Loading...
2014, 10-09 Permit App: APR-2014-0107 Approach Community Development Department (Staff Use Only) Permit Center Spolane 11703 East Sprague Avenue,Suite B-3 PERMIT NUMBER: Spokane Valley,WA 99206 PERMIT FEE: ./s Valley x Tel:Fax:(509)(509) 688-003720-52407 pennitcenter 2Ilspokanevallev.orq APPROACH PERMIT APPLICA'T'ION'ect ,.-,___ /.0 7 Q 'J PROJECT ADDRESS: `_ � �-�±L\ RECEIVED i ANTICIPATED COMPLETION •DATE: — ►�.` L/ 0 START DATE: Q-��O -/ , i BUILDING OWNER NAME: Q✓e `Ci d4L j 3006.21 CSV PERMIT CENTER MAILING ADDRESS: 1A D CITY: L S . S ATE: / I B( � o3 P F V. �`_ CONTACT PERSON NAME: Si-e%e • PHONE: 3j '/ ` C(3.761.761 +s)_ FAX: CELL: j j CON'IRACTORNAME: 111�cjll l k ) -6bv\ MAILING ADDRESS: S:1 Mei CITY: STATE: ZIP: PHONE: 1/4S::3f hie, FAX: CELL: CONTRACTOR LICENSE#: 'kD311,C,`ST)f7&N EXPIRES: // ( /2"/ CITY BUSINESS LICENSE#: PROJECT DESCRIPTION(Please Provide Site Sketch) yResidential Driveway 0 Commercial/Industrial Driveway 0 Existing Curb&Gutter 0 Rural Road Section Culvert Installation 0 Sidewalk Repair/Construction Other Conditions: Bond/Insurance certification must be on file with the City. DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will be served by potable water. 2)Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance wit j he City of Spokane Valley D-velopment code. Referenced codes are available for review at the City of Spokane Valley Permit; e er.5) The C'ty of Sp• ane Va ey permit is not a permit or approval for any violation of federal,state or local laws, codes or o i ces. • P : s or .dditional .. ormation may be required to be submitted and subsequently approved before this appli :tio , e pro -s•e• Signature 06 , Date: 90/21 i DE-001:V-1 Page 1 of 2 APPROACH PERMIT APPLICATION REQUIRED SKETCH INFORMATION Provide required measurements(in sketch boxes),and include street name. Check all existing conditions that apply: ]Sidewalk 0Drainage Ditch ft wide 111Drywell(show location on sketch) ft from back of curb [;Other(please describe below) LStreetside Swale w! DISTANCE FROM z' I NEAREST PROPERTY LINE D! MAY BE LEFT OR RIGHT SIDE) i . ; FT(SEE TABLE) w dI / o; a.' CONCRETE APPROACH CRETUURB RN CURB IN4—THROAT EITABLE) I1 N I IF CORNER LOT, 4 DISTANCE FROM STREET NAME � —� CURB RETURN (SEE TABLE) STREET WITH CURB DISTANCE FROM z; - - NEAREST PROPERTY LINE ' MAY BE LEFT OR RIGHT SIDE) 1 FT(SEE TABLE) m' ___) a; 15'RADIUS d� ASPHALT RETURN APPROACH /_,..--------'----- EDGE OF i [-THROAT WIDTH nFT (SEE TABLE) SIF CORNER LOT, ASPHALT DISTANCE FROM STREET NAM E RADIUS RETURN Q FT(SEE TABLE) STREET WITH ASPHALT EDGE Approach Requirements: • Maximum 2 approaches per property frontage;one on arterials. • Total width of approaches not to exceed 50%of frontage width. Residential Approaches Commercial Approaches Distance from Curb/Radius Return 15'minimum 75'minimum Separation between Approaches(measured from centerline to centerline of See Page 7-27 each approach) None specified in City Street Standards Throat Width(flat portion) 16'min.,30'max. 30'min.,40'max. Wing Width(at curb line) 4 feet typical 4 feet typical Minimum Distance from Side Property Line(@ r/w) 5.0' 5.0' Minimum Distance from Crosswalk 5' 5' DE-001:V-1 Page 2 oft