Architecture • Landscape Architecture CHANGE ORDER-005
z F �, Issue Date: 12/22/2016
Watt more than great ardhJteeture:
PROJECT OWNER CONTRACTOR DISTRIBUTION X
Spokane Valley City Hall City of Spokane Valley Meridian Construction Steve Worley X '
10210 E.Sprague 11707 E.Sprague Ave. 12310 E Mirabeau Parkway Mark D'Agostino X
Spokane Valley,WA 99206 Suite 106 Suite 100 Steve Roth X
Spokane Valley,WA 99206 Spokane Valley,WA 99216 Jim Paras X
CONTRACT FOR: GENERAL CONSTRUCTION
CONTRACT DATE: 5-20-2016
You are hereby directed to make the following changes in the contract:
REFERENCE DESCRIPTION AMOUNT
COP-031 Additional Insulation Board inside Ventilation Wells $399.14
COP-034 Attic Cat-Walk $11,782.66
PR-005 I
ASI-019
COP-038 Roofing Substitution Request ($1,378.53)
CCD-007 i
TOTAL $10,803.27
The Original Contract Sum was: $9,742,700.00
Net Change by Previously authorized Change Orders: $36,934.99
The Contract Sum prior to this Change Order was: $9,779,634.99
The Contract Sum will be increased by this Change Order in the amount of: $10,803.27
The new Contract Sum including this Change Order will be: $9,790,438.26
The Contract time will be unchanged/Changed by: 0 days
The Date of Substantial Completion as of the date of this Change Order therefore is: 7/25/2017
ARCHITECT CONTRACTOR OWNER REPRESENTATIVE
Architects West,Inc. Meridian Construction City of Spokane Valley
210 E.Lakeside Ave. 12310 E.Mirabeau Parkway,Ste 100 11707 E.Sprague Ave.,Suite 106
Coeur d'Alene,ID 83814 Spokane Valley,WA 99216 Spokane Valley,WA 99206
SIGNATURE: SIGNAT RE: SIGNATURE:
I ‘f;e/r14#7
DATE: 12/22/2016 DATE: rr DATE:
l2.(Z l� /Z/Z7/i6, —
I
1509—SPOKANE VALLEY CITY HALL CHANGE ORDER-005 —12/22/2016
Page l of l �