Loading...
2011, 09-20 Permit App: 11002945 Repair Fire Damage Project Number: 11002945 Inv: 1 Application Date: 9/20/2011 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information. Permit Use: FIRE DAMAGE REPAIR Contact: COVINGTON CONST&REST Address: 1324 LIBERTY LAKE DR,STE 224 C-S-Z: LIBERTY LAKE,WA 99019 Setbacks:Front Left: Right: Rear: Phone: (509)891-0056 Group Name: Site Information Project Name: aea. ia 1..'a`.. rv�e.i�n.r,s x4,4 iamalintw._:a„ Plat Key: 002751 Name: VERA District: East Parcel Number: 45233.0924 Block: Lot: SiteAddress: 13919 E 12TH AVE Owner:Name: GROBY,DANNY R Address: 13919 E 12TH AVE Location::CSV SPOKANE VALLEY,WA 99037 Zoning: R-3 SF Res District Water District: Hold: ❑ Area: 24,300 Sq Ft Width: 0 Depth: 0 Right Of Way(ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 1 Review Building Plan Review [Released By: Originally Released: 9/19/2011 By: tmelbourn Permits: pIlI 11 Nrrencz `:'. . .',et7i Y,�1,t'uds: 4 a,Nr,mwg, ,",,,r4M,,AeMptan nzLoar.. ,-"# --..,: Building Permit Contractor: COVINGTON CONSTRUCTION Firm: COVINGTON CONSTRUCTION Address: 1324 LIBERTY LAKE RD#224 Phone: (509)891-0056 LIBERTY LAKE,WA 99109 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation 1&2 FAMILY R-3 VB FIRE 0 $59,580.98 0 $59,580.98 REPAIR Totals: 0 $59,580.98 0 $59,580.98 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $713.75 WSBCC SURCHARGE 1 SELECT $4.50 SF PLNS RVW<7999 SQ FT 1 SELECT $285.50 Permit Total Fees: $1,003.75 Operator: JD Printed By: MBB Print Date: 9/20/2011 Project Number: 11002995 Inv: 1 Application Date: 9/20/2011 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Notes: ',i;s` �.��-F.�w`,R�7a�; u :,. ,W ...4,q,b mu 4�JO, Payment Summary: fi> £a ir.,..?'�.?'�.,_�.�,-s via— re�li,�—.411t:T�� — ''.vn -zg = Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $1,003.75 $1,003.75 $285.50 $718.25 $1,003.75 $1,003.75 $285.50 $718.25 Disclaimer: Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: MBB Print Date: 9/20/2011 • Community Development Department (Staff Use Only) Permit Center 11703 East Sprague Avenue, Suite B-3 PERMIT NUMBER: SC` okane Spokane Valley, WA Tel (509) 688 0 3699206 PERMIT FEE: Fax: (509) 688-0037 410 Valley permitcenter@sookanevalley.orq RESIDENTIAL CONSTRUCTION PERMIT APPLICATION 0'' NEW CONSTRUCTION X ADDITION/REMODEL 0- ACCESSORY BUILDING fl DECK jil OTHER SITE ADDRESS: 1 J631 q i 1 E - t Z T\k Ave__ Gov-Ig-NL y P1-11-101 ASSESSORS PARCEL NO.: LEGAL DESCRIPTION: -- RECEIVED BUILDING OWNER NAME: DftN L�,)Q..O 6 9 + (� -- tj NAME: 12)3)--N) ( 67 .9 SEP 1 9 21011 ADDRESS: Ji -VV\€ -- 1ej\E- I project it - `, I Nam, — — CITY: �` STATE: !Submittal ,f!_ PHONE: 5-09 O, 2- ' q V�V J, FAX: CELL: _ --.I CONTACT NAME: DAN T\j,k_�\ PHONE: -til (LI - V lU(3 L L4— FAX: SO9• g 1 '( CELL: ----- CONTRACTOR NAME: ODA)1 N(ot ib N (oN STt-e. CTtvi k5'(-0 -1 C MAILING ADDRESS: 1 J2 LI 8i,CIM L- - TSV G 2-4-} CITY: t.,1 p T 1 'u_ STATE: !C60 ZIP: t o t i PHONE: de " P 1 1—OO AX: so I Ll l 1-- 6051 CELL: jO . 71q. 0 t) ,3 CONTRACTOR LICENSE No.: EXPIRES: CITY BUSINESS LICENSE NO.: DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE: ****YOU MUST COMPLETE THE FOLLOWING**** MARK N A IF NOT APPLICABLE Height to Peak: Dimensions: No. of Stories: 0 Total Habitable N Space: Main Floor SQ FT: Upper Floor SQ FT: Unfinished Basement SQ Finished Basement SQ FT: FT: Garage SQ FT: Deck/Covered Patio SQ Impervious Surface 30%Slopes on FT: Area: Property: No. of Bedrooms: 3 Construction Type: Heat Source: O(_-Ft&? e L-Sewer or Septic: TOTAL COST OF PROJECT: $ GI ; CV) G` g 1L DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling,the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission topresent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Develop ent code. Ref enced codes -re available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit i mya permit r pproval or .ny violation of federal, state or local laws, codes or ordinances. 6) Plan or additional information may be r`q'uirel to be su moy. .U. equently ap5 •ved before this application can be processed. mitted Date: f / Signature A..i .A., , , l Updated 1-11-11 \. Page 1 of 1 http://www.spokanevalley.org/filestorage/124/938/210/948/1496/Bu ild ing_Permit_-_Residential_11-11-11.doc RESIDENTIAL CHECK LIST DIRECTIONS: Place a check mark in box next to each document required for complete submittal. o SITE PLAN o Property lines and dimensions o Setbacks to property lines o Direction arrow pointing North and orientation to streets ❑ Distance between buildings o Proposed/existing buildings (footprint and dimensions) ❑ Right of way/easement location &sizes o Utilities, septic tank/drain field locations and distances o Driveway approach size and location BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned) ❑ Elevations(Front/Rear/Sides)with roof peak and wall height including basement: ❑ Foundation Plan (crawlspace, basement or slab on grade): o Footing sizes and locations o Supporting wood cripple walls or beams o Perimeter concrete foundation wall sizes o Thickened concrete pads supporting o Crawlspace ventilation beams or girder trusses ❑ Floor Plan of each level (finished or unfinished)with dimensions: o Floor Joist direction, size and spacing o Window and door location and sizes o Header, beam or concrete lintel sizes ❑Window well locations if applicable o Brace wall panel locations ❑ Room usage labels o Water heater and furnace locations o Smoke detector locations o Exhaust fan locations ❑Attic and crawl space access locations o Deck or concrete patio sizes and locations o Fire Wall construction ❑ Roof Plan: o Engineered truss direction and spacing o Ridge, eave and valley lines o Rafter and over frame direction, size and spacing o Beam and girder size and location ❑ Wall Section Detail including: Roof o Slope/roofing material/underlayment/ice dam protection o Truss or rafter size, spacing &connection o Sheathing size and type ❑Attic insulation/air space baffle/ventilation Ceiling o Joist size and spacing o Size of ceiling gypsum wall board Wall o Height/top plate/stud size and spacing/sole plate o Siding/exterior house wrap/anchor bolts o Exterior sheathing size and type o Insulation, vapor barrier, gypsum wall board Floor o Joist size and spacing ❑ Sheathing or concrete floor size/insulation Foundation Wall o Concrete or Masonry unit width o Footing bottom to finished ground level depth o Earth to wood separation distance o Horizontal &vertical reinforcement if any Footing o Size o Reinforcement if any Radon o Passive system with 6mil vapor barrier o Active system with 6 mil vapor barrier Miscellaneous Construction Details ❑ Deck: o Floor plan/side view/dimensions o Footings/post/and beam size and locations o Floor Joist/decking direction, size and spacing O Stairway tread rise & run and nosing 0 Handrail/Guard height& spacing • New project ProjectAP-Nan, Previous pre-app meeting 6.1X) ne Transmittal flan revisions El City of Spokane Valley Transmittal Date: 401010°117alley Community Development Monday,September 19,2011 Department 11703 E.Sprague Ave,Suite B3 Spokane Valley,WA 99206 Phone:509.688.0036 Site Address: 13919 E 12TH AVE Project Number: 11002945 Parcel Number: 45233.0924 Zoning: R-3 Water District: Fire District: FD 01 Applicant: COVINGTON CONST & REST Owner: GROBY. DANNY R 1324 LIBERTY LAKE DR, STE 224 13919 E 12TH AVE LIBERTY LAKE, WA 99019 SPOKANE VALLEY, WA 99037 (509) 891-0056 e-mail: e-mail: Contact: COVINGTON CONST & REST Occupant: 1324 LIBERTY LAKE DR. STE 22 e-mail: LIBERTY LAKE. WA 99019 (509) 891-0056 r� I e-mail: E fl \ l: I I Contractor: COVINGTON CONSTRUCTION Arch/Engineer: 1324 LIBERTY LAKE RD#224 - LIBERTY LAKE, WA 99109 (509) 891-0056 U 1 D3 Q e-mail: Project FIRE DAMAGE REPAIR Description: Building Landuse Engineer Utilities Health Fire Dist Assessor APPLICATION PLANS v Please send all plan review and project comments via e-mail to the highlighted individuals. Mike Turbak From: Mike Turbak Sent: Tuesday, September 20, 2011 8:24 AM To: 'Lee Schwartzenburg' Subject: RE: Evergreen Boarding home Yes they can—I'll add this email to the file for use at the time of project submittal. Mike Turbak Senior Permit Specialist From: Lee Schwartzenburg jmailto:lee©wyattarchitects.com] Sent: Monday, September 19, 2011 2:53 PM To: Mike Turbak Subject: Evergreen Boarding home Mike, Re:#11-0779 In the last category of the submittal requirements list-the Mechanical and Plumbing permit applications are required. Can those please be deferred so those individual subcontractors can apply for those applications when they are hired? I shall note that on the title sheet per your approval.... Thanks, Lee J. Schwartzenburg Project Manager 7Yyatt.Arch'itects PO Box 141713 Spokane Valley,WA 99214 509/928-1860 1 { Target Date sheet For City Use Unl Sc1TY PLUS Project I I-- '7�1C.1 pokane Project Address Valle ® Y 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.720-5240 ♦ Fax: 509.688.0037♦ permitcenter®spokanevaUey.org As part of our on-going commitment to customer service during the review process of your project application,we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date,we will contact you with a revised target date. Your application review TARGET DATE is 1 The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review D Submit complete,accurate plans and documents. Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. D Designate a specific contact person to commtugicatgzyith the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. D Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us by your target date.Staff may contact you before the target date if the initial review is complete.By following this procedure,you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete,your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3.Technical Compliance.Once an application is administratively complete,it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals,each reviewer will approve their section of the application and route it to the Permit Center.When all sections of the application are received,a Permit Specialist will process the application and contact the person specified on your application for permit pick-up.Information regarding fees and pre-construction meetings(if required)will be provided by the Permit Specialist at that time. CD-003 V-7/06-21-11 Page 1 of 1