Loading...
Piper Rd 12727 Splash Down Parking Lot . • Splash-Down Concessions, Inc. East 12727 Piper Roacl Spokane, Washington 99207 May 27, 1983 Spvkane County Planning North 721 Jefferson Spokane, Washington Gentlemen: Splash-Down Concessions is desiring to be open ta the public on May 28, 1983, and thus needs to obtain a permit from Spokane County to operate its facility. There are several areas within the project which are not com- plete and we would appreciate your consideration on these items. The following list summarizes these areas and there extent of completion as of May 27, 1983. $ of Ccm- Speci.f ic Projected Date Projected Date It+em pleti.on Area of Starting of Completion Flwres & supports 98% Fi.nal coat Sept. 183 Sept. 183 of pai.nt Mechanical equip. 100$ Buildings 95$ Trun, soffit conti.nata.on June 8 stai.ning, base- board Exterior lighting 50% Slide area contuluation Jwne 3 Exterior lighting 0$ Parking lat May 30 June 1 Fencing 60% Parkirtg lot May 27 June 2 I,and Scaping 100$ Upper level Land Scapuig 0$ Parki.ng lot May 30 June 3 Land Scaping 0% Iower Pool area June 4 June 15 Paint Striping 50$ Parkinq lot May 27 May 28 SY.ncerely, , , „ . Lt L Willl.am L. Bleasner President . .1 ~ r CEN,4MId' ~ . . EST ENqINE-ERINq CORPOItATiON DBte JOb NO ~ Atteniion ~ Re - v~~( LETTER OF TRANSMI'TTAL ~ y Centlem(in: We are sending you~ Attached,[] ~Under seperate cover via the following ifems Shop Drawings ❑ Pr,ints ❑ Plans ❑ Sam'pies ❑l Specifications ❑ Copy of Letter ❑ - p.~ N S P LitS r-~ oowa. ~f ~ l c~~ ~ h - ~ -i- - - i I - These are< transmitted as checked below ;M F.or Approval Approved as Submitted Resubmit Copies #or Approval , ;&For Your Use ❑ Approved as Noted ❑ Submit _.._!Copies for Oistribution 10 As Requested ~ Returned for Correctians ❑ Return Corrected Prmts , X For Revie,w and Commenf C3 0, FOR BlDS DUF 19 ❑ PRINTS RETURNED AFTER LOAN TO US Remarks _r tf enclosures are not$s noted, kindly notify us at,once < ned ~ PL4NNEaS • EMG/A►EERS • ECONOMISTS • SC1Eqlf rS ' N,1010 WA'SHINGTQN • SROKAIVE WA • TELEPHO 1 -4227 . , RECEIY ED • • StOlANE ir►t;M11 cngfailE . . APR 0 71983 ~ ZONING ADJUSTOR SPOKANE COUNTY, WASHINGTON _T IN TNE MATTER OF CUE-5-83; SPLASNOOWN, ) FINDINGS OF FACT, DFCISION INC. - COMMUNITY WATERSLIDE AND OFF- ) AND CONDITIONS STREET PAR KING FACILITY ) THIS MATTER, Being the consideration b the Zoninq Adjusto r of Spokane County, approving the application (CUE-5- 83~, for the purpose of establishinq a communi ty watersl ide, concessions and off-street parking facil it,v, herein- after referred to as the "Proposal", and the Zoning Adjustor of Spokane County havi nq hel d a publ i c heari nq on Apri 1 1, 1983 and havi nq ful ly consi dered al l testi mony presented thereat, and further having vi si ted the si te and vi ci ni ty in question, and having rendered a decision on the 6th day of April , 1983, approvinq sai d proposal, does hereby make the fol lowina: FINDINGS OF FACT 1. That the proposal is qenerally located in Valley Mission Park, east of Pie rce Road, adjacent and north of Mission Avenue. Parking area is south of Mission Avenue. Parcel #'s 09543-0606 and 16542-0324. 2. That the oroposal consists of a conditional use request for a com- muni ty watersl i de, hot tubs, and smal l concession area as wel l as a condi ti onal use request for an associated 228 car off-street parking facility across Mission Avenue from the slide and park area. 3. That the adopted Spokane County Generalized Comprehensive Land Use Plan indicates Urban usage of the area encompassed by the proposal. 4. That the site is zoned Agricultural-Suburban and Agricultural. 5. That the existing land uses in the area of proposal include the exist- ing Valley Mission Park, single family residences to the south of the parkinq area, multiple family residences to the southeast, single family residences to the west and the park and Interstate 90 to the north. 6. That the appl i cant submi tted an Envi ronmental Checkl i st whi ch was re- viewed by the Zoninq Ad,justor and a Preliminary Declaration of Non-Siqnificance was issued for this Qroject on March 15, 1983. The Proposed Declaration was ci rculated to thi rteen local and state aqencies for comrnents and concerns re- qardinq the aroposal. No aqencies have recommended that the Proposed Oeclaration be changed. ' 7. The applicant has entered into a lease aqreement with Spokane County ~ whi ch al l ows for the operati on of the watersl i de acti vi ty on County property sub- ject to certain conditions. 8. That the wateslide activity is proposed to ope rate on 100 day seasons beqinning on Memorial Day (May 30) and concludinq on Labor Day. The daily ope ration of the slide activity would run from 10 a.m. to 10 p.m. 9. To handle traffic at the park, the applicant p roposes development of a pa rking area of initially 2.5 acres which may be expanded to 5 acres if warranted by parki ng demand. 10. That the p roposal is a Conditional Use within the Agricultural-Suburban zone under Sections 4.24.300 and 4.24.310 of the Spokane County Zoninq 0 rdinance. Additionally, the proposed uses compiy with the dimensional and location standards for these uses as noted in Zoning Ordinance Provision 4.24.300 (a) (2) (1); mini- mum lot size: 12,500 square feet, and 4.24.310 (b) (1); minimum lot size; 7,500 square feet, (b) (2) [the parking area must abut or be directly across the street from the property served by the parking area]. 11. Publ i c testimony from more than a dozen res4dents voi ced stronq concern over the development of the waterslide and parking facility. Chief concerns were that the praposal is a commercial use in a residential area. The parking lot which is located near residential uses will not be compatible with them due to noise, litterinq, liqhts and substantially increased traffic. J ~ i • s . • FYNDINGS OF FACT, DECISION AND CONDITIONS CUE-5-83 PAGE 2 12. The description of the proposal establishes that the proposed water- sl i de faci 1 i ty i s primari ly a recreational venture consistent with other park and playqround activities. Further, this use has been found in keepinq with the Spokane County Conprehensive Land Use Plan as indicated by a merto dated March 31, 1983 from the Spokane County Long Ranqe Planning Administrator. 13. The Zoning Ad3ustor notes that public testimony further indicated the pa rk's present uses of a softball field, swimming pool, picn3c a rea, tennis courts, etc., al ready util ize most of the existing parkina capacity at the park during the sprinq, summer and fall. 14. The Zoning Adjustor finds that the waterslide would contribute ad- di tional amounts of new traffi c to the i mmedi ate area whi ch requi res that a properly paved, fenced and iandscaped parking facility be vonstructed to handle the anticipated traffic and parking needs as noted in the conditional use standards (4.24.300 b2, b4 and 4.24.310 b5-9). 15. That vehi cul ar and pedestri an access to the si te i s pr+oposed to be re- viewed and controlled by the Spokane County Engineer's Office. The Enqineers Office has further made recommendations for this use to promote the public heal th, safety an d qeneral wel fare i n i ts i ni ti al operati on. 16. That the State Department of Social and Health Services has indicated that the applicant must conform to State Wastewater Disposal requlations and construct all necessary facilities to prope rly dispose of this wastewate r qen- erated by this use. 17. That i s i s di ff3 cul t to predi ct i n advance exactly the traffi c, park- inq an d use demands created by the proposal as there has been no previous experience with this use in Spokane County. 18. That to maintain compatibility af the project with ad,jacent uses, the project shoul d be administratively reviewed by the Zoning Administrator after the initiai season to determine if other reasonable conditions or limitations shoul d be attached for the conti nued use of the watersl i de and parki ng faci 1 i ty. 19. That the proposal', except as provided herein meets all current standards of the Spokane County Zoni ng Ordinance for thi s use. 20. That the proper leqal requirements for advertising of the hearing be- fore the Zoning Adjustor of Spokane County have been met. DECISION , From the foreqoing Findings, a review of the Planning Department File No. . CUE-5-83, testimony at the public hea ring, an d a site visit, the Zoning Ad,justor hereby in approving the proposal makes the followinQ conditions: Prior to occuaancy permit release and authorized use of the proposed faci 1 i ty, the appl i cant shal l: + A. COUNTY PLANNING DEPARTMENT 1) Submit a finalized development and parking plan fo r approvai to the Planning Department indicating the type of recreational facilities established and all proposed structures to be utilized in connection with the facility. 2} The existing parkinq area in Valley Mission Park shall be striped for parking in accordance with the Final Development Plan. 3) The parking area south of Mission Avenue shall: a) Be developed in compliance with setback requirements and be fully paved and striped. b) Be developed with a 6' sight obscuring cyclone fence along the paved areas easterly, westerly and southern borders. c) The appl i cant provi de and develop an evergreen and ground cover landscape plan for the front yard alonv Mission Avenue and side yard areas of the southern parking facility. ~ d) The applicant is responsible to control dust, litte r and othe r waste i n thE parki ng faci 1 i ty duri ng seasonal ope rati on. ~ ~ . • ♦ FINDINGS OF FAGT, DECISION ANO CONDITIONS CUE-5-83 PAGE 3 4) That the Director of Planning or Engineering may direct that the additional 2.5 acre off-street parking be developed at either's deter- mi nati on that the traffi c to the s i te requi res addi tional parki nq space. 5) That this project shall be monitored during operation and reviewed by the Spokane County toning Administrator in October, 1983. Further, conditions or limitations may be attached for subsequent use of the watersl i de and parki ng faci 1 i ti es. B. DEPARTMENT OF 6UILDING AND SAFETY 1) Al l bui 1 di ngs and structures requi re bui 1 di ng permi ts as per Secti on 301 of the Uniform Bui 1 ding Code. C. UTILITIES DEPARTMENT 1) Pursuant to the Board of County Commissioners Resolution No. 80-0418, the use of on-site sewer disposal sys tems is he reby authorized. This authorization is conditioned on compliance with all rules and requ- lations of the Spokane County Health District and is further conditioned and subject to specific application approval and issuance of permits by the Heal th Dis tri ct. 2) The owne r, his heirs or successors shall Join and pa rticipate in any petiti on or resol uti on whi ch pur ose i s the formation of a uti 1 i ty local imp rovement district (ULiD3 pursuant to RCW Chapter 36.94, as amended. The owner, his hei rs and successors shal l further agree not to oppose or protest any legal assessments for any utility local im- provement dis trict (ULID) established pursuant to RCW Chapter 36.94, as amended. 3) Any wate r service for this p ro3ect shall be provided in accordance with the Coordinated Water System Plan for Spokane County. 4) Each unit shall be double plumbed for connection to future area-wide colle ction systems. 0. DEPARTMENT 4F SOCIAL AND HEALTH SERVICES 1) Applicant shall demonstrate that the use is in compliance with all state requl ati ons regardi ng wastewater di sposal pri or to occupancy per- mit release. ~ E. HEALTH DISTRICT 1) Applicant shall demonstrate that the use is in compliance with all County regul ati ons regardi ng wastewate r di sposal . F. ENGINEERING DEPARTMENT 1) Applicant shall dedicate two (2) feet on Mission Avenue south side fo r ri ght-of-way prior to any use of the property. Need a 64' ri qht-of-way. 2) Access permi ts for approaches to the County Road System shall be ob- tained from the Spokane County Engineer. 3) Appl i cant shal l i mp rove Miss i on Aven ue i n a manner cons i s tent wi th Spokane County TYPICAL roadway secti on No. 1 mi nimum pav3ng wi dth Secondary Arteri al Standard. 4) Applicant shall submit for approval by the 5pokane Caunty Engineer road, drainaqe and access plans. 5) The applicant shall submit for approval by the Spokane County Engineer and the Spokane County Health Dis trict a detailed combined on-site sewage system plan and surface water disposal plan for the entire project. 6) The word "appl i cant" shal l i ncl ude the owner or owners of the property, his heirs, assigns and successors. ~ • ! • l FINDINGS OF FACT, DECISION AND CONDITIONS CUE-5-83 PAGE 4 7) The construction of the road improvements stated herein shall be accomplished as approved by the Spokane County Engineer. 8) Al l requi red improvements shal l conform to the current State of Washington Standard Specifications for Road and 6ridqe Construction, and other appl i cabl e county standards and or adopted resol uti ons per- taining to Road Standards and Stormwater Management in effect at the date of construction, unless otherwise approved by the County Enqineer. 9) Access to Maxwell Avenue shall be prohibited. 10) Roadway standards, typical roadway sections and drainage plan requi re- ments are found in Spokane County Board of County Commissioners Resolution No. 80-1592, as amended. 11) That the constructi on of this faci 1 i ty wi 11 gi ve ri se to the need for a delineated crosswalk on Mission Avenue and the installation of associated signs. It shall be the responsibility of the applicant to assure that these improvements are made. Applicant may arranqe with Spokane County to install the improvements. However, it will be done at the applicant's expense. 12) If in the future, Spokane County determines that a mid-block pedestrian signal is necessary to control pedestrian traffic to this facility, the signal shall be installed at the applicant's expense. 13) It may be necessary for the applicant to construct adequate barrie rs to control pedestrian access to Mission Avenue an d channel pedestrian traffi c to the approved crosswal k on Mi ssi on. OATED THIS 6th DAY OF April , 1983. G AS '-SlNING ADJUSTOR SPOKANE OUNTY, WASNINGTON . . . ~ • • ~ ~ ~ ~ ~ . . . . - - = Nxis 1"AX~r~~ ~ . ~ • , ► PLANNING DEPARTMENT • f N aDwqr sFt.•+if Pit *i-OINV., 721 ~V Fe.w40N :-aEE r 1 a: • ~ ~ hn rt` 51JU-_ 265 f 0 i~,~ • ~ ♦ SPJMANE N4!zIIEN4#1b7b 99260 SNVKAhc COuh3r caJk1 10 uSC MEMORANDUM T0: ZONING ADJUSTOR FILE CUE-5-83 SPLASHDOWN, INC. ATTENTION: ZONING BOARD OF ADJUSTMENT FOR SPOKANE COUNTY FROM: THOMAS G. MOSHER, AICP, LONG RANGE PLANNING ADMINISTRATO dATE: MAY 5, 1983 4t SUBJECT: COMMENTARY IN ADDITION TO ZONING ADJUSTOR FINDINGS DATED APRIL 6, 1983 The above referenced Zoning Adjustor case has been appealed to Spokane County Zoning Board of Adjustment. The case wi11 be presente d to the Board vf Adjustment at 9:00 A.M. on May 9, 1983. A review of the Zoning Adjustor findings suggests the Board may wish to clarify several points if their decision is to reaffirm a11 or a portion of the decision af the Zoning Adjustor. There are really two issues before the Board which are combined under the same file number. Th,ere is the issue of whether Qr not to issue a conditional use ialley-Mi'ssion ermit for Splashdown's waterslide „activi~~ proposed to 6e contained in the County Park. The second issue is whether or not t~rant -Mroval to the requested condi ti onal use permi t for an offs ite-parV~g ~ t tmnedi ately south of the Coun'ty park and-The proposed Splashdown facirifty and as proposed to be loca e on fhe south side of Mission Avenue. The folTowing points are raised for cvnsideration by the Board: (1) although side yard landscaping is stated as a condition in the written decision, the approved site plan does not indicate either the presence ot design of side yard landscaping for the parking ]ot on the south side of Missian. (2) With regard to the landscaping, I find there to be no reference to requiring that the landscaping be irrlgated and maintained on a periodic basis at the applicant's expense or responsibility. I would so recommend. lot There is some question with regard to whether or not tl~e parking on the south side of Mission would be closed, inc1uding locked gates, during the off-season. I recommend that this issue be addressed by the Board. (4) This kind of activity, as located alongside of a major interstate highway, will invariably attract a certain number of vacationers who would ordinari1y not stop at Valley-h1ission Park. Some of these vacationers will be arriving in completely self-contained recreational vehicles. The decision makers should address whether or not to allow self-contained recreational vehicles to remain in the parking lot overnight. If it 1s desirable to disallow such an overnight use, then the project sponsor should be directed to specifically take steps to see that the situation does not occur. (5) It is allowable to have some alcoholic be verages in a County park. The Board should address the matter of whether or not any, or some, permitted alcoholic beverages should be consumed within the Splashdown area. Consideration should be given to any negative effects that alcohQlic beverages may have on swimmers. ~(6) ~,iere aeparantl has been some discussion with regard to a ~ pedestrian overeass ~etween fhe soufh parking i'ot anc-fhe SplashdowrL concession itsef"f. `t' tfPls i s desi ra'le to t-he goarr''~i t woul d be advisable to es a is it as a possi 1 1 y as associated with a 19 r ~ . . . ~ ' . ~ . a . , . PLANNING OEPARTMENT FlA(dAi1WAY CENYHL ~J4Iliirt,4 N 721 .JEFFEW%,CN iTHEE $ ~ . ~JPHrItiE 45Ct 22CS ' • ~ SWUdARIF Na~ItIM1taTn~R. Ps926O ~i►~wpht C~14t/TY CdH Ql Wk1Nf1G potential need far a pedestrian si~,nal. It may we11 be a~r priate to stqte ga ~y e reauired at a 7ater date at the owner's i e ? e . In order to insure that all of the conditions which may be imposed if approval for these projects is granted, it would be practical to have a"sign-off" in the Planning Department prior to the issuance of an Occupancy Permit. (8) The decision as issued by the Zoning Adjusto!r stipulates that a review woul d occur i n October of 1983 as a means of determi ni ng whether or not additional ad3ustmerts shou1d be made to the project or to the parking situation. It might be advisab1e for the 6oard to ca11 for a review at the completion of the first fu11 or partial season, lregardless of whether it occurs in the fa11 of 1983. There seems to be a need to involve citizens of the area in such a review. Toward that end, it might be advisab1e to ca11 for a public hearing or meeting for the purpose of receiving commentary prior to any decision issued to modify these conditiona1 use permits. Or, alter- natively, an administrative decision made wlthout benefit of public gathering could be advertised and posted in a manner which would allow an appea1 to a public meeting situation. cc: A1bert "Sam" Angove, Director, Parks and Recreation Department James P. Emarcio, Chief Civi1 Prosecuting attorney AA ~ . . . ~ , Con[act Person Name 8ueiaees NBme { A+ddress Addreas Phooe Phone ' Couaty Contact Person Phone No. 456-3600 C4MMERCIAL BUILDING FBRMIT RBVICsW This building petmit review ia intended to appraiee qou of the improvemeats (roadway, eide- walk, curb, etormwarer, etc.) which muet be conetructed in aseociation witb your building permit. This checklist will be filled out by the Engineer's staff and a copp will be returned to you at the time that the permit ia initialed by the Bngineering Department. All tequirements shall be completed prior to iseuance of the building permit. All un- checked boxes require additional reaearch or information to make a determiaation. 1. Stormwater Drainage Coasiderations A. Per guiXeMnee'-lor "$tormwater Maaagement 1981" both on and off eite. ~ 1. 208 Coneiderations* E] ye8 ~ NO ' . 2. Flood hazard zone coneideratione*; n Yee ~ No 3. Storm Dreinage Plan ~ Yee ~ No II. Planning Action # . l. Resone, Conditional Uee or oariaace on property ~ ye8 ~ bb 2. Are requiremente of planning action incorporated ~ Yes ~ NO iato eite plan III. Right of Way 1. Does permit necesaitate B.O.W. dedication n Yee n No 2. Did zone change require R.O.W. dedication ~ Yee ~ No 3. xadiue at corner ~ Yea ~ No IV. Countq Road Improvemente l. Roade need to be improved. Aow wide 11 Yes r] No 2. Curb Ij Yee n Ho► 3. CxP/RID agreement ~ yes n No 4. Plans for improvemente provided ~ Yee ~ No► 5. SideWalk ~ Yee ~ No V. Parking Plaa b Approach Location 1. Review and 81gn of f by ZYaf f ic ~ ye8 ~ No 2. Approach Permit from Engiaeer' e Office El ye8 * E) No 3. State or City aign off ~ Yes ~ IiTo VI. Field Review: Preliminary Commenta ~ All land Within the Aquifer Sensitive Area, where deemed Feasible by the County En,gi- neer, ehall incorporate stormwater treatment to mitigate the potential for groundwater degradation. (See Guidelinea fo= Stormwater Management 1981, Spokane Board of Gounty Commissioner'e Reeolution No. 80-1592, ae amended.) The purpase of flood hazard zone review is to miniwize losses due to floodin,g in spe- cific areas designated by Flood Hazard Boundary maps on file at the Gaunty Engiaeer's Office. (See Spokane Board of Couaty Commissioner's Resolution No. 81-0726, as amended.) ~ ~ . - ~ . M f ~ f ()f~ ~/A-l J Ur1 t~• • s var v~~~.-.v. . . . r."- - - - - ft 1 ~ • > i r~_ ~ s n ~ ' ,r ' ' . ab 'a ; • • «A• M1NIMIIM MA.t I MIIM L. ' U l%I. F KOM Dl ti7 . CURB ELEV. ClIKH tL1:V. SI.LtG7 tl) x GltALt STA. ELEV. ELfW. tu L.P. FkUM t'.I'. (4.5z SLOPk (l7. 51,n1'E E,Lt%'. Tu CURB FROM E. p. + Fkhrl E. P. + CURB IiElGif'T) CUKI3 HEIGHT) . 10 ~ P,~ ~ , v. c. . 04-40 ,~.x 7.64 t i. z4. 1~= 20~7 e~ zz17 z-&> 1,?>.2' 2 a' zo17, 6(0 ZO 17.73 2017. && 17 18 17, 9' 4 11 17. 17 LO ' 1+,50 17' 3z 17 ~4,~4, 17- zo 17 31 1-7 - sa 17, 2& 14'7/5 17 !o' 1l051 17 az 1& 34- z+00 14.57 1& zPk 175' 1cP 58 t&.&z z„+Zjr I& z.2.. 15.0>5 175; 1` 2.,~j z~ t50 15-87 17 4' -4.&' 15 85 )10,c0 S.ga ~ ~.94 . 1.5p.10,0~ 17z 4.8' 15 47 15•5'~ 15•'4~ 14,•&~, 17•3 ~4.7' 14 e6 15 1o 3;z~ t 14.46 14•17 17.4 ~ 14 57'r 14~48 ~-z o jo 3 ~~p 13. !5,5 13,4~ 17 5~ 95 14•0~ 13. 98 1 3;7~ 13.r¢(o i3,140 17.31 4.71 13. +5 13•~'j7 13.~8 ~ t~ 1z•36 1z 7g 17.3~ -4 7' 13,0e 13,40 iz.~~ M-1' tz.73 1z. 73 J . - ~ . ` t lt I tl INtc~K%InIJvn . . . T• ~r~~. - • 1l:' U-+ lib . • . ` MINIMIIM MA.'( I MUM , ~ L.!'. ' LW;i. F'KtlM plti1. CURB ELEV. CUkl3 EL1:V. SLLECTti) ~ STA. ELEV. ELt.V. S tu L.P. }KuM E'. ti. (4.5Z SLOPE ('lZ Si.nPE LLtV. ~ TU CURH FROM E. P. + E'KUki E. E'. + CURB IiEIGt1T) CURB HEIGHT) , E - ~ af-90 7. s~f -r 1+6r~' 2017 83 zo17.Z.-,5 1,:>.z' 2017, zo 17.73 za1 y. 1+2~ 17. (o1 1718 17• 4.1 - ' ' 17, 54 1 7!oo 1+,5a 173Z 1la. :5o 17 441 ~ 17.zo _ 17 31 17,2~ 1~-75 1~9~ 1o c.1 17 4.4~ 14.31 17 az 1b,C>4- , 1&•57, 1& z8 175' t~(O.ss 16.& 9 z.~+yZS l~.zz, 15.°>5 17•~~ __~4.Y5' 1L z5 14.3& , _ - - , Z,ti0 _ 15,87 15 5g 17• 4' 815 1~6.00 5•ge i~ ~ . 2.+7'~ ,,!~.~b 17z 43 15 47 15.~ 15.~ 1~•~,9 17 3~ 4-7' 14•~ 1~.1d 1'~,~9a _ 3~-2,5 1 ^ 14•46 14•17 17. 4' 4,' 14 57 1448 3t50 ~3~~5 ~7.5' -4.5~ - i3.95 14•0~ t3.98 3♦ 75 13. 4& 13,140 ,17.3" , 4;7 ' 13457 13.5 7 l 3. 48 4 tOO lz 96 1z.7g 173 -4.7' 13.08 13,zQ 13. ~ 1 -1 •5 % •¢+,Zj 1z.50 1Z33 17.z' iz.101, Iz,73 iz.73 . - - , - - y - . ~ _ F . Sgakane County Purchasing Agent november YO 23, 1982 M. 911 Jefferson 11:00 A.M. a SpQkane, WA 99260 Bids wi11 be received by the Purchasi.ng Department at the above address until 10:55 A.M. of the appointed day. Thereafter, at 11:00 A.M. a gublic bid opening will be heZd in the Camm-issianers Assembly Room, Spokane County Courthouse, W. 1126 Brvadway Avenue, Spokane, WA 39260. PrQmptly at 11:00 A.Ni., after a last call for bids, they wi11 be opened and read aloud. ADUITIUNAL CQFIES M[dST GO T0: (]NE COPY OF BID TO: CL4JSING DATE A'ND 'I'TME: CLty Clerk (Fifth Flvor) Novembar 10 23, 1982 west 808 Spokane Falls Blvc3. 10.00 A.M. Spokane, WA 99201-3316 ONE COPY OF B][ D TO: City Purchasing Dxrector Nawember X¢ 23, 1982 Room 14, Council Chamber Level 10:00 A.M. West 808 Spokane Fa11s Blvd. Spokane, WA 99201-3316 It will be the sole responsi.bility of bidders to ensure bids are in the possession of the 5pokang Cawnty Purchasing Department and the City of Spokane hy the appointed date azad tzme. Page I. of 12 ~ 4 ~FFI~E OF CO[XNTY ENGINEER SPOKAME GOUMTY, WMH1NGTON . DMat~ 16 September 81 ~ w~icat~~ POr27 Ts, ~a= alme - ,au ~',~1, ►n Frem balfiAkwrer ~ Right af i1m Dovuments - Variauoes aad Zane Cbsngee - Ia ovdor tar the 81ght of Yey Dspartment to g"perly prapare the neoeeeaW dooumemte required in conueatian xitb varianaee axxd zone ahangse it i■ ntroersasry that we be providod oauuUaia informtion. Withaut the p r a~ into~stion thwre +~anld ~ doI+~ aac~ 9 ixioor"ot daouments an~ derori~tiou~. Th+r minimum infonatlon we should bs pravfded ie: l. Copy of Duildizig Parsit• 29 Copy of Engineer' e Seatian map slonring road iaralviA. 3. CopW of Asseseor' s map ehcririAg iavolv". . 4. CoW of Conditiwu of agpraval if warianoe or zam ohaqpd Tsaot X iafomation (ig nm~osaa) . Fam s27-c 0 d