Loading...
2014, 07-09 Permit: SW-14001013 Sewer SPOKANE COUNTY UTILITIES PERMIT Application Number: SW-14001013 Permit Issued Date: 07/09/2014 Expiration Date:07/09/2015 Project Description: SEWER CONNECTION Project Name: BETTMAN'S ADDITION Primary Contact: KUNTZ CONSTRUCTION LLC Applicant: KUNTZ CONSTRUCTION LLC Phone: 509-270-9004 Address: 9303 N MOUNTAIN LN SPOKANE,WA 99218 Phone: 509-270-9004 Email: kuntzbuild@gmail.com SITE INFORMATION: Site Address: 6111 E 14TH LN Owner: MANDATE PROPERTIES,LLC Parcel Number: 35243.0990 Address: 9303 N MOUNTAIN LN SPOKANE,WA 99218 Phone: 509-270-9004 Assessor's Description: BETTMAN'S ADD LT 17 BLK 8,TOGETHER WITH Email: kuntzbuild@gmail.com PTN OF 14TH AVENUE WHICH WOULD ATTACH BY OPERATION OF LAW. (REFER ACO 2007- 0902) Inspection Area: :(509)-477-3675 Water District:Spokane County Water Fire District:Spokane Valley Fire District#3 Zoning: Land Area:6750 Square Feet CONTRACTOR INFORMATION: KUNTZCL874BQ, Exp.01/18/2015 KUNTZ CONSTRUCTION LLC 9303 N MOUNTAIN LN SPOKANE,WA 99218 509-270-9004 kuntzbuild@gmail.com DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 $125.00 FEE DETAIL: Processing-Utilities $26.64 Utilities Permit $125.00 Total Fee: $151.64 CONDITIONS: Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. Possible FEMA Flood Zone Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG—AT LEAST 2 WORKING DAYS IN ADVANCE.SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR&INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. _ SEWER PERMITS ARE VALID FOR ONE(1)YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER.ONE WORKING DAY NOTICE REQUIRED.PERMIT ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. Date Printed:07/09/2014 12:49:04 Project Coordinator:Dawn Dompier SPOKANE COUNTY UTILITIES PERMIT Application Number: SW-14001013 Permit Issued Date: 07/09/2014 Expiration Date: 07/09/2015 INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. _ SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME.BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed:07/09/2014 12:49:04 Project Coordinator:Dawn Dompier