Loading...
2012, 08-08 Permit: SW-12001939 Sewer SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW-12001939 08/08/2012 Expiration Date: 08/09/2012 Project Description: SEWER CONNECTION Primary Contact: GOBERS LLC Project Name: VALLEYVIEW Applicant: GOBERS LLC Permit Type: SEWER Address: 11215 E TRENT AVE SPOKANE,WA 99206 Phone: 509-924-5372 Email: SITE INFORMATION: Site Address: 6021 E 19TH AVE Owner: CROSS, KAYLA R Parcel Number: 35252.1603 Address: 6021 E 19TH AVE SPOKANE,WA 99206 Subdivision: VALLEY VIEW HILLS Phone: FOURTH ADDITION Assessor's Description: VALLEY VU HILLS 4TH ADD L3 B2 Email: Inspection Area: Water District:Spokane Fire District: Fire District 8 County Water District#3 Zoning: Land Area: 14175 Square Feet CONTRACTOR INFORMATION: General Contractor GOBERL*899L7 GOBER'S LLC 11215 E TRENT AVE SPOKANE,WA 99206 509-924-5372 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 $125.00 FEE DETAIL: Processing-Utilities $25.94 Utilities Permit $125.00 Total Fee: $150.94 CONDITIONS: Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE.SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR&INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Date Printed:08/08/2012 14:07:34 Printed by:IIS APPPOOL\ASP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT . Permit Issued Date: Application Number: SW-12001939 08/08/2012 Expiration Date: 08/09/2012 FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME.BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed:08/08/2012 14:07:34 Printed by:IIS APPPOOL\ASP.NET v4.0