2012, 10-23 Permit: SW-12002422 Sewer l �
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW-12002422 10/23/2012
Expiration Date:
Project Description: SEWER CONNECTION Primary Contact: KALIN EXCAVATION
Project Name: VALLEYVIEW Applicant: KALIN EXCAVATION
Permit Type: SEWER Address: 9229 E WOOLARD RD
COLBERT,WA 99005
Phone: 509-954-9101
Email:
SITE INFORMATION:
Site Address: 6515 E 14TH AVE Owner: LARUE, LARRY L&SUSAN K
Parcel Number: 35243.2102 Address: 6515 E 14TH AVE
SPOKANE VALLEY,WA 99212
Subdivision: BUTTERCUP ADDITION Phone:
Assessor's Description: BUTTERCUP ADD LT 2 BLK 1 Email:
Inspection Area:
Water District: Spokane Fire District:Spokane Valley Fire
County Water District#3
Zoning: Land Area: 11880 Square Feet
CONTRACTOR INFORMATION:
General Contractor
KALINE*0431 B
KALIN EXCAVATION
9229 E WOOLARD RD
COLBERT,WA 99005
509-954-9101
DETAILS:
Class Type Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
$125.00
FEE DETAIL:
Processing-Utilities $25.94
Utilities Permit $125.00
Total Fee: $150.94
CONDITIONS:
Inside Public Transit Benefit Area
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE.SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR&INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
Date Printed:10/23/2012 10:34:47 Printed by:IIS APPPOOL\ASP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW-12002422 10/23/2012
Expiration Date:
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION. _
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. _
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 10/23/2012 10:34:47 Printed by:IIS APPPOOL\ASP.NET v4.0