Loading...
2013, 02-21 Permit: SW-13000101 Sewer SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW-13000101 02/21/2013 Expiration Date: Project Description: SEWER CONNECTION Primary Contact: JEFF S LENZ CONSTRUCTION INC Applicant: JEFF S LENZ CONSTRUCTION INC Permit Type: SEWER Address: PO BOX 483 DEER PARK,WA 99006 Phone: 509-869-2079 Email: SITE INFORMATION: Site Address: 14307 E 12TH AVE Owner: SPOKANE TEACHERS CREDIT UNION Parcel Number: 45233.4101 Address: 106 W NORA AVE SPOKANE,WA 99205 Subdivision: SP-1233-00 Phone: Assessor's Description: VERA ADD TR"A"OF SP 00-1233 AUDITOR'S Email: FILE NO.4490514 BEING A PTN OF W1/2 BLK 160 Inspection Area: Water District:Vera Fire District: Spokane Valley Fire Irrigation District#15 Zoning: Land Area: 12500 Square Feet CONTRACTOR INFORMATION: General Contractor JEFFSSL962D6 JEFF S LENZ CONSTRUCTION INC PO BOX 483 DEER PARK,WA 99006 509-869-2079 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 $125.00 FEE DETAIL: Processing-Utilities $26.32 Utilities Permit $125.00 Total Fee: $151.32 CONDITIONS: Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR&INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Date Printed:02/21/2013 12:37:05 Printed by:IIS APPPOOL\SmartGovProdApp SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW-13000101 02/21/2013 Expiration Date: FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed:02/21/2013 12:37:05 Printed by:IIS APPPOOL\SmartGovProdApp