2013, 02-21 Permit: SW-13000101 Sewer SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW-13000101 02/21/2013
Expiration Date:
Project Description: SEWER CONNECTION Primary Contact: JEFF S LENZ CONSTRUCTION INC
Applicant: JEFF S LENZ CONSTRUCTION INC
Permit Type: SEWER Address: PO BOX 483
DEER PARK,WA 99006
Phone: 509-869-2079
Email:
SITE INFORMATION:
Site Address: 14307 E 12TH AVE Owner: SPOKANE TEACHERS CREDIT UNION
Parcel Number: 45233.4101 Address: 106 W NORA AVE
SPOKANE,WA 99205
Subdivision: SP-1233-00 Phone:
Assessor's Description: VERA ADD TR"A"OF SP 00-1233 AUDITOR'S Email:
FILE NO.4490514 BEING A PTN OF W1/2 BLK 160
Inspection Area:
Water District:Vera Fire District: Spokane Valley Fire
Irrigation District#15
Zoning: Land Area: 12500 Square Feet
CONTRACTOR INFORMATION:
General Contractor
JEFFSSL962D6
JEFF S LENZ CONSTRUCTION INC
PO BOX 483
DEER PARK,WA 99006
509-869-2079
DETAILS:
Class Type Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
$125.00
FEE DETAIL:
Processing-Utilities $26.32
Utilities Permit $125.00
Total Fee: $151.32
CONDITIONS:
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
Inside Public Transit Benefit Area
CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR&INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
Date Printed:02/21/2013 12:37:05 Printed by:IIS APPPOOL\SmartGovProdApp
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW-13000101 02/21/2013
Expiration Date:
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed:02/21/2013 12:37:05 Printed by:IIS APPPOOL\SmartGovProdApp