1973, 03-26 Permit App: K955 Residence Job #34
County of Spokane, Washington
BUILDING CODES DEPARTMENT. COURTHOUSE, SPOKANE, WASHINGTON 99201
APPLICATION FOR LAND USE OR STRUCTURE PERMIT 3 -f
GENERAL REQUIREMENTS PERMIT FEE
PERMIT REQUIRED. A land use or structure permit is required by County Resolution to erect a building or structure of any
kind or alter any building or structure already erected, or to change a land use. Construction must conform with the
Spokane County Building Code and Zoning Ordinance. Construction is subject to inspection.
°CATER. Water supply must be approved by the County and State Health Departments. Where cork on water connections disturbs
'he surface, shoulders or ditches of County Roads, permissieu must be obtained from the County Engineer's Office.
.WACIE SYSTEM. Permits are required in all cases by County Resoiut onm Nos. 45-1a3 and 47.235.
= ;T-.BACK FROM PROPERTY LINES. In most zones and under most circumstances, a set-back from the front property line, of at
lust 25' is required, a 5' side yard, 15' side yard from a flanking street, and a 25' rear yard are required.
:ATE HIGHWAYS. Where the structure abuts a State Highway, clearance must be obtained pertaining to set-back and ingress
and egress.
COUNTY ROADS. Work on street right-of-way may not be performed until staked by County Road Department and work must be
performed in accordance with stakes. Points of ingress and egress must be approved by the County Engineer.
MOVING OF BUILDINGS. A permit is required to move an existing building. When a building is moved on a County or State
highway, clearance must be obtained from the County Engineer and/or State Highway Department.
ACCESSORY BUILDINGS. Accessory buildings (garages, sheds, etc.) require a separate permit.
RESTRICTIVE COVENANTS. Builders should check provisions of covenants or dedications and easements running wit the land
which are enforceable through civil action. County Officials can not bring action to enforce covenants or 'cations.
APPLICANT FILL IN BELOW THIS LINE
Name of Owner_ Kappen Construction _Address 5- 2_ BLa[ce_ -- Phone 924-0771
Architect--- Phone Engineer --_._----_ -__ ___ Phone
i' Contractor Kappen Construction Address -S-r--25 Blake------------------- __ Phone 924-0771 1
f Legal Description of Property (Give complete description from deed, tax receipt, etc.)
Lot 8, Block 1_ Craig Subdivision ------
DESCRIPTION OF WORK:New X Addition Remodel Moving _. Bldg.Zone _Fire Zone
Size of Lot 132' X 81 .45' _ _ __-Sewage System _Septic_ Stories
Const. Frame Dimensions 22 x 22 +_ 22X26_*.-- _4X22 Total Sq. Ft.--1$48 ._.__- Valuation $26,300
(Frame,concrete,brick,etc.)
Rooms 6 Baths 1 Basement Full Foundation Const. _.—Concrete -__ Chimney none___Fireplace none
(Full, part, none) (Kind) (Number)
iHeat. System El ectric Type of Roofing Comp Ext. Finish -_wood Int, Wall Finish gyp bd
JUse of Bldg. residence __— ---___________-__No. of Units 1 -Bedrooms 3
Garage or Carport Attached 22 x 22 attached garage U,iv,icc, D,,t..,tchcd, ---
PLOT PLAN
Draw sketch with dimensions showing: (1) property lines; (2) street or road locations; (3) location of existing and
proposed buildings; (4) distance to property lines and streets; (5) dimensions of buildings; (6) location of sewage sys-
tem and water supply lines. —
NORTH —state License No.
Ind. Ins. Acct. No.
( -1/) REQUIRED
Plumbing Permit
ell Heating Permit
m TO
0 Sewage Permit_
Plans Received-- _
Plans Checked
Plans Returned
Plans Picked Up _
Plans Mailed
SOUTH P
I hereby certify information submitted is correct and there are no other structures located on this property except
as shown.
March 26, 1973
Owner or Agent Date
A LAND USE OR STRUCTURE PERMIT MUST BE ON THE PREMISES BEFORE CONSTRUCTION COMMENCES.
THIS IS NOTA PERMIT. ,
DO NOT WRITE BELOW THIS LINE r
Your street address will be 1 ., t C �: 1,57Q6— �'2 Zit-, e zone is �-ice..
Sewage Permit Number Issued __ Building Permit/ C� Receipt �C, _ Issue/
Remarks ` J
Fera 523 C',d,Th Code
KAPPEN CONSTRUCTION, INC. ='/
I 5, 25 Blake
Spokane, Washington 99216 Requested Price --si,a 3, 96-6
Wa 4-0771 Lot Cost 02,5-06
i PLOT PLAN
T ELE1VATIONS:
10 i Crown of Street f-7.3.x'5
Finish Floor #- /06,60
81 ,45' -
7 '' ,
I I I
1.57 ( LO LO
__v,,'6 d �Y t/
I I pHA APpRO rrA O
12' 7,1. 1'2' i , nILY
r,11�%iT
900 glllon 1 N
cI M
co
le .
0 p
IsT.
[ r,�qR
BASIC 1056 - U 1973
—1-0.4-5,1 (5' ENV. HEALTH
riu.fr . - 106,00. -
vp 21 ' 22'
41022 + ��� porc 9 ,
1 �
c
,�1
7. 2'5'
a,
\ MO NV V '
q,ifi,
/ 3
V F-73,1 y•
81 ,45'
12th AVENUE Scale:
Basic: ; Sg. Ft. 1056 `
7 # Legal Lot 8, Block 1 , Craig Subdivision
Job
FHA Case # ; ` ,
_ r 34 ' Address:
;'
4 '
r
Mortgage Co. SPECIAL INSTRUCTIONS:
,mow=--
Power Co, ' 1 Water Co.
P/ trlaer; - :. Excavator