Loading...
2011, 08-02 Permit App: 11002176 Remodel, Reroof Project Number: 11002176 Inv: 1 Application Date: 8/2/2011 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: NEW ATT GAR/KITCHEN REMODEL/ROOFING Contact: SATHER,ERIC D&JUDY L REMODEL&RE-ROOF Address: 14210 E 13TH AVE C- S-Z: VERADALE,WA 99037 Setbacks: Front Left: Right: Rear: Phone: (509)230-9808 Group Name: Site Information: Project Name: Plat Key: Name: Range District: East Parcel Number: 45233.3003 Block: Lot: SiteAddress: 14210 E 13TH AVE Owner:Name: SATHER, ERIC D&JUDY L Address: 14210 E 13TH AVE Location::CSV VERADALE,WA 99037 Zoning: R-3 SF Res District Water District: 010 VERA Hold: ❑ Area: 11,440 Sq Ft Width: 0 Depth: 0 Right Of Way(ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: Review Building Plan Review Released By: Originally Released: 8/1/2011 By: tmelbourn Landuse/Zoning/HE Conditions Released By: Originally Released: 7/21/2011 By: kkendall Permits: Operator: JD Printed By: JD Print Date: 8/2/2011 Project Number: 11002176 Inv: 1 Application Date: 8/2/2011 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Building Permit —— Contractor: OWNER Firm: OWNER Phone: (000)000-0000 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation 1&2 FAMILY R-3 VB KITCHEN 0 $20,000.00 0 $20,000.00 &ROOF GAR WOOD U-1 VB 1,248 $23,712.00 1,248 $23,712.00 Totals: 1,248 $43,712.00 1,248 $43,712.00 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $583.15 WSBCC SURCHARGE 1 SELECT $4.50 SF PLNS RVW<7999 SQ FT 1 SELECT $233.26 Permit Total Fees: $820.91 Plumbing Permit Contractor: OWNER Firm: OWNER Phone: (000)000-0000 Notes: Payment Summary: Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $820.91 $820.91 $233.26 $587.65 $820.91 $820.91 $233.26 $587.65 Disclaimer: Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: JD Print Date: 8/2/2011 Community Development Department (Staff Use Only) , Permit Center _ 11703 East Sprague Avenue, Suite 8-3 PERMIT NUMBER: /1 2/ 7C. SclTYoFIapone _ Spokane Valley, WA 99206 G Tel: (509) 688-0036 PERMIT FEE: \itlley Fax: (509) 688-0037 oermitcenter@spokanevalley.orq RESIDENTIAL CONSTRUCTION PERMIT APPLICATION ID NEW CONSTRUCTION ADDITION/REMODEL ElACCESSORY BUILDING DECKOTHER G SITE ADDRESS: e"I° E 1 ;1 P4 t V 5/€2 ire 1.6l// 4/4---ie y , 9 7 3 7 ASSESSORS PARCEL NO.: i/$2.. 3 3 r 3 c'v 3LEGAL DESCRIPTION: Go, 3 ; IJ ' ' a- //a h BUILDING OWNER NAME: er,c 4- Tay 544414...-- -es acil'fi NAME: C+Ii'!L VL -5-0-4. y -56.-44-C.,,,- ADDRESS: ADDRESS:IT / g- to E (3'47 �Li/� y CHT: 5 J`�tU0[/C&n La"1 j`QY STATE: 4)4, ZIp: ` 9e)3 Q PHONE: ! ?6.3 -432'2 -7 (7.141Y) FAX: CELL:�.S3 ) •# J ° 6 Oa ' (J CONTACT NAME: !-!C Sa ' ' e''-- PHONE: FAX: CELL: (s6! )- 2' 70 '" F C1 v CONTRACTOR NAME: /4oyh.e_ G4Ji4°,- MAILING ADDRESS: S‘khe 4-5" ' CITY: STATE: �ZIP:., PHONE: FAX: CELL: Sloa-e S 4 'r'/C__. CONTRACTOR LICENSE No.: EXPIRES: CITY BUSINESS LICENSE NO.: DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE: ` 2c 1,02 w 9 af-elq e_ 1 ex/°4 mce- ek,$4"11 14 - / C hew 9 -e_ ;CP 01 e eY, 51-119 I'c24rr, ) -f tI -g iccr©© ****YOU MUST COMPLETE THE FOLLOWING**** MARK N/A IF NOT APPLICABLE Height to Peak: — Dimensions: No. of Stories: t Total Habitable `L,r Space: _Main Floor SQ DK Upper Floor SQ FT: Unfinished Basement SQ Finished Basement SQ VeltAkvklAtk O7�'a t S ' iv/A_ FT: /V/t4- FT: A/l Garage SQ FT: Deck/Covered Patio SQ Impervious Surface 30%Slopes on I ? j`g 6 K FT: Area: Property: n//A No. of Bedrooms: Construction Type: (,0070GQ Heat Source: eC.G.4-r'r(- Sewer or Septic: Sew TOTAL COST OF PROJECT: $ ff GiC)i c' 4.-9--- 4/ Pi4C"� rc—e- why e '1631-`11 DISCLAIMER 't- ,b?-O'000 , C`A.e-£'7£'7e. of GQcPr 6,,, The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling,the dwelling is/will be served by potable water. 2)Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approv. f. any violation of federaJ,__state.or...local-law-sr-codes-or ordinances. 6) Plans or additional information may be required to be submitted -7 ubsequ ntly approved before plisapplicgtign can be priocessed. a: :A � iSignature yDate: 7- lq - i/ Updated 1-11-11 `- Pa _-_ ____ _ __ i ge 1 of 1 http://www.spokaneva Iley.org/fi lestorage/124948/210/948/1496/building_=P.ermit_-_Residential_11-11-11.doc 1 Permit Center S kane 11703 E Sprague Ave,Suite B-3 PERMIT NUMBER: • Wane Spokane Valley,WA 99206 (509)688-0036 FAX:(509)688-0037 PERMIT FEE: permitcenter@a,spokanevalley.org Community Development Plumbing Permit Application n Commercial p+Residential SITE ADDRESS: I y�10 E /7'I/J? Ct / 5/ f'y� e' � L% �le., C14 lam! c3 Building Owner /bike >14`v"-- Name: Phone: Fax: �.�� ��y t,�� Cell s�30 98a 8 Address: 1412./0 1'3 G ✓ City: 5,0/40,4 vcL[ltte State: KJec_ Zip:9 i 7 Contractor rt„ €pw -6"— Name: �4-i4147 4-S a '/� Phone: Fax: Address: City: State: Zip: License No: City Business Lic: Contact/Project Manager: Name: /ter t� �Q�j' Phone: ."'a Cl 30 ?$G3S? 4- / `�� f! #OF UNITS PLUMBING FIXTURE ON A TRAP TOILETS URINALS TUBS SHOWERS(per trap) Lav/Basins,Bar,Floor,Kitchen,Laundry,Utility,Janitor,Photo,X-ray,Food, SINKS Prep/Culinary Meat DISHWASHER CLOTHES WASHER GARBAGE DISPOSAL t WATER SOFTNER FLOOR DRAIN Area,Case,Coil,Trench,Condensate ROOF DRAIN/OVERFLOW DRAINS FOUNTAIN,DRINKING WATER PIPING/DRAIN-IN WASTE Installation,Alterations,Repair,Reversals WATER USING DEVICE Ice and/or Coffee maker,hose bib,steamer proofer,carbonator,swamp cooler PRIVATE SEWAGE DISPOSAL SYSTEM WATER HEATER If Gas,See Mechanical INDUSTRIAL WASTE PRETREATEMENT INCEPTORS Including traps,vents except kitchen type grease interceptors functioning as fixture traps REPAIR OR ALTERATION Water piping,drainage or vent piping ATMOSPHERIC TYPE VACUUM BREAKER BACK FLOW PROTECTIVE DEVICE Other than atmospheric type vacuum breakers MEDICAL GAS INCEPTORS ❑CASH ❑CHECK ❑VISA 0 MC EXPIRES: Card# VIN: SIGNATURE: CURRENT FEES AVAILABLE AT:http://www.spokanevalley.orq/under the quick links for Forms,Master Fee Schedule. http://www.spokanevalley.org/uploads/Community Development/Documents/Forms/Building/PlumbingPermitApplication040309.doc fluor� Pro• ��� Nccvproject Previous pre-app meeting ID p o s ane Transmitral Plan revisions ID Cin of Spokane ValleyTransmittal Date: .0000Vall ley Communis♦ Development Thursday,July 21,2011 Department 11703 E.Sprague Ave,Suite B3 Spokane Valley,WA 99206 Phone: 509.688.0036 Site Address: 14210 E 13TH AVE Project Number: 11002176 Parcel Number: 45233.3003 Zoning: R-3 Water District: VERA Fire District: FD 01 Applicant: SATHER, ERIC D & JUDY L Owner: SATHER, ERIC D & JUDY L 14210 E 13TH AVE 14210 E 13TH AVE VERADALE, WA 99037 VERADALE, WA 99037 (509) 230-9808 e-mail: e-mail: Contact: SATHER, ERIC D & JUDY L Occupant: 14210E 13TH AVE e-mail: VERADALE, WA 99037 D n �� (509) 230-9808 V I' IS D e-mail: Contractor: OWNER Arch/Engineer: D -� UOLDON () - 0 e-mail: Project NEW ATT GAR/ KITCHEN REMODEL/ ROOFING REMODEL & RE-ROOF Description: Building Landuse Engineer Utilities Health Fire Dist Assessor APPLICATION 1, 1 SITE PLAN 1 2 PLANS / ( C Please send all plan review and project comments via e-mail to the highlighted individuals. Simple Heating System Size: Climate Zone 2 Project Information Contact Information sather eric 509 230 9808 14210 e 13th ave Indoor Design Temperature 70 Outdoor Design Temperature 4 Design Temperature Difference (AT) AT=Indoor-Outdoor Design Temp 66 Conditioned Floor Area 150 Conditioned Volume 1508 Glazing Copy Sum of UA from Glazing Schedule 5 Attic U-Factor X Area = UA R-49 0.027 R-38 Advanced 0.026 150 3.9 Single Rafter or Joist Vaulted Ceilings U-Factor X Area = UA R-38 Vented 0.027 Above Grade Walls U-Factor X Area = UA R-21 0.056 280 15.7 Floors U-Factor X Area = UA R-30 0.029 150 4.4 Below Grade Walls U-Factor X Area = UA 2' Depth Walls 0.042 35 1.5 3.5' Depth Walls 0.041 7' Depth Walls 0.037 Slab Below Grade F-Factor X Length = UA 2' Depth 0.59 3.5' Depth 0.64 7' Depth 0.57 Slab on Grade F-Factor X Length = UA R-10 2' perimeter 0.54 R-10 Full - Heated 0.55 • Sum of UA 31 Envelope Heat Load 2033 Btu/Hour Sum of UA X AT Air Leakage Heat Load 1075 Btu/Hour ((Volume X 0.6)X AT)X.018)) Building Design Heat Load 3108 Btu/Hour Air Leakage+Envelope Heat Loss Building and Duct Heat Load 1 3108 Btu/Hour If ducts are located in unconditioned space:Sum of Building Heat Loss X 1.15 If ducts are located in conditioned space:Sum of Building Heat Loss X 1 Maximum Heat Equipment Output 150% 4662 Btu/Hour WSEC Priidti141100tliddltabiidiq WSUEEP10-010 Copyright 2010 *.r•io a? Fta�J!n! 'f S '�i 'si Jt t-'t= '"t£ t "z }art t `:t•ti?P.v1T j i. ' ea ` l: ... 6.5 How Cells Regulate Enzymes-FYI "' ' f.,31 fst l,'t�ii ®Did you watch the animation? ;,: ; ;)iftrifo(;rir}TSS O Cells can control enzymes by altering their shape •allosteric enzymes are affected by the binding of signal molecules o the signal molecules bind on a site on the enzyme called the �#fltt?+a: allosteric site r, '7£ pS i ,'i;�7 X1.9 tt' o some signals act as repressors M.+ •inhibit the enzyme when bound o other signals act as activators •change the shape of the enzyme so that it can bind substrate i '. t .1ti V h Ff t,:�s•tii.t%`�tA.—l- fr.31A X 'tr,);;-.1., -€. ' r... • 'galea Fig 6.9 Allosteric Enzyme Regulation-FYI eYrarii1 w011111 dtsi2 1 r1a.n tt G ;y t-a6R:.! 3irf~1no Odle 6.5 How Cells Regulate Enzymes-FYI O Feedback inhibition is a form of enzyme inhibition where the product of a reaction acts as a repressor AU le tciva •competitive inhibition o the inhibitor competes with the substrate for the active "1 940151,,'1"t site o the inhibitor can block the active site so that it cannot bind substrate �' `:•Ssc,8e. 74,E •non-competitive inhibition o the inhibitor binds to the allosteric site and changes the shape of the active site so that no substrate can bind 4-10 ,<P. "it ii61S6,f+�i r t .>'ec;.ftsofiEdi toirui?. ,`,z:€ S iitNt? fit. 'iiJtto ar fil ??°t,.i 1sf .d tbl :i itt ifl yr ,} ,M:.,.}`aeft)I:iii"Yr: 'i belt-:pi p w n _ c'=; 'f ItiCOLI fx19114611 i Vt H mumix6M 110 Glazing Schedule - Project Information Contact Information sather eric 509 230 9808 14210 e 13th ave Conditioned Floor Area 150 Sum of UA for Heating System Sizing 5.4 Sum of All Glazing Areas From Below 18 Glazing to Floor Area Ratio 12.00% 602.7.2 Exception Ratio (not to exceed 1%) Exterior Doors Plan Component Door Percent Width Height Glazing Door Door ID Description Ref. U-factor Glazed Qt. Feet inch Feet Inch Area Area UA One Exempt Swinging Door<24 Square Feet Sum of Glazing Area, Door Area, and UA (do not include exempt door) Area Weighted U= UA/Area Sum of Area and UA for Heating system size only(include exempt door) Vertical Glazing (Windows, Glazed doors using Exception 602.6#1) Plan Component Glazing Width Height Glazing ID Description Ref. U-factor Qt. Feet Inch Feet Inch Area UA 3 ftby 3ft window 2✓y y y 5 0.300 2 3 3 18.0 5.40 (c)t 4is Sum of Area and UA 18.0 5.40 Area Weighted U= UA/Area 0.30 WSEC Prescriptive Worksheet(2010 Edition) WSUEEP10-010 Copyright 2010 ^ ^ olvbee$38 enismN0 _ __ _ _ _ ___ _ __ , .` ` ' ... poo�"r.r� q _ -- - - ' - , � � -� r-----'-------------- --`-. ------'' .--. - _ - -' _ - ' � ���� ' __' — -' - —_ - _ , | - _ _ - _ _ '��v� /��_+ ��r��' - - - - -- ` xomewvrk*nmchenico 0 Catalyzed reactivmmay ___ occur together m —�p=�'--- ' . sequence �m� the productmmm ` �'^ �W��� .. ---� • reaction is the , substrate for the nex (1 reaction until nfinal /"" ------- ' -` product is made •the series of reactions --- ucalled a biochemical ..J !, _ _ 1 _pathway -----^~---^ " L _ _ _ i_^ _ • \�*. V�us°1 A�`��^. t .'x^�, u}Jt/u, `«+�v��\ /.,`� '^. � ���` , �� - - .�m ,z, / `` ," + 0. ' »& �o-�.1,m r�rr-��=^�� -~'�,' /" �~� ��`"?�^ �e-' ~/ �~^ "�-am� h$o�y*� Cont. ' ` ' ^ /n:!c! , enzyme activity Cil - when temperature ncreases the shape of the en�mecu�geuuemvnmmm:mme - protein chains ' r---~--1-- ---�-- -� . � . ' Cont. '- -enzymes function within an optimal pH ---- range ' -- -- - •mosenzymes work best within a pH ' - range of -exceptions are stomach enzymes tha ---- function in acidic ranges � -___� 4�._ '` ____ ^__--_-^ -_- OE1i vOUttS0n�!ms`»911«M5v�9129 33avv co, F;Irighy@n3 I'',10,MS 3U8V/ k�� - - • - NI-•-•. J Ir c r-'4 p -- u -r-'.i e., 17 ce. . '.., L_- ' a - • -t I '. i r Exrc_ P,a cep� e '/5 ? ?3 • 3003 4,4,/ 4 ' e `,7,4- iit - 1 , tat bT ye.,,_ erof) e#lit T Z \ it. tt7 ' ,70- Z. oit S. g") . t, , 1,4 . ANNI a 1, 'T. PROVE i ,4 1 �� u-)&, 4.. A $ BY: (0 _ 05d . I 4$4- fie) ,rr,jQoSe c.C' 1 fir Pe sc.6C net;i A ;1. ATE: V g� g L IvaqarI kifc seh 1 cam. Jl (-----) I I__ T i s %���(3�se��h - �ftrre - i I .7, 1 1 , _ 1 \i, 1 � .. i grvol ' o� _., _ _ _ _ _ _ _ _ 1 a1 -i. 4 liN I ti- .-\ /-46k4.‘ .....4,, ci 4 ci r7 --4- M 4- (7) b Oo6 Pa 4. M Target Date sheet For City Use Only PLUS Project 1 ( nary 17 Sall pokane Pdress Li-Z. f0 �' s Valley 11703 E Sprague Ave Suite B-3♦ Spokane Valley WA 99206 . 509.720-5240♦ Fax: 509.688.0037♦ permitcenter®spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application,we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date,we will contact you with a revised target date. _- 2(0 \A \ Your application review TARGET DATE is � The TARGET DATE is the date we estimate your project application will have had its initial technical review.It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review > Submit complete,accurate plans and documents. Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. > Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. > Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us by your target date.Staff may contact you before the target date if the initial review is complete.By following this procedure,you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1.Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check.The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete,your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3.Technical Compliance.Once an application is administratively complete,it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers.You should be contacted by phone,fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals,each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the ) application are received,a Permit Specialist will process the application and contact the person specified on your application for permit pick-up.Information regarding fees and pre-construction meetings(if required)will be provided by the Permit Specialist at that time. CD-003 V-7/06-21-11 Page 1 of 1 ,. .,...._\ - illif - / : 1 \ , / - lime 4 ._ ....40- -- / / Sc N ....J1 _....----- 'N - -'---- --/----- b. 3- <N ,N \