Loading...
2012, 11-02 Permit: SW-12002490 Sewer SPOKANE COUNTY BUILDING,4ND PLANNING PERMIT Permit Issued Date: Application Number: SW-12002490 11/02/2012 Expiration Date: Project Description: SEWER CONNECTION Primary Contact: ACME EXCVT&SEWER BORING CO Project Name: ROTCHFORD Applicant: ACME EXCVT&SEWER BORING CO Permit Type: SEWER Address: 6808 S.LINKE RD. GREENACRES,WA 99016 Phone: (509)228-0691 Email: SITE INFORMATION: Site Address: 15619 E 14TH AVE Owner: KUCK, RUSSELL&KANDI Parcel Number: 45243.0215 Address: 15619 E 14TH AVE VERADALE,WA 99037-9211 Subdivision: ROTCHFORD ACRE Phone: TRACTS Assessor's Description: ROTCHFORD ACRE TRACTS L15 B2 Email: Inspection Area: Water District:Vera Fire District:Spokane Valley Fire Irrigation District#15 Zoning: Land Area:45000 Square Feet Setbacks: Front Rear Left Right RESIDENCE W/GARAGE 20 50 5 5 CONTRACTOR INFORMATION: General Contractor ACMEEES963LD ACME EXCVT&SEWER BORING CO 6808 S.LINKE RD. GREENACRES,WA 99016 (509)228-0691 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 $125.00 FEE DETAIL: Processing-Utilities $25.94 Utilities Permit $125.00 Total Fee: $150.94 CONDITIONS: CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE.SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR&INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Date Printed:11/02/2012 09:14:41 Printed by:IIS APPPOOL\ASP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW-12002490 11/02/2012 Expiration Date: FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED.PERMIT ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION.INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME.BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed:11/02/2012 09:14:41 Printed by:IIS APPPOOL\ASP.NET v4.0