16-091.06 Meridian Construction: City Hall itp -O I Olp
'�` ;� r�},�I`��c�'( est int SPOKANE VALLY CITY HALL
1 J ', ,Ar<hifectu(e •tlndiwp :thitecturi
FtANGE ORDER 006
r Issue bate; *124/2017
s%pk=ci rri;lrsk than u,c.3t arch:tr4turc
PROJECt ; OWNER CONTRACTOR DISTRIBUTION
Spokffe Valley City Nall 'City of Spokane Valley ; Meridian Construction Steve Worley ___ ,
10210E.Sprague 11707 E.Sprague Ave. 1231.0E Mirabeau Parkway Mark D'Agostino _
Spokane Valley,WA 99296 a Suite 106 • Suite 100 ,Steve Roth
Spokane Wiley,WA 99206. Spokane Valley,WA Mit lim Paras
CONTRACT FOR:_ ' -GENERAL CONSTRUCTION
CONTRACTl)ATE: ' 5:211.2016
'You are hereby directed to make the following&fanges in the contract:
REFERENCE DESCRIPTION AMOUNT
COP23R2 Adjust Position of Sitik In 5203 Coffee Bar $1,796.51 '
ASI-10 , , .
COP'041 14VAC Zoning Kit Power $1988.37
CCD-009
RFI-t)82
COP-043 Electrical Panel Clearance et Door 5115 $793.16 '
,CCD-0137
COP-046 Minimum Plumbing for Future Basement TI $3,166.54
PR-013
COP-049 Added Soffit in Room N301 .,$1,2861.4
PR-014
d
TOTAL _ 9,03012 ,4
The Original Contract Sum was: $9,742,700.00
Net Change by Previously authdrized Change Orders: $47,738.26
The Contract Sum prior to this Change Order Was: $9,790,438.26
The Contract Suit WEEI be increased by this Change Order in the amount'of; $9,030.72.
The new Contract Sum including this Change Order will be: $9,799,468.98
The Contract time will be unchanged/Changed by: _ 0 days
The Date of Substantial Completion as of the date of this Change Order therefore is: 7/25/2017
ARCHITECT CONTRACTOR .OWNER REPRESENTATIVE
Arifiltects West,Inc. Meridian Constructiorf City of Spokane Valley
210 E.Lakeside Ave. 12310 E.Mirabeau Parkway,Ste 100 11707 E.Sprague Ave.,Suite 106
Coeur d'Alene,ID 63814 Spokane Valley,WA 99216 Spokane Valley,WA 99206 ,
SIGNATURE: SIGNATURE: 516 ATOM:6ithit,\......_ ,
M1 i A .,
16619-SPOKANE VALLEY drY NALI CHANGE ORDER006-1/24/2017
Pageie2