Blake S 115 Specialty Auto Truck Painting
~1 u ~Sf
Jf7NN SPELLMAN G_OPY
Gaveftlbr W4
' STATf OF WAS!-i1NGtON
DEPARTMENT OF ECOLOGY
May 9, 1983
I
~
I, Speaialty Attto ~ TruC& Palntiag
S. 115 8].eke ltoad
Spokaaa, NA 99216
AtiteaCioas Meeere. Rea Orrino and Danay► Duna
Gentlemeas
Thie letter ie to confism our convereation of May S, 1983j, regarding
track waebing at your facility at 3. 115 81ake R,oed.
Ae you ere aov avaref waetinater geaereted it+am trnck vashiag must not
be d.trectly dischasged to tbe grovud. Installation of 8 Waetewater
treatment eyatem is required if you coatinue to raaeh tracke prior to
paintiag. The camplexfty of the eystem ie directlq re],ate8 Eo the chm-
icale ueed to semave decale and reeiduai oils and dirt. Ia the event
that you decide to conttoue the vaehiag aperatioaet a deeiga far ths
Waatmater ts~eatment sqetem mueL be submitted to thie offtce for reviea
and apgroval. Apprapfiate permitB and approva].e muet be obtaiaed ftom
Spo&aae Countq Building Codee se ve11.
, Th,e installation of the perforated barrels and eight yasds of g:evel, may
ba Ieft in p],ace to aid in iafiltratioa of storm vater ruaof f and eaow
mele, tf' tUie meete vith Spokaae Govnty l-e ePproval. However, thie -doae
tiot all+ow dieaharge of eny waetevater generated by yaur sctivities to
the grouad.
If you have eny questione segarding tble matter, please contact me. 'Sfteerely,
JapmeB B. Pradeate
Envis+onmentai Quelity Dieisioa
JBP s adw
~
~
cERTiFt$D MAn
~rrid~!►r ri~~.~i► n~l
ce: Spoueae Couaty Englareer'e Offiae '
spokene Couaty Bu.tldiag & sateep nepasrment LMAYI 01983
~
.='Na• 3
1