Loading...
2009, 07-28 Permit App: 09002291 Trusses, Re-Roof Project Number: 09002291 thy: 1 Application Date: 7/28/2009 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: REPLACE GARAGE TRUSSES/HEADER/REROOF Contact: ROBERT DAVIS Address: 4124 E 37TH AVE C-S-Z: SPOKANE WA 99223 Setbacks:Front Left: Right: Rear: Phone: (509)448-9195 Group Name: Site Information Project Name: Plat Key: 000375 Name: CHESTER TERRACE District: Sout Parcel Number: 45291.1202 Block: Lot: SiteAddress: 10122 E 19TH AVE Owner:Name: COWGER,DANIEL&CERISSA Address: 10122 E 19TH AVE Location::CSV SPOKANE VALLEY,WA 99206 Zoning: R-2 SF Res Suburban District Water District: 101 SPO CO WATER DIST#3B Hold: Area: 12,500 Sq Ft Width: 0 Depth: 0 Right Of Way(ft): 0 Nbr of Bldgs: 1 Nbr of Dwellings: 1 Review Information: __.0 �;, Review Building Plan Review Released By: Originally Released: 7/28/2009 By: TMELBOU Permits: Building Permit Contractor: DAVIS CARPENTRY Firm: DAVIS CARPENTRY Address: 4124 E 37TH AVE Phone: (509)448-9195 SPOKANE,WA 99223 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation GARAGE U-1 VB REPAIR 0 $12,500.00 0 $12,500.00 TRUSSES/H EADER Totals: 0 $12,500.00 0 $12,500.00 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE l SELECT $223.25 WSBCC SURCHARGE 1 SELECT $4.50 SF PLNS RVW<7999 SQ FT l SELECT $89.30 Permit Total Fees: $317.05 Operator: jmm Printed By: jmm Print Date: 7/28/2009 Project Number: 09002291 Inv: 1 Application Date: 7/28/2009 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Payment Summary: Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $317.05 $317.05 $89.30 $227.75 $317.05 $317.05 $89.30 $227.75 Disclaimer: Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: jmm Print Date: 7/28/2009 Permit Center 11703 E Sprague Ave, S to B-3 % L,�F PERMIT NUMBER: Spokane Spokane Valley,WA 99206 - PERMIT FEE: jValley (509)688-0036 FAX: (509)688 A i 1 UU www.spokanevalley.org Community Development BY Residential Construction New Construction Accessory Bldg Permit Application Addition/Remodel Deck Other: SITE ADDRESS: / 0 / L L C / 9 O v e_ ASSESSORS PARCEL NO: LEGAL DESCRIPTION: Building Owner: Contractor: Name: /� r, c ,ti V- Name: R Q be., 4- q J 5 Address: 0 s 2L L t /9 A A ✓ e Address: '//2-ti 371-4 /Q V -e City: se fie« e VI(e State: l4_)q Zip:”z City: jo e �C State:L�lr1 Zip:S 5 L i 3 Phone: Fax: Phone: -24/ - j 0 L Fax: L) 2./3 ` / Z €, Contracto Lic No: Exp Date: Z `f D/nL /sC.i 913C7 Contact Person City Business Lic.No: Name: Rc e ,- I ce 1 /.S Phone: c`? c/ C / O Z Describe the scope of work in detail: Cost of Project: $ f v c, ge /ete e (-et 7-.15 Q 1-Lis$ ' 5 /j/ der- ci�.r� � � i�Oc -(7 1.i Proposed Use: **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK: DIMENSIONS: #OF STORIES: TOTAL HABITABLE SPACE: MAIN FLOOR TO SQ. 2Nu FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE FTG: AREA: FINISHED BASEMENT GARAGE SQ. FTG: DECK/COV. PATIO SQ. FTG: 30% SLOPES ON SQ. FTG: PROPERTY: #OF BEDROOMS: CONSTRUCTION TYPE: HEAT SOURCE: SEWER OR SEPTIC? The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling,the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal,state or local laws,codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. SIGNATURE: DATE: 2-> 4 � Method of Payment: 0 Cash 0 Check ❑ Mastercard 0 VISA Bankcard#: Expires: VIN#: Authorized Signature: REVISED 2/15/07 4%ftitte,„, • Project New project Prezious pre-app meeting ne Transmittal — Plan rezasions City of Spokane Valley Transmittal Date: 400111110 Valley Community Development Tuesday,July 28,2009 Department 11703 E.Sprague Ave,Suite B3 Spokane Valley,WA 99206 Phone:509.688.0036 Site Address: 10122 E 19TH AVE Project Number: 09002291 Parcel Number: 45291.1202 Zoning: R-2 Water District: SPO CO WATER DIST#3B Fire District: FD 01 Applicant: ROBERT DAVIS Owner: COWGER, DANIEL & CERISSA 4124 E 37TH AVE 10122 E 19TH AVE SPOKANE WA 99223 SPOKANE VALLEY, WA 99206 (509) 448-9195 e-mail: e-mail: Contact: ROBERT DAVIS Occupant: 4124 E 37TH AVE SPOKANE WA 99223 e-mail: (509) 448-9195 e-mail: Contractor: DAVIS CARPENTRY Arch/Engineer 4124 E 37TH AVE SPOKANE, WA 99223 (509)448-9195 e-mail: i in i I " Project REPLACE GARAGE TRUSSES/HEADER/REROOF Description: Building Landuse Engineer Utilities Health Fire Dist Assessor APPLICATION CONSTRUCTION PLANS s TDS Please send all plan review and project comments via e-mail to the highlighted individuals. • For City Use Only sookane PLUS Project Number / ter' �Project Address !, ) %4000 a €vy. 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is /' The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure,you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone,fax, email,or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE-APPLICANT PINK-BUILDING FILE REV 9/07