2007, 12-14 Permit App: 07004840 Pole Bldg Project Number: 07004840 Inv: 1 Application Date: 12/14/2007 Page 1 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information:
Permit Use: 24 X 40 POLE BLDG/10 X 24 ENCLOSED ATT Contact: BUNKER BUILDINGS
LEAN TO/9 X 40 OPEN LEAN TO Address: PO BOX 48287
C-S-Z: SPOKANE,WA 99208
Setbacks:Front Left: Right: Rear: Phone: (509)468-8182
Group Name:
Site Information: Project Name:
Plat Key: 002316 Name: ROTCHFORD ACRE TRACTS District: East
Parcel Number: 45243.0306 Block: Lot:
SiteAddress: 15722 E 14TH AVE Owner:Name: RICE LIVING TRUST
Address: 15722 E 14TH AVE
Location::CSV VERADALE,WA 99037-9228
Zoning: R-1 SF Res Estate District
Water District: 010 VERA Hold: ❑
Area: 48,000 Sq Ft Width: 160 Depth: 279 Right Of Way(ft): 60
Nbr of Bldgs: 1 Nbr of Dwellings: 10
Review Information: .._ ,, .: :. _.,- . . w -tft
Review
Building Plan Review ReleasedBy:
Originally Released: 12/14/2007 By: TMELBOU
Septic Sys Review Released By:
Originally Released: 12/14/2007 By: LHALSEY
Landuse/Zoning/HE Conditions Released By:
Originally Released: 12/13/2007 By: tschmidt
Permits: -,u = .mwiggi +mox , ftvgiamu mygmgaztizatiogng
Operator: JD Printed By: jmm Print Date: 12/14/2007
Project Number: 07004840 Inv: 1 Application Date: 12/14/2007 Page 2 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Building Permit
Contractor: BUNKER BUILDINGS Firm: BUNKER BUILDINGS
Address: 1028 W ROSEWOOD Phone: (509)468-8182
SPOKANE,WA
This Application: Total Project:
Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation
CARPORT OP R-3 VB 360 $5,400.00 360 $5,400.00
POLE BDLG U-1 VB 1,200 $22,800.00 1,200 $22,800.00
Totals: 1,560 $28,200.00 1,560 $28,200.00
Item Description Units Unit Desc Fee Amount
RESIDENTIAL PERMIT FEE 1 SELECT $431.65
ACCESSORY PLANS REVIEW 1 SELECT $107.91
WSBC SURCHARGE 1 SELECT $4.50
Permit Total Fees: $544.06
Notes ce _ . .u. - - 4� .w�. "MA, .. __� ... na. ..m.
Payment Summary: i" ::.1SOMG =•"'-::5..:�„ � k.x ..a'".�., i .4 -,�,,,fr _._. ...:zMIEN". «vag° i:s.` ..:_.
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $544.06 $544.06 $0.00 $544.06
$544.06 $544.06 $0.00 $544.06
Disclaimer:
Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information
contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: jmm Print Date: 12/14/2007
__, � Yermit Center
S Oka e 11707 E Sprague Ave, Suite 106 PERMIT NUMBER: WA()
Valley
Spokane Valley, WA 99206 PERMIT FEE:
(509)688-0036 FAX: (509)688-0037
Community Development www.spokanevalley.org corn
Residential Construction o New Construction o Accessory Bldg
Permit Application o Addition/Remodel ❑ Deck
o Other:
SITE ADDRESS 'S7 ZZ £ //1. T1
ASSESSORS PARCEL NO: 15143 • 03�(' LEGAL DESCRIPTION:
Building owner Contractor.
Name: Lk 1cQ •
Name:key .S-ter1 E.1Lid l 3ii'X',
Address: S-A Address: [7. 0. &X ig233 7
City: Zip: City:SFr)} 941 e Zip: 17722.8
Phone f t- 11814-- Fax: Phone: '/Lo —SI $2Fax: +U$.-gl q3
Lic No: NUS$ $6r: I I DS I o-r
Contact Person.:. _ (Q IfS
City Business Lic No: OZ .5b?j
Name C). r. to,,V.e.R.Phone: L4 4'�- 1 -
Describe the scope of work in detail: Cost of Project: $ D1-1 , (..77
k`+)& yo x 14 MA-t... elas ,,I /0/X 1- ' > �d e..,N clo-5 a Lc. ,"-To 0,4
9 o' , 92G " bF~ Aiilzkc, Ie4 L. r.— 10
**************The following MUST be complete: (write N/A if not applicable)**********************
HEIGFJT Tp PEAK: DJ,MENS[ONS: #OF STORIES: TOTAL HABITABLE SPACE:
MAIN FLOOR TO SQ. 2ND FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE
FTG: AREA:
CA l2 NEI- SQ FTC.
FINISHED BASEMENT GARAGE SQ. FTG: G: 30% SLOPES ON
SQ. FTG: /, -00 to tL o PROPERTY: PJO
#OF BEDROOMS: CONSTRyCATION TYPE: HEAT SOURCE: SEWER OR SEPTIC?
DISCLAIMER v8
The permitee verifies,acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling,the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal,state or
local laws, codes or ordinances.6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be processed.
Signature --r„./%., Date /)—:///70—)
Method of Payment: (Faxed permit applications will only be accepted with major bankcard)
0 Cash ❑ Check ❑ Mastercard ❑ VISA ❑ Other
Bankcard#: Expires: VIN#:
Authorized Signature:
REVISED 8/25/2005
e
Valley
11707 E Sprague Ave Suite 106 ♦ Spokane Valley WA 99206
509.921.1000 ♦ Fax: 509.921.1008 ♦ cityhall@spokanevaltey.org
Residential Plan Submittal Minimums
O Completed Building & Mechanical application with: Accurate address, Parcel
Number and/or Legal Description, description of work, owner and contractor
information, signature, and date.
❑ Two sets of plans including Site Plan, elevations, floor plans, foundation plans •
W th details, roof plan, framing plans & details.
❑ -~-Sti the height of.any proposed buildings or accessory structures.
z Floor plan for each floor;'Dimension to scale (minimum 1/8") and label each
stabto (including' q.''foofage of house and garage on plans) Show each
t-- - ' lev ' i `he! ,d square footage of any additions.
Alh braced.-wall panel types: show locations and details of installation, including
engineered design.
❑ Egress windows: Provide at least one window or exterior door approved for
Emergency escape or rescue from a basement and in every room for sleeping.
❑ Smoke detector locations
❑ 22" X 30" attic access location
❑ 18" X 24" crawl space access:
❑ One-hour separation detail: between house and garage
❑ Floor framing details: Joist type, size, spacing and installation details
❑ Roof framing plan and details
❑ Furnace and hot water heater location.
❑ All header locations: type, size, and connections
❑ Foundation plan
❑ Insulation information
Pro• ectNew project :2
Previous pre-app meeting 0
Arl an
o
ne Transmittal Plan revisions
P
City of Spokane Valley Transmittal Date:
Community Development Tuesday,December 11,2007
41010001°Valley
Department
11703 E.Sprague Ave,Suite B3
Spokane Valley,WA 99206
Phone:509.688.0036
Site Address: 15722 E 14TH AVE Project Number: 07004840
Parcel Number: 45243.0306
Zoning: R-1 Water District: VERA
Fire District: FD 01
Applicant: BUNKER BUILDINGS Owner: RICE LIVING TRUST
PO BOX 48287 15722 E 14TH AVE
SPOKANE, WA 99208 VERADALE, WA 99037-9228
(509) 468-8182
e-mail: e-mail:
Contact: BUNKER BUILDINGS Occupant:
PO BOX 48287 e-mail:
SPOKANE, WA 99208
(509) 468-8182
e-mail: II( j j
❑ ,tom, ;� lC, �� `t1 �� j
Contractor: BUNKER BUILDINGS Arch/Engineer: i❑ !Vii,'
1028 W ROSEWOOD ____, 2001
SPOKANE, WAED
(509) 468-8182C
D I] [L ❑ _ [N1
e-mail:
Project 24 X 40 POLE BLDG/10 X 24 ENCLOSED ATT LEAN TO/9 X 40 OPEN LEAN TO
Description:
Building Landuse Engineer Utilities Health Fire Dist Assessor
r
APPLICATION \ C
SITE PLAN V
PLANS V
Please send all plan review and project comments via e-mail to the
highlighted individuals.
�
Pct.
150 1-14
A A-
o _
•
0c.5e T+1
1572:2-e. 14
L _ . >LI
A& 340#ore^ A •
J, fL- -c Se
tc0
cn
1004
•
PLANNING DEPT. APPROVED
BY
DATE: W1 3/67
For City Use Only
PLUS Project Number ()7 ,...0b1.1 �{�-
CITY OF Project Address /5-722_
Spoliane E I ;',2
a e °
y 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
, •WV
509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
I Your application review TARGET DATE is 121 1 c6 (07
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
l
1 Tips for a Smoother Project Application Review
i
> Submit complete, accurate plans and documents.
Extra time may be required for re-submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
> Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
> Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure,you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email,or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re-
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE-APPLICANT PINK-BUILDING FILE REV 9/07