Loading...
2008, 10-01 Permit App: 08003887 Repair Fire Damage Project Number: 08003887 Inv: 1 Application Date: 10/1/2008 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: FIRE RESTORATION Contact: GLORIA BREGGER Address: 11209 E 12TH AVE C-S-Z: SPOKANE,WA 99206-2848 Setbacks:Front Left: Right: Rear: Phone: (509)924-1486 Group Name: Project Name: Site Information: Plat Key: 000000 Name: Range District: Sout Parcel Number: 45213.0920 Block: Lot: SiteAddress: 11209 E 12TH AVE Owner:Name: GLORIA BREGGER Address: 11209 E 12TH AVE Location::CSV SPOKANE,WA 99206-2848 Zoning: R-3 SF Res District Water District: 007 MODEL Hold: ❑ Area: 11,257 Sq Ft Width: 0 Depth: 0 Right Of Way(ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: ... ...�,., Review Building Plan Review Released By: Originally Released: 10/1/2008 By: tmelbourn Building Permit Contractor: OWNER Finn: OWNER Phone: (000)000-0000 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation 1&2 FAMILY R-3 VB FIRE • 0 $30,000.00 0 $30,000.00 RESTORATI ON Totals: 0 $30,000.00 0 $30,000.00 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $441.75 WSBC SURCHARGE 1 SELECT $4.50 SF PLNS RVW<7999 SQ FT 1 SELECT $176.70 Permit Total Fees: $622.95 Operator: JD Printed By: jmm Print Date: 10/1/2008 Project Number: 08003887 Inv: 1 Application Date: 10/1/2008 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $622.95 $622.95 $0.00 $622.95 $622.95 $622.95 $0.00 $622.95 Disclaimer: Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: jmm Print Date: 10/1/2008 Scirrof n (Staff Use Only) ( �i pO ile PERMIT NUMBER: ValleyK PERMIT FEE: CITY OF SPOKANE VALLEY Community Development Department Permit Center 11703 East Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 SEP 2 j 20011 Tel: (509) 688-0036 Fax: (509) 688-0037 permitcenter@spokanevalley.org RESIDENTIAL CONSTRUCTION PERMIT APPLICA ON El NEWD CONSTRUCTION O RUCTION ADDITIIONREMODE Q ACCESSORY BUILDING DECSITE ADDRESS: /I ZO / E . 12th Orkt fy Wit 9P26* ASSESSORS PARCEL NO.: ' j3:09z° LEGAL DESCRIPTION: BUILDING j OWNER NAME: NAME: Ci+lC c_. •rer-13 (-- ADDRESS: I I Z.O? (- , 121:1- Aum CITY: (-ey STATE: ZIP: 99266 PHONE: 9q3 --- 7C0.6- FAX: CELL: CONTACT NAME: PHONE: FAX: CELL: CONTRACTOR NAME: MAILING ADDRESS: irY-y-e— (t..S own -Y - CITY: L� STATE: ZIP: PHONE: FAX: CELL: CONTRACTOR LICENSE No.: EXPIRES: CITY BUSINESS LICENSE NO.: DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE: R...• . - 2. ruses L . 1 .(, _ _ _ �cc CS ► . ALL- 1"/ ;Y i ►• „ .._ Al e` " Al U b ck his ilia 446Yl , A/eu1 m} . QVC ti.)in?n /J S 1113 - f�wla`l/ re.s.wl.-evn4-� harms. Piro D tivlev . PROPOSEDvUSE: S i h3te, t a v.i IIQ r.c.t't r p CJIL p e� 11.6)rvte- Effective October 28, 2007 Page 1 of 2 http://www.spokanevalley.org//uploads/Community_Development/Documents/Forms/Building/Residential Construction Permit App.l.doc ****YOU MUST COMPLETE THE FOLLOWING**** MARK N/A IF NOT APPLICABLE Height to Peak: Dimensions: No. of Stories: Total Habitable 12- L1 i2 gcc; 24 X 50 I Space: I Zyg Main Floor SQ Filch Upper Floor SQ Unfinished Basement Finished Basement FT: I/ Z 1-18 FT: N/4 SQ FT: N/4 SQ FT: i//4 Garage SQ FT: (Deck)Covered Patio Impervious Surface 30% Slopes on, /y/, - SQ FT: 2,50 Area: N/9 Property: N/4 No. of Construction Heat Source: Sewer or Bedrooms: 2Type: E}� rTgmc F;ccezt Air Septic: S Jei TOTAL COST OF PROJECT: $ `600..1 DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling,the dwelling is/will be served by potable water. 2) • • -rship of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to re, esent he property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Developme cod/•eferenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is n. a,.r'(mit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required •f.e submitted and subse ntly approved before this application can be processed. r/ Signat�r // t ly - p�^, Date: � 0/ n '''''''tC( Method of payment: ❑ Cash ❑ Check ❑ Visa ❑ Mastercard Bankcard #: EXP: VIN#: Authorized Signature: Effective October 28, 2007 Page 2 of 2 http://www.spokanevalley.org//uploads/Community_Development/Documents/Forms/Building/Residential Construction Permit App.l.doc - For City Use Only CITY OF PLUS Project Number 0' ; Proj ect Address okane r`--2 if " alleY®V 00100 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. \1, E Your application review TARGET DATE is ` ` ` ' The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review > Submit complete, accurate plans and documents. Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. > Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. > Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure,you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process isa quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone,fax, email,or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist willprocess the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE—APPLICANT PINK—BUILDING FILE REV 9/07