2012, 07-05 Permit App: BLD-2012-1029 ShopCommunity Development Department (Staff Use Only)
ermf3 Center
1703 East Sprague Avenue, Suite B-3 ERM1T NUMBER:
Spokane Spokane Valley, 03 99206
Tel: ane alley, A PERMIT FEE:
,,;,o0` alley Fax: (509) 80spo37
V 1 Fa (5 r
[ kanevallev om
RESIDENTIAL CONSTRUCTION PERMIT APPLICATION
❑ NEW CONSTRUCTION ❑ ADDITION/ REMODEL ACCESSgRy BUILDING
❑ DECK ill ❑ OTHER L�IU"ill, �(�T—N
SITE ADDRESS: 242,a t-. fd N*C RECiEk
ASSESSORS PARCEL NO.:tFS r7-o�i . 13 bZ I LEGAL DESCRIPTION: tr L e 5 2W
BUILDING OWNER NAME:
� (1 CSV PERMIT CENTFK
NAME: \�Q(F` �ct`OLJ�C
Arai 13+-Gaa E. �h- Avc SUB#= REV. #
PHONE: 0. d. 1 1401 1
CONTACT NAME: ''Ad �i
PHONE: FAX: CELL:
CONTRACTORNAM1E: QUcF�\.111"c¢pL C�O9 L�IJ SS
MAILINGADDRESS`: JU �QN� 1 SNJOR'lE� tib 1 !1n I
CITY: %�WP(1P-. i STATE: 1AI� ZIP1, CIA 11;41
FAX: 44SA 31M
CONTRACTOR LICENSE NO.: Q\)QL1 SIeQ t` O EXPIRES: CITY BUSINESS LICQNSE NO.:
DESCR B T E SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE:
s�m4- firNaQ,ABg
****YOU MUST COMPLETE THE FOLLOWING****
MARK N/A IF NOT APPI TCARI F
Height to Peak: 1D 11
'-
Dimensions: h.n k ,(„
No. of Stories:'
Total Habitable
Space:
Main Floor SQ FT»a�
��UU
Q
Upper Floor,SQ FT:
tls
Unffnishe asement SQ
FT:
Finished semen SQ
FT: �H—
Garage SQ IT:
Deck/Covered Patio SQ
FT: �,
Impervious Surface
Area:
30% Slopes on
Property:
No. of Bedrooms:
Construction e: a
Heat Source:
Sewer or Se tic• [
COST OF PROJECT:
DISCLAIMER
The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, me dwelling is/will
be sewed by Potable water. 2) Ownership of this City of Spokane Valley permit Inure to the property owner. 3) The signatory Is the property
owner or has permission to represent the property owner In this transattion. 4) All construction Is to be done in full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane valley Permit Center. 5) The City of
Spokane Valley permit Is not a permit or val any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional
Information may be required to be subml peed tl ubs¢quently approved before this application can be Processed.
Date:
a 1-11-11 Page 1 of 1
http://www.spokanevalley.org/Fiilestorage/124/938/210/948/1496/Building_Permit_-_Residential_I1-11-11.doc
RESIDENTIAL CV#K LIST DIRECTIONS:- . .
Place a check mark in box next to each document required for complete submittal.
D SITE PLAN
❑ Window and door location and sizes
❑ Property lines and dimensions
❑ Setbacks to property lines
❑ Direction arrow pointing North and orientation to streets
❑ Distance between buildings
D Proposed/existing buildings (footprint and dimensions)
❑ Right of way/easement location & sizes
❑ Utilities, septic tank/drain field locations and distances
❑ Driveway approach size and location
BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned)
❑ Elevations (Front/Rear/Sides) with roof peak and wall height including basement:
❑ Foundation Plan (crawlspace, basement or slab on grade):
❑ Footing sizes and locations ❑ Supporting wood cripple walls or beams
❑ Perimeter concrete foundation wall sizes ❑ Thickened concrete pads supporting
❑ Crawlspace ventilation beams or girder trusses
D Floor Plan of each level (finished or unfinished) with dimensions
❑ Floor Joist direction, size and spacing
❑ Window and door location and sizes
D Header, beam or concrete lintel sizes
❑ Window well locations if applicable
D Brace wall panel locations
D Room usage labels
❑ Water heater and furnace locations
❑ Smoke detector locations
❑ Exhaust fan locations
D Attic and crawl space access locations
❑ Deck or concrete patio sizes and locations
❑ Fire Wall construction
❑ Roof Plan:
❑ Engineered truss direction and spacing
D Rafter and over frame direction, size and spacing•
❑ Wall Section Detail including:
Roof
❑ Slope/ roofing material/ undedayment/ ice dam protection
❑ Sheathing size and type
Ceiling
D Joist size and spacing
Wall
❑ Height/ top plate/ stud size and spacing/ sole plate
❑ Exterior sheathing size and type
Floor
❑ Joist size and spacing
Foundation Wall
D Concrete or Masonry unit width
❑ Earth to wood separation distance
Footing
❑ Size
Radon
❑ Passive system with 6mil vapor barrier
Miscellaneous Construction Details
❑ Deck:
❑ Floor plan/ side view/ dimensions
❑ Floor Joist/ decking direction, size and spacing
❑ Ridge, save and valley lines
Beam and girder size and location
❑ Truss or rafter size, spacing & connection
❑ Attic insulation/ air space baffle/ ventilation
❑ Size of ceiling gypsum wall board
❑ Siding/ exterior house wrap/ anchor bolts
❑ Insulation, vapor barrier, gypsum wall board
❑ Sheathing or concrete floor size/ insulation
D Footing bottom to finished ground level depth
❑ Horizontal & vertical reinforcement if any
❑ Reinforcement if any
❑ Active system with 6 mil vapor barrier
❑ Footings/ post/ and beam size and locations
0 Stairway tread rise & run and nosing 0 Handrail / Guard height & spacing
Spokane Valley Municipal Code
asphalt, Portland cement grass
ECEIVED
JUL 0 5 20VOmmunr
11703 E
509.720.5026
PERMIT' ���
RAidential Driveway
PAVING WAIVER
avelopment— Planning Division
to Ave Suite B-3 ♦ Spokane Valley WA 99206
509.688.00371 olannineosookanevallev ore
land orFstreet parking areas shall bepaved with
atedal". A paving waiver can only be granted If
driveway for daily use.
PART I — OWNER INFORMATION
OWNER NAME: 1—yt`Ol�lvt- PARCEL#: arsn��'7,1Jpkl
•`'�Fr�p,�-1Vh`
ADDRESS: 13`7 E. \Qt
CITY: � isy'gkAx LL�H
STATE:
rr��//��
Zip: Nx16
^
PHONE: Cl0� 1 4n,+
FAX:
CELL:
EMAIL:
PART II —DETAILS OF PAVING WAIVER
1. Do you have an existing garage for parking daily use vehicles?'N YES ❑ NO
2. Is the proposed detached structure used for storage only? X YES ❑ NO
3. Do you plan on using the detached structure to park vehicles? ❑ YES A NO If yes, then
what type of vehicles?
4. Do you plan to conduct a business from proposed detached structure? ❑ YES .5 NO If so, what
is the nature of your business?
PART III —AUTHORIZATION
(,(PRINT NAME) LAIONtiE owner, hereby confirm that the information provided on this
form is true and correct. i acknowledge that any change in the foregoing conditions, could require
the City to impose paving requirements. I further agree to report any change in these conditions to
the Spokane Valley nit Development Department, Planning Division, within 30 days.
I
ner Sigl Date
PART IV — DECISION
STAFF HAS REVIEWED THE PROPOSED PAVING WAIVER ON BEHALF OF THE COMMUNITY DEVELOPMENT
DIRECTOR AND FIND THE REQUEST IS GRANTED AT
SAID ADDRESS FOR
�PEERMIT #: �JG,D O2Cyi�oi-/Oa`J
Plan ng Division Staff Signature Date
Created 6/27/11 Page 1 of 1
_ Quality
STEEL BUILDINGS, INC.
Project # 6W- ZCA? - 10 0. 361 Sandy Shores Rd (509) 468-1606 office
Newport WA 99156 (509) 468-3720 fax
RECEIVED
LIC# OUALISBO81C7
JUL 0 5 2012
CSV PERM;T CENTER SITE PLAN
SUE. F�� RFv. d- i�� SHOW I.
_..._..__ NORTH
CEPT. APPROVI.
DATE:
I �IouS<
II
-VAT 10'! w-,
JOB NAME L41LOQJ V-
SHOWSTREETSIALLEYS PHONE#
SHOW SEPTIC/SEWERIDRAINFIELD ADDRESS 1 E 10 _ (j��
SHOW EXISTING BUILDINGS C gl'1-6 QLL£4
SHOW SETBACK&FRONT,REAR,SIDE PARCEL# 45aaa. Isal
SHOW LOTSIZE
SIDE YARD 8 REAR YARD SET BACKS.