2010, 11-30 Permit App: 10003876 Deck Project Number: 10003876 Inv: 1 Application Date: 11/30/2010 Page 2 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Building Permit
Contractor: WRIGHT BROTHERS SUNROOMS Firm: WRIGHT BROTHERS SUNROOMS
Address: 15704 E SPRAGUE Phone: (509)927-1190
SPOKANE VALLEY WA 99037
Building Characteristics
Group: U-1 Type: VB
Total Area 160
This Application: Total Project:
Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation
COV DECK R-3 VB 160 SF 0 $10,000.00 0 $10,000.00
DECK
Totals: 0 $10,000.00 0 $10,000.00
Item Description Units Unit Desc Fee Amount
RESIDENTIAL PERMIT FEE 1 SELECT $181.25
WSBCC SURCHARGE 1 SELECT $4.50
SF PLNS RVW<7999 SQ FT 1 SELECT $72.50
Permit Total Fees: $258.25
Notes: _
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $258.25 $258.25 $72.50 $185.75
$258.25 $258.25 $72.50 $185.75
Disclaimer:
Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information
contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: jmm Print Date: 11/30/2010
Project Number: 10003876 Inv: 1 Application Date: 11/30/2010 Page 1 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information:
Permit Use: 160 SF COVERED DECK Contact: WRIGHT BROTHERS SUNROOMS
Address: 15704 E SPRAGUE
C-S-Z: SPOKANE VALLEY WA 99037
Setbacks:Front Left: Right: Rear: Phone: (509)927-1190
Group Name:
Site Information Project Name:
Plat Key: CONY Name: CONVERTED CNTY DATA District: Sout
Parcel Number: 35244.1902 Block: Lot:
SiteAddress: 6808 E 14TH AVE Owner:Name: THOMPSON,SHARLENE R&GEO
Address: 6808 E 14TH AVE
Location::CSV SPOKANE,WA 99212-0154
Zoning: R-3 SF Res District
Water District: 020 EAST SPOKANE Hold: ❑
Area: 17,625 Sq Ft Width: 112 Depth: 176 Right Of Way(ft): 0
Nbr of Bldgs: 0 Nbr of Dwellings: 0
Review Information• VR44,4. - pAa
Review
Building Plan Review Released By:
Originally Released: 11/29/2010 By: Bdbebout
Septic Sys Review Released By:
Originally Released: 11/24/2010 By: LHALSEY
Landuse/Zoning/HE Conditions Released By
Originally Released: 11/23/2010 By: lbarlow
Permits:
Operator: JD Printed By: jmm Print Date: 11/30/2010
Peinlit Center
SCITY os -- , 11703 E Sprague Ave,Suite B-3 PERMIT NUMBER:
pokane Spokane Valley,WA 99206 PERMIT FEE:
vValley (509)688-0036 FAX:(509)688-0037
www.spokanevalley.org
Community Development
Residential Construction New Construction Accessory Bldg
Permit Application Addition/Remodel 4 Deck
Other:
SITE ADDRESS: 6 8 Og /5 / 414 A V,
ASSESSORS PARCEL NO: LEGAL DESCRIPTION:
Building Owner: Contractor:
Name: Name:
, DRag rflattPcreRJ
Cr ii; Viz 1Gf-F/ -$2D7WF'i25 .Sif,042-21o/NS Us_
Address: 68o g F /q4Il tJiE: Address:/-5-7 4 li ftRA.GK•C 4,
City: State:
State: �� Zip: Z/Z City: 570State:J,6 1/kl(.«'y State: Zip
Phone y, Fax: Phone 0q 92 7— l/90 Fax: c2-7 399Z—
Contractor
99Z—
Contractor Lic No: Exp Date: � j
UOA,/6,4'446 yQ2 BR
Contact Person City Business Lic.No: Z 0 7q 547—
Name:
Phone:
Describe the scope of work in detail: Cost of Project: $ /O DO 02"
Proposed Use: 00--s ,jam 6`7'64
**************The following MUST be complete: (write N/A if not applicable)**********************
HEIGHT TO PEAK:8 / DIMENSIONS: #OF STORIES: / TOTAL HABITABLE SPACE:
MAIN FLOOR TO SQ. 2Nu FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE
FTG: AREA:
/(.D
FINISHED BASEMENT GARAGE SQ. FTG: DECK/COV. PATIO SQ. FTG: 30% SLOPES ON
SQ. FTG: /60 PROPERTY: a
#OF BEDROOMS: CONSTRUCTION TYPE: HEAT SOURCE: SEWER C ---SEPTI
Woad /WA-
The permitee verifies,acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling,the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws,codes or ordinances.6) Plans or additional information may be required to be submitted,and subsequently approved before
this application can be processed./,�
SIGNATURE: _gli y DATE: ///2, -- -- --- -
Method of Payment __
❑ Cash 0 Check 0 Mastercard 0 VISA 8""` r IlV; ` 'j ' " -
Bankcard#: Expires: VIN#: E3,g4� ,4
Authorized Signature: J _
REVISED 2/15/07
N j
RESIDENTIAL CHECK LIST DIRECTIONS:
Place a check mark in box next to each document required for complete submittal.
o SITE PLAN
o Property lines and dimensions ❑ Setbacks to property lines
❑ Direction arrow pointing North and orientation to streets o Distance between buildings
❑ Proposed/existing buildings (footprint and dimensions) o Right of way/easement location &sizes
o Utilities, septic tank/drain field locations and distances o Driveway approach size and location
BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned)
❑ Elevations (Front/Rear/Sides)with roof peak and wall height including basement:
❑ Foundation Plan (crawlspace, basement or slab on grade):
o Footing sizes and locations o Supporting wood cripple walls or beams
o Perimeter concrete foundation wall sizes o Thickened concrete pads supporting
o Crawlspace ventilation beams or girder trusses
❑ Floor Plan of each level (finished or unfinished)with dimensions:
o Floor Joist direction, size and spacing o Window and door location and sizes
o Header, beam or concrete lintel sizes ❑Window well locations if applicable
o Brace wall panel locations o Room usage labels
o Water heater and furnace locations o Smoke detector locations
❑ Exhaust fan locations o Attic and crawl space access locations
❑ Deck or concrete patio sizes and locations ❑ Fire Wall construction
❑ Roof Plan:
o Engineered truss direction and spacing o Ridge, eave and valley lines
o Rafter and over frame direction, size and spacing o Beam and girder size and location
❑ Wall Section Detail including:
Roof
o Slope/roofing material/underlayment/ ice dam protection o Truss or rafter size, spacing &connection
o Sheathing size and type o Attic insulation/air space baffle/ventilation
Ceiling
o Joist size and spacing o Size of ceiling gypsum wall board
Wall
o Height/top plate/stud size and spacing/sole plate ❑ Siding/exterior house wrap/anchor bolts
o Exterior sheathing size and type o Insulation, vapor barrier, gypsum wall board
Floor
o Joist size and spacing o Sheathing or concrete floor size/insulation
Foundation Wall
o Concrete or Masonry unit width o Footing bottom to finished ground level depth
o Earth to wood separation distance o Horizontal &vertical reinforcement if any
Footing
o Size ❑ Reinforcement if any
Radon
o Passive system with Emil vapor barrier o Active system with 6 mil vapor barrier
Miscellaneous Construction Details
❑ Deck:
o Floor plan/side view/dimensions o Footings/post/and beam size and locations
o Floor Joist/decking direction, size and spacing
O Stairway tread rise& run and nosing 0 Handrail/Guard height&spacing
New project 0
Project Previous pre-app meeting ❑
SC1TY. o p poIianeOFkatiOlgi\faTransmittal Plan revisions 0
City of Spokane Valley Transmittal Date:
4011011110 Valley
Community Development Tuesday,November 23,2010
Department
11703 E.Sprague Ave,Suite B3
Spokane Valley,WA 99206
Phone: 509.688.0036
Site Address: 6808 E 14TH AVE Project Number: 10003876
Parcel Number: 35244.1902
Zoning: R-3 Water District: EAST SPOKANE
Fire District: FD 01
Applicant: WRIGHT BROTHERS SUNROOMS Owner: THOMPSON.SHARLENE R & GEO
15704 E SPRAGUE 6808 E 14TH AVE
SPOKANE VALLEY WA 99037 SPOKANE, WA 99212-0154
(509) 927-1190
e-mail: e-mail:
Contact: WRIGHT BROTHERS SUNROOMS Occupant:
15704 E SPRAGUE e-mail:
SPOKANE VALLEY WA 99037
(509) 927-1190
e-mail:
Contractor: WRIGHT BROTHERS SUNROOMS Arch/Engineer: •
15704 E SPRAGUE
SPOKANE VALLEY WA 99037
(509) 927-1190
e-mail:
Project COVERED DECK
Description:
Building Landuse Engineer Utilities Health Fire Dist Assessor
APPLICATION \
SITE PLAN ( i
PLANS
Please send all plan review and project comments via e-mail to the
highlighted individuals.
11/23/2010 13:00 509-324-3603 SRHD ENVR HEALTH PAGE 01/02
SPOKANE COUNTY HEALTH DISTRICT
•
E. C. PLOEGER, M. 0., M.P.IH., HEALTH OFFICER
N. 819 Jefferson Street
Spokane, Washington S9201 ,
• DATE
• , .
..„).. /
PERMIT NO. /4 it‘f / • • .
No. •A 16114
APPLICATION FOR PERM T TO INSTALL OR RECONSTRUCT SEWAGE DISPOSAL FACILITIES
Name 62,-,—, . (..4.-- 00?-•-) Address zo Q g ,...e4r,c-t .. Phone Na
Address of Proposed Slte - 4: 4.*If VI ,4•••LO'f•c":-i.41efii . ,..'d.• •
eszt.„....bjete4,c467
Typo of Use •Is basement for building planned?
ca7 ,
Number of Bedrooms - Solidify:,Capecity Camp Capacity • —70ther ,
Water Supply . —: .- eae.. .... (City, Well. Spring). Drywoll
—,--
Septic tank capacity 9:4,O ____,gale. Style of tank
Length of disposal field de-tile) .. AbsorptInn Plts 41 Leach Bed -----'
III Show rolfava NICO11011 Mu Prehetell Rao% oiptla 1,0k. 1
&yam, 9101, ..bit, game wed ether out Whitest.
la) MOM 11051 Of ee 1100vy BIM Or MON area Of soy
t) .•
Ma Importimt tepogrohle detail.. • i'`'') 4) . 1.
.
t7AY)
1 ,. e
.21CITE' trW•AGE
.
CYSTEM AEPFlii1Eifin 8T rHE i'kAWIN4
IS NO7 TO SE CMISTIIUE() kS AN . 6 ; - . .
kX
•
•0g10,9cAJA0N_Pf...IiiklATF.m. . • . ,
. ,
•
, • Atai I: 11 114-
. ,
:440,4
Indlillar —,-JeaT27......‘ •
— ". • .
'70
,I Final I
ni.IsI_1p-ecti,.i. Date
R-....liraty. (i7)-. ...1..
r1,Ldi.A•.,.i,.,.,s,Ml, o.1..)r'.-7-1c14t1,
..r/ id‘„ w ' .4mi
_ 1ffIFIMiPi / 77i711In " PI
'
lC" .'o
• .
. ' le htiPat ' 1
R, AVM"
r ,
ir-*lt..?.L
•,
/ •fr•I - -41.4r.r. Ap .5 . 16 --
coNTRACT01)(\e0-47ril . - (f/k4
. .
. .
. . '
1 . •.. ,
. .
010 040 ROT.NYALTH • • NM -:-.-o ,: ••• :T, .,kr spoons catury ifeiiit Diosid
4
......„.. --__ _ 1 . .
. IV
A
i'l• rA AVE
• 30 ,
1 i
- ,
s vsmil
/tv 7111,5 ,4 iztTiti-
r - 4-71,5 ---). . \ I
f - -
• 1
. A 1
A) ri to DA'a4'
. .
1 /75
,. .
1
, So*
i
__. ..._ . _. I/
•
,
Ili
I
APPROVED BY L,6641.61/
1 ,
1 R E C E F'd E:11) i
7,11k". SV P E Fi M IT (1`.,EN-f E.'c-i • .
..,
MITI ''.1
0,....'e A.- ,
Proiect:1:!- \_ill .-4, --;Iii)4-a•---T.C3 1 & S.oe ii-_-
sP 0 eovi.c (4/4--
For City Use Only
S1iôy
PPojumber
PtAd
4000
a
O 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re-submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure,you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred
submittal.This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email,or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re-
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE-APPLICANT PINK-BUILDING FILE REV 9/07