2001, 04-04 Permit: 01002146 AC C SPOKANE COUNTY DIVISION OF BUILDING AND CODE ENFORCEMENT\
1026 WEST BROADWAY AVENUE . SPOKANE, WA 99260-0050
(509) 477-3675
J
SITE INFORMATION PROJECT INFORMATION l
Site Address: 6102 E 15TH LN Project Number: 01002146 Inv: 1 Issue Date: 4/4/01
Spokane,WA 99206 ermit Use: AIR CONDITIONER
Parcel Number: 35243.1066
Subdivision: BET17v1ANS ADD Applicant: ALLIED HEATING INC
Block: Lot: 10213E BUCKEYE LN
Zoning: UR-3 Urban Residential 3.5 SPOKANE,WA 99206 Phone: (509)928-8252
Contact: ALLIED HEATING INC
Owner: KOZUBENKO,PETER
10213E BUCKEYE LN
Address: 6102 E 15TH
SPOKANE,WA 99206 Phone: (509)928-8252
SPOKANE,WA 99206
Inspector: MARC STRAUB Setbacks-Front: Left: Right: Rear:
Water Dist: UNKNOWN
Group Name:
Project Name:
PERMIT(S)
Mechanical Permit Contractor: ALLIED HEATING INC License#: ALLIEHI001 C5
AIR CONDITIONER:4-15 TONS 1 $20.00 PROCESSING FEE $25.00
Total Permit Fee: $45.00
PAYMENT SUMMARY Page 1 of 1 NOTES J
PERMIT Processed By: CUMMINGS,KATHY
Printed By: WENDEL,GLORIA
Tran Date Receipt# Payment Amt
4/4/01 2051 $45.00
Total Fees AmountPaid AmountOwing
$45.00 $45.00 $0.00 FILE
NOTICE
It is the responsibility of the applicantipermittee, not Spokane County, to see to it that the use described on the front of this permit complies with
applicable codes and requirements and that required inspections are requested. Failure to request required inspections and obtain the necessary
approvals prior to progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the
applicant's/permittee's or property owner's expense.At a minimum,the following inspections ARE REQUIRED by County Code:
1. FOOTING - when forms and reinforcement are in place and prior to placement of concrete—all structures, including manufactured homes.
NOTE: This inspection includes review of the structure's setbacks from property lines. Minimum setbacks are established by County zoning
regulations.Typically, side and rear yard setbacks are measured from property lines, while setbacks for yards abutting streets are measured from
the property line or the center line of the roadway right-of-way,whichever provides the greater setback from the center line of the roadway right-of-
way.Curb lines and fence lines are not necessarily indicative of property lines.In some residential areas,the County can own as much as 20 feet of
right-of-way between your property and the actual improved street/curb.The responsibility to comply with applicable setback provisions lies solely
with the permittee—neither Spokane County nor its authorized representatives assume any responsibility for the verification or location of your
property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the
owner's/permittee's expense.
2.FOUNDATION-when forms and reinforcement are in place and prior to placement of concrete.
3.FRAMING-after all framing, bracing and blocking is in place, and prior to concealing.
4.INSULATION- prior to the installation of drywall.
5. PLUMBING -after rough-in, before covering, and final.
6. MECHANICAL- rough-in of piping, before covering, metal chimneys before concealment, and final.
7. FINAL - when complete and prior to occupancy and/or use. Please provide 24 hours notice. All permits require final inspection.
NOTE:In addition to inspection of the structure,this inspection includes review of site improvements(typically depicted on the approved site plan)
required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants,fire department access,on-site
drainage("208 swales"), road improvements, parking,and landscaping are common requirements of a permit/site plan which must be com-
pleted prior to final approval of a building or issuance of a Certificate of Occupancy.
8.MANUFACTURED HOMES- Final inspection required when complete, stairs, handrails, skirting, etc.installed, and prior to occupancy;completed
inspection record card must be available on site.
In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc., must be
inspected prior to cover. Check with the department for"special inspections"in conjunction with commercial projects.
CALL 477-3675 FOR INSPECTIONS.
TO INSURE PROMPT SERVICE, PLEASE GIVE 24 HOUR NOTICE.
YOUR INSPECTOR IS
UNDER CERTAIN CIRCUMSTANCES, PARTS OF YOUR PROJECT MAY REQUIRE INSPECTIONS FROM OTHER AGENCIES:
• Road cuts for utilities cr driveways, Division of Engineering & Roads • Sewer connection, Division of Utilities
477-3600 477-3604
or State Department of Transportation or City Public Works Department
456-3000 625-6300
• On-site waste disposal system, Spokane Regional Health District • Electrical wiring, State Department of Labor and Industries
324-1560 324-2640
• Construction in a flood plain, Division of Engineering & Roads
477-3600
PERMIT EXPIRATION AND REFUNDS
Unless otherwise noted,this permit will be considered null and void by limitation if the work authorized by the permit is not commenced or is stopped
for a period of 180 days, unless a written request for an extension of the permit is received and approved by the Building Official prior to expiration.At
a minimum an inspection should be requested at least once every 180 days to assure the validity of the permit.A permit may be renewed within one
year of the date of expiration for one-half the original fee, subject to certain limitations—please call us if you have any questions.
All refund requests must be made in writing by the applicant/permittee(shown on the reverse)no later than 180 days after the date of fee payment.
Refunds of not more than 80%of the permit fee paid may be authorized when no work has been done under the permit.No refunds may be authorized
more than 180 days after fee payment.
MISTAKE?
If you think we've made an error in processing this permit or in conducting inspections pertaining to it, or find erroneous information in the permit,
please bring it to our attention immediately by filing a written request for correction within 10 working days of discovery.All such requests should be
directed to the Division of Building and Code Enforcement at the address found on the face of this permit.
I certify that I am the owner or am authorized by the owner to make this application and that I have examined this permit/application,state that the
information contained in it and submitted by me or my agent to compile said permit/application is true and correct, and authorize Spokane County
to proceed with processing. In addition, I have read and understand the INSPECTION REQUIREMENTS/NOTICE provisions included herein and
agree to comply with same.All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not.
I understand that the issuance of this permit/application and any subsequent inspection approvals or Certificates of Occupancy shall not be
construed to give authority to violate or cancel the provisions of any state or local law regulating construction or agreement concerning this
property, or as a warranty of conformance with the provisions of any state or local laws regulating construction.
SIGNATURE OF
APPLICANT/PERMITTEE APPLICATION
`OR AUTHORIZED AGENT — -- _.___-_ DATE
04-12-2001 09:05AM FROM ALLIED HEATING TO Spokane County P.02
••*WOMB cowry.DIVISION Q1,B_U•II• ING AND COD R 1 1
• . • - •' 10�"9B6'r•BB+oADWAY A :•SFOJ iWA•9926p-0050o- . :. :
J:•',`•. r ., •• _.•. •^•.1.: '•.-. , ` - • •• - . (504773675. • • . .•• • • - •••�.• .r'• •_ •
•.'••.S•
\\\\
gileAdaresk 6102 EMI!LN P!ojeet Number: 01002146 loon 1 Latta Datc 41
Spy wa 99205 Os=A RCM:
Parcel Ntoobear: 351243.1066 .
Stbdiviviax BETI74 N'SAI]D Appaaatit AU.T IMATDNiINC
Hiatt Lt 10213 E BUCR84BLN
TAnbip UR-3 kbeoa35 _ .SPOKANE,WA 99206 fie:(S09) 2
O
KOZUBP KQ PETEL _ - Cs�tcC ALLI�IiFAT INC
Add 6102E HMI Iliac10213 E BUCKEYE LN -
' WA 49206 SPOKANE,WA 99206 c (S09)42842$2
: MARC IMAMeft-Prate Leet R Bow:
Watmblt UNKNOWN
Grins Mama
Projscinam ••
Mathenfrai" •C Came: AILIEDBEATING]NC • Ii-!u : ALI o¢05
AIL cONDITKIG R A4S TOM 1 'S20A0 PECC$CS.RNGF app -
• • Told Feer Beef SUM
. AMOUNT TO REFUND:
- AIR CONDITIONER, 4-15 TON $20.00
e7)\9_0../W)__, C �\�.�.�, - . :20% _ 4.00
- • 80%_ $16.00
(221007) .
ei\gLka e_Clj .." '
. ..---\., ,., )0./Nr\ A ki,Th ,
:ik
c,N0 _,30._73. .. .Q.f..tir-.)
- -. - - - - cae_.@ , .
. -
•
.,.
. ... - -
%.0v,
• . .. --,_„..„) ,. .-. .
. .
PaYI► • BABY 1 of 1 )
N4 .
LAl'Y ____ By: MAIMS,EATEY (1 R -
- .Pstaied By: Cd1II
WEND/31, - .
44 2051 M.5.130 •
- e 4
5+
• $45.00- 5.00 $0.00 / �
04-12-2001 08:5681 509 477 4703 P.02
T(ITAI P.112
Project Receipt Summary Tuesday,Apri117,2001 Page l of 1
Address 6102 E 15TH LN PROJECT#: 01002146
SPOKANE WA 99206
Owners Name: KOZUBENKO,PETER Phone: (509)000-0000
Address: 6102 E 15TH
SPOKANE,WA 99206
Occupant: Phone:
Applicant: ALLIED HEATING INC Phone: (509)928-8252
Use: AIR CONDITIONER**CANCELLED 4/17/01 PAP**
Application Date: 4/4/2001 Permit Issue Date: 4/4/2001
Receipt Nbr: 2051 Transaction Date/Time: 4/4/2001 12:53:16 PM
5476750000005144 03/02
Acct Account Transaction
Description Total Due Amount Paid
00410 MECHANICAL PMTS P $45.00 $45.00
$45.00 $45.00
Receipt Nbr: 2492 Transaction Date/Time: 4/17/2001 2:34:10 PM
b#10144;b#017
Acct Account Transaction
Description Total Due Amount Paid
00410 MECHANICAL PMTS D $0.00 $16.00
A MOUNT REFUNDED $0.00 ($16.00)
Refunds
-: .. AipeYSS
Xypt:d Rdupd ._
. {{ --- Lira 3 _In tK
$e0 1 t -a./ed.'4zt-dma:e
TM.•rwv 4
eesir,b l;efi�od d 57d mf itmrwro .: ...:. ... .. Wwy.W pe,w'd ION.y tt t .. MMM {-Brit $qi_'
flS.d Tqe _ .... :>e..&4O. - ....t n b NI.t( pn•+Y,6aLpC:� N at:et
-l'YeoNae #•'C,eddt.rd ford Type MmeeeC d
'44" Rebad Rekrnd
piN Ae eud AneMn fPr lnfoi i h,.., ..o..m .. - -
8sYk8 3 ur lc s r i {T r..d..
N: G.S.Yl:ll•Yt:; .t.J i.:(ti• ...L. .00.0 31.W :_ ._ ': : .
...riMk?a Im av:7.v. tlrndN -,, (.::•� 7
•
KN f'Wart If1AOC]
IrWYayrh .714 W
121" 7
Aafn.4.,d :1;.roj: 7
.. .: 71aIWa n r..4..n• .
: Total flduded 4 6 O0 : �[cOOf::
•
Rnenir
Ux l 61110111:611017 fpim66 Dale-01120(112• 71 .b,7 O•A
.
-. Rzene App11cara Car_eOed rop .. :- :�:- getI `wr 15 .
t
044
S P O K A N E .4::-,M716,,,,v1.14,._,' :- 4, C O U N T
BUILDING AND CODE ENFORCEMENT A DIVISION OF THE PUBLIC WORKS DEPARTMENT
James L.Manson,C.B.O., Director Gary Oberg, Director
4/12/2001
ALLIED HEATING INC
ATTEN ACCTS PAYABLE
10213 E BUCKEYE LN
SPOKANE WA 99206
RE: Refunding of the Processing Fee
To Whom it May Concern:
As you may be aware, Section 107.6 of the Uniform Building Code allows for up to 80%
of permit fees to be refunded if no work has been done and the request is received in
writing within 180 days of permit fee payment.
This notice is to inform you that in accordance with the provisions of Section 3.08.010 of
the Spokane County Code, processing fees associated with plumbing and mechanical
permits will no longer be refundable. The section states that:
..."Fees, other than processing fees, for permits issued pursuant to this title may be
refundable pursuant to Section 107.6 of the Uniform Building Code. (Res. 96-0744
Attachment A(part), 1996; Res. 92-1518 (part), 1992: Res. 90-0415 Attachment A(part),
1990)"
The refund percentage will be applied to the remainder of the fees paid. If you have any
questions or need further information, please don't hesitate to contact me.
Sincerely, -1
/r
Patty Poigie
Accounting Tech
Div. of Bldg & Code Enforcement
1026 W. BROADWAY • SPOKANE, WASHINGTON 99260-0050
PHONE: (509)477-3675 • FAX: (509)477-4703 • TDD: (509)477-7133