2005, 04-25 Permit: 05001306 AC00
BUILDING DIVISION
SPO
Mechanical Permit
Contractor: HOMECOMFOR'CSFRVICES
License#. HOMECCS977U
I170S Sprague Avenue, Suite 106
W.�1alley
Spoo kane Valley. WA 99206
Site Information
Project Information
Site Address: 13416 F 10TH AVE
Project Number: 05001306 Inv: I Issue Data: 04/25/2005
FOR MECHANICAL INSPECTIONS CALL (509) 688-0054.
Permit Use: AIR CONDITIONER
Parcel Number: 45224.1402
Payment Summary
Subdivision:
Total Fees AmountPaid
Applicant: HOME COMFORT SERVICES
Block: Lot:
Payment Amt
1922 N LOCUS "I'
$0.00 04/25/2005
1091
SPOKANE, WA 99206 Phone: (509)466-3911
Zoning: UR -3 Urban Residential 3S
Contact: HOME COMPORT SERVICES
Owner: BONGERS. SHAWN & BRANDI
1922 N LOCUST
Address: 13416 B IOTHAVE
SPOKANE, WA 99206 Phone: (509)466-3911
SPOKANE VALLEY, WA 99037
Setbacks - Front: Left: Right: Rear:
Building Inspector: KEVIN MYRE
Water Dist
Group Name:
Project Name:
Processed By: KATHY CUMMINGS PERMIT
Printed By: MIKETURBAK Page I of I
Permits
Mechanical Permit
Contractor: HOMECOMFOR'CSFRVICES
License#. HOMECCS977U
MCAT PUMP OR A/C 0-3 TONS 1
$12.00
PROCESSING FEE $35.00
Total Permit Fee: $47.00
FOR MECHANICAL INSPECTIONS CALL (509) 688-0054.
Payment Summary
Total Fees AmountPaid
AmountO vine Tran Data
Receipt 0
Payment Amt
$47.00 $47.00
$0.00 04/25/2005
1091
$4700
Processed By: KATHY CUMMINGS PERMIT
Printed By: MIKETURBAK Page I of I
NOTICE
The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by
definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the
applicanVpermiftee that the use described on the front of this permit complies with applicable codes and that required
inspections are requested Failure to request inspections as listed below and obtain the necessary approvals before
progressing beyond the point where inspections are required may necessitate removal of certain parts of the
construction at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE
REQUIRED by City Code:
FOOTING -when forms and reinforcement are in place and prior to placement of concrete -all structures, including manufactured homes.
NOTE'. This Inspection includes review of the structures setback from property lines. Minimum setbacks are established by City of Spokane
Valley Ordinance. Curb lines and fence lines are not necessarily Indicative of property lines. The responsibility to comply with applicable
setback provisions Iles solely with the permittee -neither the City of Spokane Valley nor IN authorized representatives assume any
responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to
properly locale the structure may require its relocation at the owner's/permittee s expense.
FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete.
PLUMBING - after rough -in, before covering, and final.
MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment, and final.
FRAMING - after all framing, bracing and blocking is In place, rough electrical, plumbing and mechanical systems are complete, and prior to
concealing.
FINAL -when complete and prior to occupancy and/or use. All permits require final inspection.
NOTE: In addition to Inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site
plan) required by ordinance or as a condition of approval of this permit Items such as the installation of fire hydrants, fire department access,
on-site drainage ('208swales), road improvements, parking and landscaping are common requirements of a Pernplan which must be
completed prior to final approval of a building or issuance of a Certificate of Occupancy.
MANUFACTURED HOMES - Final Inspection required when complete, stairs, handrails, skirting, etc. Installed, and prior to occupancy:
completed Inspection record card must be available on site.
PLUMBING REVERSALS FOR SEWER CONNECTIONS - prior to cover.
RIGHT-OF-WAY/APPROACH - prior to placement of concrete/asphalt or, if gravel approach, after completion.
In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etcmust
be inspected prior to cover. Check with the Building department for "special inspections" M conjunction with commercial projects.
FOR INSPECTIONS
Please give one working day/24 hour notice. Different parts of your project may require penaits and inspections from more than one agency.
Building, plumbing (includes interior reversals for sewn t and
mechanical, City of Spokane Valley Building Division 688-0054
Femur ano inassep-, im eIw'r` I wringstate peeanmem or Laoar
All mar:me: Ileaaa
,are allassona for -she learn salan6, sFederal
wt lazmn 4a-ts6n
Road cuts for utilities or driveways, City of Spokane Valley
Public Works 688-0195 or State Dept of Transportation
324-6000
Ferry, to inzvemmns. Sewer conn¢tlmn. sMkane Cmniy inns¢-DI'nvon
477-36N
Ins starker and alnm a,11—ana p^yab goes, mae ma ixtine, spnee. vauey
Ore peranment ledairs
Slate lav RCw is 122 re a res that prior to any esavxmn the-CALLBEFORE You mc' center mug benoted Cat base you mq at least working gay: an aovana, 45yela o.
PERMIT EXPIRATION AND REFUNDS
All permits shall expire by limitation and be declared void if a) work is not slatted within 180 days of obtaining a permit, or of work is
abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance, regardless of whether the work Is
finished. If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to
finish the original permit.
All refund requests must be made In writing by the original permittee to the Building Official no later than 180 days after the date of tee
payment. 100% refunds will be granted for any fee erroneously paid or collected Refunds of not more than 80% of a permit fee may be
authorized when no work has been done under the permit issued Refunds of not more than 80% of a plan review fee paid may be authorized
when an application is withdrawn or cancelled prior to the plan review being completed.
Owner/Agent — > Date PS C1S
Stall Approval Data