Loading...
1994, 11-15 Permit: 94011400 SewerSPOKANE COUNTY DEPARTMENT OF BunDINGS WEST 1026 BROADWAY N SPOKANE, WA 99260-0050 (509)456-3675 SITE INFORMATION PROJECT INFORMATION SITE ADDRESS: 10104 E 13TH AVE SPOKANE NA 99206 PARCEL NUMBER: 45204.2525 SUBDIVISION: UNIVERSITY PLACE LOT: 6 BLOCK: 24 ZONE: SFR INSPECTOR: DAVE SILVA NATER DIST: OWNER: MORLAN, HARRY PHONE: 509 926 1T34 ADDRESS: 10104 E 13TH AVE SPOKANE NA 99206 PROJECT NUMBER: 94011400 ISSUE DATE: 11/15/94 PERMIT USE: SEVER CONNECTION - UNIVERSITY PLACE (945.1288) APPLICANT: H & S CONSTRUCTION PHONE: 509 926 8964 ADDRESS: 11817 E VALLEYVAY SPOKANE NA 99206 CONTACT: VIRGINIA PHONE: 509 926 8964 SETBACKS -> FRONT: NA LEFT: NA RIGHT: HA REAR: NA LENDER NAME: PHONE: ADDRESS: PFRMIT(S) SEWER PERMIT CONTRACTOR H & S CONSTRUCTION LICENSE #: HSCON'*123KF BENIN CONNECTION 1 4ROCESSING FEE 10.00 TOTAL PERMIT FEE $50.00 FILE PAYMENT SUMMARY NOTES PAYMENT DATE RECEIPT# PAYMENT AMOUNT **'FOR SEWER STUB AS -BUILT INFORMATION AND INSPECTIONS, CALL ____________ ________ -------------- 1 THE COUNTY UTILITIES DEPARTMENT AT 456-3604*** 11,15/9L 00013588 550.00 TOTAL FEES AMOUNT PAID AMOUNT OWING _________________________ _____________ $50.00 $50.00 $.00 ISSUED PERMIT BY: CAROL FRAZIER CONTRACTOR OR APPLICANT IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION TO LOCATE BURIED CABLES, GAS PIPING, WATER LINES, ECT. CALL BEFORE YOU DIG (456-8000) SEWER STUBS ARE TO BE CHECKED PRIOR TO CONNECTION TO INSURE THAT THEY ARE CLEAR AND UNOBSTRUCTED TO THE SEWER MAIN * ** CALL FOR INSPECTION PRIOR TO COVER "'**"" 24 HOUR NOTICE REQUIRED NOTICE It c the responsibility of the permittee, not Spokane County, to see to it that the use described on the front of this permit complies with applicable codes and requirements and that required inspections are requested. Failure to request required inspections and obtain the necessary approvals prior to progressing beyond the point where Inspections are required may necessitate removal of certain parts of the construction at the owner's/permlttee's expense. At a minimum, the following inspections ARE REQUIRED by County Code: 1. FOOTING when forms and reinforcement are in place and prior to placement of concrete. NOTE: This inspection includes review of the structure's setbacks from property lines. Minimum setbacks are established by County zoning regulations- Typically, side and rear yard setbacks are measured from property lines, while setbacks for yards abutting streets are measured from the property line or the center had of the roadway right of way, whichever provides the greater setback from the center line of the roadway right-of-way. Curb lines and fence lines are not necessarily indicative of property lines. In some residential areas, the County can own as much as 20 feet of right of way between your property and the actual improved street/curb. The responsibility to comply with applicable setback provisions lies solely with the permittee—neither Spokane County nor its authorized representatives assume any responsibility for the verification or location of your property Imes. Please verify their location prior to locating your structure. Failure to properly locate the structure may require to relocation at the owner's/permittee's expense. 2- FOUNDATION when forms and reinforcement are in place and prior to placement of concrete. (Blocking for a manufactured home is required to be Inspected prior to the installation of skirting-) 3. FRAMING - after all framing. bracing and blocking is in place, and prior to concealing - 4. INSULATION - prior to the installation of drywall. 5. PLUMBING - after ro-ugh-in, before covering, and final. 6. MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment, and final 7. FINAL - when complete and prior to occupancy anti/or use Please provide 24 hours notice NOTE In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit Items such as the installation of fire hydrants, fire department access, on-site drainage ("208 swales"), road improvements, parking, and landscaping are common requirements of a permit/she plan which must be completed prior to final approval of a building or Issuance of a Certificate of Occupancy Inaddition to the above any plumbing or mechanical systems or materials which would be concealed by framing, drywall, concrete, etc., must be inspected prior to cover. Check with the department for " special Inspections" in conjunction with commercial projects. CALL 456-3675 FOR INSPECTIONS. TO INSURE PROMPT SERVICE, PLEASE GIVE 24 HOUR NOTICE. YOUR INSPECTOR IS UNDER CERTAIN CIRCUMSTANCES, PARTS OF YOUR PROJECT MAY REQUIRE INSPECTIONS FROM OTHER AGENCIES: • Road cuts for utilities or drives, County Engineer's Office of 36C9 or State Duoartment cf Transportation 456-3000 • On-site wnse disposal system. Spokane County Health Dlsthot 324-1560 nstrucnn ori a flood plain, County Engineer's Office 456-3600 Sewer connection, County Utilities Department 456-3604 or City Public Works Department 6256300 Electrical wiring, Stale Department of Labor and Industries 324-2640 EXPIRATION Unless otherwise noted, this permit will be considered null and void by limitation of the work authorized by the permit if not commenced or is stopped for a period of 180 days, unless a written request for an extension of the permit is received and approved by the Building Official prior to expiration. At a minimum an inspection should be requested at least once every 180 days to assure the validity of the permit. A permit may be renewed within one year of the date of expiration for one-half the original tee, subject to certain limitations—please call us If you have any questions. MISTAKES? If you hank we've made an error in processing this permit or in conducting Inspections pertaining to IL or find erroneous information in the permit, he, bring it too enaction Imn ledina'o by filing a written reouest for correction within 10 working days of discovery- All such requests should be (lire, ran to f 1 crimen f R idmps at fit, ucLIP, found on the face of this pemnL cerbly have exal I:en - 'aho,. state f cat he :prom a.ior suntanned m it and submitted by me or my agent to compile said permitlapp -tion Is Iru uu ^prize Spoxerne County to proceed with processing- In addition, I have read and understand ad INSPECTION REQUIREMENTS; HOT. OE µ,visors Included herem and agree to comply with same. All provisions of laws and ordinances goveming Plus lose of work coal re -^nwith whether specified herein or not. I understand that the issuance of this permit/ application and any subsequent inspection approvals o- Ceddieates of Occupancy shall not be construed to give authority to violate or cancel the provisions of any s',me or 'rcol .raw requlat q .r Ln .n., f cinbriu,sni, web the provisions of any state or local laws regulating construction. 5 GNAT UHE OF APPLICATION TB: NSR OR A. 1-N1 DATE