2015, 02-09 Permit: SW-15000081 Sewer SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW-15000081 Permit Issued Date: 02/09/2015
Expiration Date: 02/09/2016
Project Description: SEWER CONNECTION
Primary Contact: GORDON FINCH HOMES INC Applicant: GORDON FINCH HOMES INC
Phone: Address: 2901 N ARGONNE RD
SPOKANE,WA 99212
Phone:
Email:
SITE INFORMATION:
Site Address: 5505 E 14TH AVE Owner: GORDON FINCH HOMES INC
Parcel Number: 35234.1607 Address: 2901 N ARGONNE RD
SPOKANE,WA 99212
Phone:
Assessor's Description: RON-LYNN ADDITION LT 7 BLK 2 Email:
Inspection Area: : (509)477-3675
Water District: Spokane County Water Fire District: Spokane Valley Fire
District#3
Zoning: Land Area: 15059 Square Feet
CONTRACTOR INFORMATION:
GORDOFH102L1, Exp.06/06/2016
GORDON FINCH HOMES INC
101 N.ARGONNE RD.SUITE#C SPOKANE,WA
99212
509-926-7013
gordon@gordonfinchhomes.com
DETAILS:
Class Type Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
$125.00
FEE DETAIL:
Processing-Utilities $27.12
Utilities Permit $125.00
Total Fee: $152.12
CONDITIONS:
Inside Public Transit Benefit Area
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR&INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
SEWER PERMITS ARE VALID FOR ONE(1)YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES
DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER.ONE WORKING DAY NOTICE REQUIRED. PERMIT
ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
Date Printed:02/09/2015 15:14:15 Project Coordinator:Kathy Cummings
SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW-15000081 Permit Issued Date: 02/09/2015
Expiration Date: 02/09/2016
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed:02/09/2015 15:14:15 Project Coordinator:Kathy Cummings