09-127.00 Inland Asphalt: Sprague Ave Rehab Ph 1
'
L
Washington State Change Oraer 1
Department of Transportation
Date Julv 31, 2009
Page 1 of 4 Papes
Contract Number 09-031 Federal Aid Number ARRA-3840 (008)
Contract Title Sprague Avenue Rehabilitation Project #1
Change Order Number 1
Prime Contractor Inland Asphalt Co.
Ordered by Engineer under the terms of Section 1-04.4 of the Standard Specifications
❑ Proposed by Contractor
Endorsed By , Surety Consent ~
f
Conitr or Attomey of Fact
'~1lfrw • ~ i ~C
Date ~ Date
Original Contract Amount $ 2,256,393.18
Current Contract Amount $ 2,256,393.18
Estimated Net Change This Change $ 1,800.00
Estimated Contract Total After Change $ 2,258,193.18
Approval Required Region ❑ Olympia Service Center v Local Agency
If the amount authorized in the Local Agency Agreement is exceeded and federal funds are not available for this
change, the Local Agency will assume the total cost of this Change Order.
X App al Recommended ❑Approved Approved
Project gneer Approving Author er C.A. Agreement
e7'10q 6~I 1~)
Date ' ` ' Date
❑ Approval Recommended ❑Approved Approved
By Approving Authority per C.A. Agreement
Date Date
-127
CHA.NGE ORDER
Page 2 of 4
Contract No: 09-031 Change Order No. 1
This Contract is revised as follows:
Description of Work
The Contractor shall install Catch Basin Type 1 L at eighteen (18) locations. The Type
1 L Catch Basins will replace the type 1 catch basins on the plans at locations J, K and
L. Two (2) Working Days will be added to the contract.
Materials
The Materials shall meet the requirements of the 2008 Standard Specifications sections
7-05 Manholes, Inlets, Catch Basins, and Drywells and the Standard Plan B-5.40.00
included with this change order.
Construction Requirements
Work shall meet the requirements of the 2008 Standard Specifications. The installation
of the Type 1 L Catch Basin shall include all labor, materials, tools, equipment,
excavation, backfill, frames, covers, grates and incidentals required to complete the
work.
Measurement
"CATCH BASIN TYPE 1 L" will be measured per each.
Payment
Payment will be made in accordance with Section 7-05.4
"CATCH BASIN TYPE 1 L" will be measured per each.
CHANGE ORDER
Page 3 of 4
Contract No: 09-031 Change Order No. 1
Item No. Item Description Unit Unit Price Est. Qty. Est. Amt.
Measure Change Change
13 CATCH BASIN TYPE 1 EA $1,288.00 -18 $ (23,184.00)
56 CATCH BASIN TYPE 1L (INCL MARKUP) EA $1,388.00 18 $ 24,984.00
SUBTOTAL $ 1,800.00
TOTAL $ 9,800.00
!
•
CHANGE ORDER
Page 4 of 4
Contract No: 09-031 Change Order No. 1
W.. c W r.~.`rmir.Y.oi''~~ ri.~e°~u ~ Q K
iML00. 1Q1lWONi1P6 TXY
0
1111.5 ~
a~ J° •:~a~,. ~F~
Q- mtc a G
~
$ ~ L ;s o 6 , ao' o r !
jg q m G1 ~ df
~ 5 ~ N . ~ $ ~
~ ~ g_ g .2
MA
ti 1
es tmc'2
Fr~ g:~
o 10 c ~
~
' E E 5
~ ~
~N
E W
~ ~ ofm4W~ 2F
~Q 9~~~ 9 ~t9 y d / ~ . - • • •
! 91- E. ~ ~
~ s V
~0E ti 5~O
E9~ii 1.2 o
0 y n
M~ ~ 3 ~
~ ~a ~ ~ ~ a - - - • ~
is
N Z E g ~ 2
C
W W
W ~ ~ ~ F N & ~
o
~ y
a ~ o$ ~ #y ~y / - ~\:•'i•.-~.. ~
o u.
a •
s 0~
~ X.a~•~ ~
~ • - i`~' cai
0
S2x
T~ ~g
~
~ ,q~
Q z~ N
p~ o ~ Z
zd ~ v~
~
LU g ~
8
~
V
~
h11riS KMYri ~l9 Ni15tlN0