2009, 04-14 Permit App: 09000887 Deck Project Number: 09000887 Inv: I Application Date: 4/14/2009 Page 1 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information:
Permit Use: 8 X 20 DECK Contact: DUPONT CONSTRUCTION
Address: 622 E DECATUR
C-S-Z: SPOKANE,WA 99206
Setbacks: Front Left: Right: Rear: Phone: (509)489-5720
Group Name:
Site Information: Project Name:
Plat Key: 999999 Name: SUB-04-04 District: Sout
Parcel Number: 45213.3401 Block: Lot:
SiteAddress: 10824 E 12TH AVE Owner:Name: MANEY,BRIAN C&MEGAN M
Address: 10824 E 12TH AVE
Location::CSV SPOKANE VALLEY,WA 99206
Zoning: R-3 SF Res District
Water District: 007 MODEL Hold: ❑
Area: 8,568 Sq Ft Width: 0 Depth: 0 Right Of Way(ft): 0
Nbr of Bldgs: 0 Nbr of Dwellings: 0
Review Information: v.0,1 "Na=ck � - ,� .0 �. . g. ta3, rg ,rg ,y ��; ,-
Review
Building Plan Review Released By:
Originally Released: 4/9/2009 By: tmelbourn
Landuse/Zoning/HE Conditions F Released By:
Originally Released: 4/14/2009 By: KKENDAL
Operator: JD Printed By: jnun Print Date: 4/14/2009
Project Number: 09000887 Inv: 1 Application Date: 4/14/2009 Page 2 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Building Permit
Contractor: DUPONT CONSTRUCTION INC Finn: CHRIS DUPONT/DUPONT CONST
Address: 622 E DECATUR Phone: (509)489-5720
SPOKANE,WA 99207
This Application: Total Project:
Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation
DECK OPEN R-3 VB 160 $2,400.00 160 $2,400.00
Totals: 160 $2,400.00 160 $2,400.00
Item Description Units Unit Desc Fee Amount
RESIDENTIAL PERMIT FEE 1 SELECT $83.25
WSBCC SURCHARGE 1 SELECT $4.50
SF PLNS RVW<7999 SQ FT 1 SELECT $33.30
Permit Total Fees: $121.05
PUD LANDSCAPE REQUIREMENTS MUST BE COMPLETED BY MAY 1,2005,PRIOR TO
ISSUANCE OF BUILDING PERMITS.H KAUER
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $121.05 $121.05 $33.30 $87.75
$121.05 $121.05 $33.30 $87.75
Disclaimer:
Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information
contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: jmm Print Date: 4/14/2009
Permit Center PERMIT NUMBER: �� � t
__ 11703 E Sprague Ave,Suite B-3
Spokane Spokane Valley,WA 99206 PERMIT FEE:
Valley' (509)688-0036 FAX: (509)688-0037
www.spokanevalley.org
Community Development
Residential Construction New Construction Accesso _Bldg
Permit Application — Addition/Remodel
Other:
SITE ADDRESS: kO2
ASSESSORS PARCEL NO: LEGAL DESCRIPTION:
Building Owner:
Confractor r '' '
�: N : OP — ' �-
Name. t�� tiA � ame: .,at_ S% �-�Address. t-b^ Address:CD Z , OF,c-
City: State: Zip ei City: I State + Zip ii L
Phone: i _04e71 Fax: Phone: III Fax:
Contractor Lic No: Exp Date: `O
Contact person . City Business Lie.No: (�
Name: �, .0 L 900c 1,'O�� �-•X -
Phone:
Describe the scope of work in detail: Cost of Project: $ ' 3j
O -
,-A, ac C2r Wcam'?
Proposed Use:
**************The following MUST be complete: (write N/A if not applicable)**********************
HEIGHT TOP : DI NSIONS: #OF STORIES: TOTAL HABITABLE PACE:
NuRS'SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE
MAIN FLOOR TO SQ. 2 FLOORAREA:
FTG: '''.. �-
FINISHED BASEMEN K C
GARAGE SQ. FTG: /PE OVFTG
. PATIO SQ. :- 30% SLOPES ON
LOY�—
SQ. FTG: PROP SEPTIC?
#OF BEDROOMS CONSTRUCTION E HEA OURCE: SEWER OR SE
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling,the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws,codes or or.inanc- 6) Pla -. •**tonal information may be required to be sub ed, a d subsequently approved before
this application can b- p •j : . • •
f '9
J!julI►. •�!� DATE: ` r.fifrO:NNE:IA.:LEY
SIGNATURE: a, `
APR 0 ZMethod of Payment: Mastercard ISA❑ Cash ❑ Check ❑ VIN#: BY, yr'tHMI I
Bankcard#: Expires:
Authorized Signature: Ilk,�
t
REVISED 2115/07 ni
_
i4— a.... QD 1.....0
"61 c -rJ4"
r::;?
t t,
, ..,-;t- ......
.. ,
il\,)
LW:ca.911
1, r,
, .
vkA,vv,‘„qo p.,_.... v--,\v (77, r,,,:‘,,,,,, __,
---__.
I &iv
, ---AlliVil RAVNin,i r,
I 1!0
\t•Ana."-.... _ _ ,.,_ : II,
1,01-- f
''''' •
i 1 -r-
\,1, ,44, , ,I_HI 2 Z 4' ‹..
-
,
i
1
14 L4
/4....__________ 5d
; e )
.s1--- -44
f::;)'••••) /'
_
.c ,i6ct, fra
,e______2 4 -
\---e‘
:
t‘.c...- 2. , '-oLi
1 w -,...... 4,-..e
, . .,
= \ 4
, - ...." 1
...... ---I L..1
..--
,:.
For City Use Only
CITY OF PLUS Project Number I
SProject Address
pokane 0 � _ z
liie)T° 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is \)41 \\
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re-submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure,you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone,fax, email,or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re-
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE—APPLICANT PINK—BUILDING FILE REV 9/07