Loading...
1995, 10-13 Permit: 95008456 Carport, Deck SPOKANE COUNTY DEPARTMENT OF BUILDINGS WEST 1026 BROADWAY • SPOKANE,WA 99260-0050 (509)456-3675 J SITE INFORMATION PROJECT INFORMATION SITE ADDRESS: 9924 E 13TH AVE PROJECT NUMBER: 95008456 ISSUE DATE: 10/13/95 SPOKANE WA 99206 PERMIT USE: CARPORT ADDITION (12 X 23) & DECK ADDITION (10 X 24 PARCEL NUMBER: 45204.2741 APPLICANT: REEVE, KATHRYN/ARCHE SUBDIVISION: UNIVERSITY PLACE PHONE: 509 921 9172 LOT: BLOCK: 26 ZONE: UR-3.5 ADDRESS: 9924 E 13TH AVE SPOKANE WA 99206 INSPECTOR: REED OCKEY CONTACT: PERRY ARCHER PHONE: 509 921 9172 WATER DIST: SETBACKS -> FRONT: NA LEFT: 25 RIGHT: 3 REAR: 11 OWNER: REEVE, KATHRYN/ARCHER, PERRY LENDER NAME: PHONE: 509 921 9172 PHONE: ADDRESS: 9924 E 13TH AVE ADDRESS: SPOKANE WA 99206 PERMIT($) BUILDING CONTRACTOR OWNER LICENSE #: BUILDING ADDITION DIM.= X 1 STORIES SQ FT = 276 CARPORT U-1 VN 276 DECK R-3 VN 240 TOTAL VALUE: $2,922.00 RESIDENTIAL VALUATION 54.00 INVESTIGATION FEE 54.00 STATE SURCHARGE 4.50 RESIDENTIAL SURCHARGE 10.80 TOTAL PERMIT FEE $123.30 PAYMENT SUMMARY NOTES PAYMENT DATE RECEIPT# PAYMENT AMOUNT 10/13/95 00009907 $123.30 TOTAL FEES AMOUNT PAID AMOUNT OWING $123.30 $123.30 $.00 1 ISSUED PERMIT BY: JULIE SHATTO ,. . NOTICE It is the responsibility of the permittee, not Spokane County,to see to it that the use described on the front of this permit complies with applicable codes and requirements and that required inspections are requested. Failure to request required inspections and obtain the necessary approvals prior to progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the owner's/permittee's expense. At a minimum, the following inspections ARE REQUIRED by County Code: 1. FOOTING - when forms and reinforcement are in place and prior to placement of concrete. NOTE: This inspection includes review of the structure's setbacks from property lines. Minimum setbacks are established by County zoning regulations.Typically, side and rear yard setbacks are measured from property lines,while setbacks for yards abutting streets are measured from the property line or the center line of the roadway right-of-way, whichever provides the greater setback from the center line of the roadway right-of-way. Curb lines and fence lines are not necessarily indicative of property lines. In some residential areas, the County can own as much as 20 feet of right-of-way between your property and the actual improved street/curb. The responsibility to comply with applicable setback provisions lies solely with the permittee—neither Spokane County nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner's/permittee's expense. 2. FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete. (Blocking for a manufactured home is required to be inspected prior to the installation of skirting.) 3. FRAMING - after all framing, bracing and blocking is in place, and prior to concealing. 4. INSULATION - prior to the installation of drywall. 5. PLUMBING - after rough-in, before covering, and final. 6. MECHANICAL - rough-in of piping, before covering, metal chimneys before concealment, and final. 7. FINAL - when complete and prior to occupancy and/or use. Please provide 24 hours notice. NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants,fire department access, on-site drainage("208 swales"), road improvements, parking,and landscaping are common requirements of a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy. In addition to the above any plumbing or mechanical systems or materials which would be concealed by framing, drywall, concrete, etc., must be inspected prior to cover. Check with the department for "special inspections" in conjunction with commercial projects. CALL 456-3675 FOR INSPECTIONS. TO INSURE PROMPT SERVICE, PLEASE GIVE 24 HOUR NOTICE. YOUR INSPECTOR IS UNDER CERTAIN CIRCUMSTANCES, PARTS OF YOUR PROJECT MAY REQUIRE INSPECTIONS FROM OTHER AGENCIES: • Road cuts for utilities or drives, County Engineer's Office • Sewer connection, County Utilities Department 456-3600 456-3604 or State Department of Transportation or City Public Works Department 456-3000 625-6300 • On-site waste disposal system, Spokane County Health District • Electrical wiring, State Department of Labor and Industries 324-1560 324-2640 • Construction in a flood plain, County Engineer's Office 456-3600 EXPIRATION Unless otherwise noted, this permit will be considered null and void by limitation of the work authorized by the permit if not commenced or is stopped for a period of 180 days, unless a written request for an extension of the permit is received and approved by the Building Official prior to expiration. At a minimum an inspection should be requested at least once every 180 days to assure the validity of the permit. A permit may be renewed within one year of the date of expiration for one-half the original fee, subject to certain limitations—please call us if you have any questions. MISTAKES? If you think we've made an error in processing this permit or in conducting inspections pertaining to it, or find erroneous information in the permit, please bring it to our attention immediately by filing a written request for correction within 10 working days of discovery. All such requests should be directed to the Department of Buildings at the address found on the face of this permit. I certify that I have examined this permit/application, state that the information contained in it and submitted by me or my agent to compile said permit/application is true and correct, and authorize Spokane County to proceed with processing. In addition, I have read and understand the INSPECTION REQUIREME - •TICE provisions included herein and agree to comply with same. All provisions of laws and ordinances governing this type of wor ill be com,'lied with hether specified herein or not. I understand that the issuance of this permit/application and any subsequent inspection a..rovals or Cer ificates • Occupanc shall not be construed to give authority to violate or cancel the provisions of any state or local law regulat g constructi. , or as arranty of conformance with the provisions of any state or local laws regulating construction. SIGNATURE OF r APPLICATION / yt OWNER OR AGENT • DATE / SPOKANE COUNTY DEPARTMENT OF BUILDINGS ' WEST 1026 BROADWAY • SPOKANE,WA 99260-0050 (509)456-3675 ( SITE INFORMATION PROJECT INFORMATION ) SITE ADDRESS: 9924 E 13TH AVE - PROJECT NUMBER: 95008456 ISSUE DATE: 10/13/95 SPOKANE WA 99206 PERMIT USE: CARPORT ADDITION (12 X 23) & DECK ADDITION (10 X 24 PARCEL NUMBER: 45204.2741 APPLICANT: REEVE, KATHRYN/ARCHE SUBDIVISION: UNIVERSITY PLACE PHONE: 509 921 9172 LOT: BLOCK: 26 ZONE: UR-3.5 ADDRESS: 9924 E 13TH AVE 1 SPOKANE WA 99206 INSPECTOR: REED OCKEY i CONTACT: PERRY ARCHER PHONE: 509 921 9172 WATER DIST: F SETBACKS -> FRONT: NA LEFT: 25 RIGHT: 3 REAR: 11 OWNER: REEVE, KATHRYN/ARCHER, PERRY LENDER NAME: PHONE: 509 921 9172 & PHONE: ADDRESS: 9924 E 13TH AVE ADDRESS: SPOKANE WA 99206 1 i A CPERMIT(S) BUILDING PERMIT CONTRACTOR ç)r. ) OWNER e LICENSE #: 0—L A..0 Wra JL �\.' ��4 4-}-LO�+ BUILDING ADDITION C\ DIM.= X 1 STORIES _ p SO FT = 276 Fc.- L' PCO J l�c - L l� o w,u -3-Y2_ Co m 1 L ti CARPORT U-1 VN 276 i \I-1r\ e \ ,r kty I L Q - L L 4 C c.)4A. w DECK R-3 VN 240 \ t TOTAL VALUE: $2,922.00S Q FR,`d a ` , \13 \c C r-tD t2 RESIDENTIAL VALUATION 54.00 co") F% 2 vv‘AA 1'" I.0 w S O 1. h'�s Q ITATETIURCIAN FEE 54.00 �1.. e — co `� O , '�� F� d �In(r 100�'$}')c— STATE SURCHARGE 4.50 RESIDENTIAL SURCHARGE 10.80 TOTAL PERMIT FEE $123.30 4a--1 I o W FLZ-I A/ O (4)jafitiVit i 0 PI / /PI-( PAYMENT SUMMARY NN NOTES PAYMENT DATE RECEIPT# PAYMENT AMOUNT 1C?\---- 10/13/95 00009907 $123.30 V� U• TOTAL FEES AMOUNT PAID AMOUNT OWING i $123.30 $123.30 $.00 DUPLICATE BY: JULIE SHATTO , f / 6)? NOTICE It is the responsibility of the permittee, not Spokane County,to see to it that the use described on the front of this permit complies with applicable codes and requirements and that required inspections are requested. Failure to request required inspections and obtain the necessary approvals prior to progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the owner's/permittee's expense. At a minimum, the following inspections ARE REQUIRED by County Code: 1. FOOTING - when forms and reinforcement are in place and prior to placement of concrete. NOTE: This inspection includes review of the structure's setbacks from property lines. Minimum setbacks are established by County zoning regulations.Typically, side and rear yard setbacks are measured from property lines,while setbacks for yards abutting streets are measured from the property line or the center line of the roadway right-of-way, whichever provides the greater setback from the center line of the roadway right-of-way. Curb lines and fence lines are not necessarily indicative of property lines. In some residential areas, the County can own as much as 20 feet of right-of-way between your property and the actual improved street/curb. The responsibility to comply with applicable setback provisions lies solely with the permittee—neither Spokane County nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner's/permittee's expense. 2. FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete. (Blocking for a manufactured home is required to be inspected prior to the installation of skirting.) 3. FRAMING - after all framing, bracing and blocking is in place, and prior to concealing. 4. INSULATION - prior to the installation of drywall. 5. PLUMBING - after rough-in, before covering, and final. 6. MECHANICAL - rough-in of piping, before covering, metal chimneys before concealment, and final. 7. FINAL - when complete and prior to occupancy and/or use. Please provide 24 hours notice. NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants,fire department access, on-site drainage("208 swales"), road improvements, parking, and landscaping are common requirements of a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy. In addition to the above any plumbing or mechanical systems or materials which would be concealed by framing, drywall, concrete, etc., must be inspected prior to cover. Check with the department for "special inspections" in conjunction with commercial projects. CALL 456-3675 FOR INSPECTIONS. TO INSURE PROMPT SERVICE, PLEASE GIVE 24 HOUR NOTICE. YOUR INSPECTOR IS UNDER CERTAIN CIRCUMSTANCES, PARTS OF YOUR PROJECT MAY REQUIRE INSPECTIONS FROM OTHER AGENCIES: • Road cuts for utilities or drives, County Engineer's Office • Sewer connection, County Utilities Department 456-3600 456-3604 or State Department of Transportation or City Public Works Department 456-3000 625-6300 • On-site waste disposal system, Spokane County Health District • Electrical wiring, State Department of Labor and Industries 324-1560 324-2640 • Construction in a flood plain, County Engineer's Office 456-3600 EXPIRATION Unless otherwise noted, this permit will be considered null and void by limitation of the work authorized by the permit if not commenced or is stopped for a period of 180 days, unless a written request for an extension of the permit is received and approved by the Building Official prior to expiration. At a minimum an inspection should be requested at least once every 180 days to assure the validity of the permit. A permit may be renewed within one year of the date of expiration for one-half the original fee, subject to certain limitations—please call us if you have any questions. MISTAKES? If you think we've made an error in processing this permit or in conducting inspections pertaining to it, or find erroneous information in the permit, please bring it to our attention immediately by filing a written request for correction within 10 working days of discovery. All such requests should be directed to the Department of Buildings at the address found on the face of this permit. I certify that I have examined this permit/application, state that the information contained in it and submitted by me or my agent to compile_said permit/application is true and correct, and authorize Spokane County to proceed with processing. In addition, I have read and understand the INSPECTION REQUIREMENTS/NOTICE provisions included herein and agree to comply with same. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. I understand that the issuance of this permit/application and any subsequent inspection approvals or Certificates of Occupancy shall not be construed to give authority to violate or cancel the provisions of anv state or local law regulating construction, or as a warranty of conformance with the provisions of any state or local laws regulating constructiorft SIGNATURE OF APPLICATION �►/ OWNER OR AGENT DATE LGFS PAYMENT DOCUMENT _ p„# _- - SPOKANE COUNTY AUDITOR Change Orta# Dept .J R C Bid ID VENDOR; SHIP TO: BILL TO: Blanket# 1 4::_ .n , r-L-k t,m:i :1',r.`6 E R, P R:1 RC# 924.i a. 3TH AVENUE sPOKJ /WA 99c:C r,, VI# Vendor Contact/Tel Confirming Order FOB: PO DATE: BLDG/ROOM: BUYER ACCTG.PERIOD: DELIVERY DATE: WAREHOUSE: COMMENTS• ENTERED FIS'• PURCHASING fIRRCTOR• COMM LN# DESCRIPTION COMMODITY NO REF ACCT LINE QUANTITY UNIT UNIT PRICE TOTAL PRICE # bU }0`84' 6 I=\ 'r39'24" `.- 13Tt -•. L PAGE TOTAL: 54.03 DISCOUNT TOTAL: 0.00 FREIGHT TOTAL: 0.00 SALES TAX TOTAL: 0.00 'URCHASE ORDER VALUE: 5 +.00 USE TAX TOTAL: 0.00 • LINE NO. FUND I AGCY I ORG SB ORG I ACT OBI SB OBI REV SRC SB REV RPT CAT BS ACCT JOB NO. I PAY THIS AMOUNT P/F RECEIVING CERTIFICATION PAYMENT CERTIFICATION TRAVEL CERTIFICATION Materials noted in quantity I have been I,the undersigned do hereby certify under penalty of perjury that sufficient funds have been budgeted for this claim,the I hereby certify under penalty of perjury that this received in good condition or contracted for. materials have been furnished,services rendered or labor performed as described herein or contracted for,that the claim is is a true and correct claim for necessary expenses a just,due and unpaid obligation against Spokane County or fund agency indicated above,that I am authorized to authenticate incurred by me and that no payment has been received SIGNED and certify to said claim. by me on account thereof. _ OFFICE !ADMINISTRATOR TITLE SIGNED TITLE SIGNED TITLE 10/26/95 li;i . / J'.) DATE DATE DATE PAGE DEPARTMENT 2