2012, 04-26 Permit: SW-12001215 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Dale:
Application Number: SW -12001215
04/26/2012
Expiration Date:
Project Description SEWER CONNECTION
Primary Contact: C & S CONSTRUCTION OF SPOKANE
INC
Applicant C & S CONSTRUCTION OF SPOKANE
INC
Permit Type: SEWER
Address: 525 S BARKER RD
SPOKANE VALLEY, WA 99016
Phone:
Email:
SITE INFORMATION:
Site Address: 13722 E 10TH
Owner: C & S CONSTRUCTION OF SPOKANE
INC
Parcel Number: 45224.5003
Address: 525 S BARKER RD
SPOKANE VALLEY, WA 99016
Subdivision:
Phone:
Assessor's Description: SP 36-06 LOT 3 (AFN# 5728726)
Email:
Inspection Area:
Water District:
Vera Fire District: Fire District 1
Irrigation District
#15
Zoning.
Land Area. 0.4749 acres / 20686 sqR
CONTRACTOR INFQ RMATIQN-
General Contractor
CSCON''022JM
C & S CONSTRUCTION
525 S BARKER RD
GREENACRES, WA 99016
509-951-0637
-------------------------------------------
DETAILS:
Class Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION
1 $125.00 $125.00
$125.00
FEE DETAIL:
Processing - Utilities $25.94
Utilities Permit $125.00
Total Fee: $150.94
CONDITIONS:
CALL 1-800424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING
DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
-- — — — — — — — — — — — — — — — — — — — — — — — ——————————— —————————— — ——— ——
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5.00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
Date Printed'. 04/26/2012 08'.56:31
Printed by: 115 APPPOODASP. NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -12001215 04/26/2012
Expiration Date:
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION. _________________________
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed. 04/26/2012 08.56-.31 Printed by. IIS APPP00L1ASP. NET v4 0