1991, 08-13 Permit: 91004814 Inspect SITE ADDRESS: E 0713 15TH AVE
PROJECT NUMSER: 91004314 - PERMIT TYPES: 3U 9L M=
PERMIT USE: RESIDENCE
DESCRIPTION INSPECTOR CATS RESULT
SETBACKS SILVA , DAVID 08/13/91 APPROVED
FOOTINGS SILVA , DAVID OE/13/91 APPROVED
GAS PIPING VISSIA, RANDY 09/10/91 APPROVED
INSULATION SILVA, DAVID 09/17/91 NO INSPECTION
FRAMING SILVA, DAVID 10/08/91 APPROVED
INSULATION SILVA , DAVID 10/OS/91 APPROVED
FINAL SILVA, DAVID 10/0x/91 CORRECTIONS REQUIRED
FINAL SILVA , DAVID 10/11/91 APPROVED
r
'rt�a, ,
ItA, '� 41 t� I ' iixi, e
S P O K A N E ., �z_., �; ;,P1. C O U N T -i-
DEPARTMENT
DEPARTMENT OF BUILDINGS • A DIVISION OF THE PUBLIC WORKS DEPARTMENT
JAMES L.MANSON,C.B.O.,DIRECTOR DENNIS M.SCOTT,P.E.,DIRECTOR
October 17, 1991
First Federal Savings Bank of Washington
West 201 North River, Suite 350
Spokane, Washington 99201
Attn: Sharon
RE: Residential Occupancy Approval
Dear Sharon:
Please be advised that on October 11, 1991 a final inspection was made and occupancy
approved for the structure listed below:
Address: East 5713 15th Avenue
Property Owner: Shorewood Homes
Contractor: Shorewood Homes
Parcel Number: 23534-0906
Permit#/use: Residence
Should you have any further questions, please contact this office between the hours of 8:00
a.m. and 4:00 p.m., weekdays.
Sincerely,
obin Domitrovich
Secretary
CODE ENFORCEMENT DIVISION
WEST 1303 BROADWAY•SPOKANE,WASHINGTON 99260-0550•(509)456-3675
FAX(509)456-4703
ME CENTRAL PRE—MIX CONCRETE CO.
CORPORATE OFFICE • EAST 5111 BROADWAY • P.O. BOX 3366
SPOKANE, WASHINGTON 99220-3366 • (509) 534-6221
August 22, 1991
SPOKANE COUNTY PUBLIC WORKS
Building & Safety Division
West 1303 Broadway
Spokane, WA 99260-0180
REFERENCE: Shorewood Homes
E. 5713 15th
Radon Rock
Dear Mr. Silvey:
This letter was requested by Arthur S. Erickson, Spokane County Inspection
Supervisor.
On August 15, 1991, 1/2" radon and 3/8" pea gravel was delivered to the above
referenced jobsite by Central Pre-Mix Concrete Co. On August 19, 1991, the
1/2" material placed on top appeared to be "marginal", and Art requested that
I run a sieve test. Results are as follows:
100% Passing 1/2" Sieve
94% Passing 3/8" Sieve
52% Passing 1/4" Sieve
4% Passing #4 Sieve
0.4% Passing #8 Sieve
We feel the 1/2" radon placed on top 4" lift may have been accidently mixed
with the pea gravel placed below. We feel the job will be adequate for radon
abatement as the pea gravel below is approximately 2 - foot thick.
Art gave approval to place concrete, and it was placed the following morning
of August 20, 1991.
Respectfully submitted,
CENT L PRE-MIX CONC E CO.
Craig L. Matteson
Quality Control Technician
/dw
cc: Shorewood Homes
SPOKANE ❑ COEUR D'ALENE ❑ MOSCOW-PULLMAN ❑ TRI-CITIES ❑ YAKIMA ❑ SEATTLE