1994, 11-15 Permit: 94011400 SewerSPOKANE COUNTY DEPARTMENT OF BunDINGS
WEST 1026 BROADWAY N SPOKANE, WA 99260-0050
(509)456-3675
SITE INFORMATION PROJECT INFORMATION
SITE ADDRESS: 10104 E 13TH AVE
SPOKANE NA 99206
PARCEL NUMBER: 45204.2525
SUBDIVISION: UNIVERSITY PLACE
LOT: 6 BLOCK: 24 ZONE: SFR
INSPECTOR: DAVE SILVA
NATER DIST:
OWNER: MORLAN, HARRY
PHONE: 509 926 1T34
ADDRESS: 10104 E 13TH AVE
SPOKANE NA 99206
PROJECT NUMBER: 94011400 ISSUE DATE: 11/15/94
PERMIT USE: SEVER CONNECTION - UNIVERSITY PLACE (945.1288)
APPLICANT: H & S CONSTRUCTION
PHONE: 509 926 8964
ADDRESS: 11817 E VALLEYVAY
SPOKANE NA 99206
CONTACT: VIRGINIA PHONE: 509 926 8964
SETBACKS -> FRONT: NA LEFT: NA RIGHT: HA REAR: NA
LENDER NAME:
PHONE:
ADDRESS:
PFRMIT(S)
SEWER PERMIT
CONTRACTOR
H & S CONSTRUCTION
LICENSE #: HSCON'*123KF
BENIN CONNECTION 1
4ROCESSING FEE 10.00
TOTAL PERMIT FEE $50.00
FILE
PAYMENT SUMMARY NOTES
PAYMENT DATE RECEIPT# PAYMENT AMOUNT **'FOR SEWER STUB AS -BUILT INFORMATION AND INSPECTIONS, CALL
____________ ________ -------------- 1 THE COUNTY UTILITIES DEPARTMENT AT 456-3604***
11,15/9L 00013588 550.00
TOTAL FEES AMOUNT PAID AMOUNT OWING
_________________________ _____________
$50.00 $50.00 $.00
ISSUED PERMIT BY: CAROL FRAZIER
CONTRACTOR OR APPLICANT IS TO FIELD LOCATE AND CONFIRM THE
ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER
EXCAVATION
TO LOCATE BURIED CABLES, GAS PIPING, WATER LINES, ECT.
CALL BEFORE YOU DIG (456-8000)
SEWER STUBS ARE TO BE CHECKED PRIOR TO CONNECTION TO INSURE
THAT THEY ARE CLEAR AND UNOBSTRUCTED TO THE SEWER MAIN
* ** CALL FOR INSPECTION PRIOR TO COVER
"'**"" 24 HOUR NOTICE REQUIRED
NOTICE
It c the responsibility of the permittee, not Spokane County, to see to it that the use described on the front of this permit complies with applicable codes
and requirements and that required inspections are requested. Failure to request required inspections and obtain the necessary approvals prior to
progressing beyond the point where Inspections are required may necessitate removal of certain parts of the construction at the owner's/permlttee's
expense. At a minimum, the following inspections ARE REQUIRED by County Code:
1. FOOTING when forms and reinforcement are in place and prior to placement of concrete.
NOTE: This inspection includes review of the structure's setbacks from property lines. Minimum setbacks are established by County zoning
regulations- Typically, side and rear yard setbacks are measured from property lines, while setbacks for yards abutting streets are measured from
the property line or the center had of the roadway right of way, whichever provides the greater setback from the center line of the roadway
right-of-way. Curb lines and fence lines are not necessarily indicative of property lines. In some residential areas, the County can own as much
as 20 feet of right of way between your property and the actual improved street/curb. The responsibility to comply with applicable setback
provisions lies solely with the permittee—neither Spokane County nor its authorized representatives assume any responsibility for the verification
or location of your property Imes. Please verify their location prior to locating your structure. Failure to properly locate the structure may require
to relocation at the owner's/permittee's expense.
2- FOUNDATION when forms and reinforcement are in place and prior to placement of concrete. (Blocking for a manufactured home is
required to be Inspected prior to the installation of skirting-)
3. FRAMING - after all framing. bracing and blocking is in place, and prior to concealing
-
4. INSULATION - prior to the installation of drywall.
5. PLUMBING - after ro-ugh-in, before covering, and final.
6. MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment, and final
7. FINAL - when complete and prior to occupancy anti/or use Please provide 24 hours notice
NOTE In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site
plan) required by ordinance or as a condition of approval of this permit Items such as the installation of fire hydrants, fire department access,
on-site drainage ("208 swales"), road improvements, parking, and landscaping are common requirements of a permit/she plan which must
be completed prior to final approval of a building or Issuance of a Certificate of Occupancy
Inaddition to the above any plumbing or mechanical systems or materials which would be concealed by framing, drywall, concrete, etc., must be
inspected prior to cover. Check with the department for " special Inspections" in conjunction with commercial projects.
CALL 456-3675 FOR INSPECTIONS.
TO INSURE PROMPT SERVICE, PLEASE GIVE 24 HOUR NOTICE.
YOUR INSPECTOR IS
UNDER CERTAIN CIRCUMSTANCES, PARTS OF YOUR PROJECT MAY REQUIRE INSPECTIONS FROM OTHER AGENCIES:
• Road cuts for utilities or drives, County Engineer's Office
of 36C9
or State Duoartment cf Transportation
456-3000
• On-site wnse disposal system. Spokane County Health Dlsthot
324-1560
nstrucnn ori a flood plain, County Engineer's Office
456-3600
Sewer connection, County Utilities Department
456-3604
or City Public Works Department
6256300
Electrical wiring, Stale Department of Labor and Industries
324-2640
EXPIRATION
Unless otherwise noted, this permit will be considered null and void by limitation of the work authorized by the permit if not commenced or is stopped
for a period of 180 days, unless a written request for an extension of the permit is received and approved by the Building Official prior to expiration.
At a minimum an inspection should be requested at least once every 180 days to assure the validity of the permit. A permit may be renewed within
one year of the date of expiration for one-half the original tee, subject to certain limitations—please call us If you have any questions.
MISTAKES?
If you hank we've made an error in processing this permit or in conducting Inspections pertaining to IL or find erroneous information in the permit,
he, bring it too enaction Imn ledina'o by filing a written reouest for correction within 10 working days of discovery- All such requests should be
(lire, ran to f 1 crimen f R idmps at fit, ucLIP, found on the face of this pemnL
cerbly have exal I:en - 'aho,. state f cat he :prom a.ior suntanned m it and submitted by me or my agent to compile said
permitlapp -tion Is Iru uu ^prize Spoxerne County to proceed with processing- In addition, I have read and understand ad
INSPECTION REQUIREMENTS; HOT. OE µ,visors Included herem and agree to comply with same. All provisions of laws and ordinances
goveming Plus lose of work coal re -^nwith whether specified herein or not. I understand that the issuance of this permit/ application and any
subsequent inspection approvals o- Ceddieates of Occupancy shall not be construed to give authority to violate or cancel the provisions of any
s',me or 'rcol .raw requlat q .r Ln .n., f cinbriu,sni, web the provisions of any state or local laws regulating construction.
5 GNAT UHE OF APPLICATION
TB: NSR OR A. 1-N1 DATE