: $50.00 $50.00
$50.00
$50.00
Miscellaneous Items
Total PAID:
$50.00
Tender
Type
Check Acct
Balance CC Nbr
Ext, Date
TENDERED
VISA
xxxxxzxxxxxx5296
1112010
50.00
Payer:
Notes:
Tran Date/Time:
10/08/2009 3:1836 PM
By:
HMORRIS
Logon User:
BldgCounter
Station:
CX_SV00014A
Override By:
Printed. 70/08/2009 3:18:39 PM
Total TENDERED: 50.00
Over I(Short) $0.00
Change $0.00
Page I of]