Loading...
2008, 01-28 Permit App: 08000235 Carport ' Project Number: 08000235 Inv: 1 Application Date: 1/28/2008 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: . = ,...� -,.,. ...,. .,,uisk@m .x="., .....aa: .. :,,, w: . •>.,a:-;vasa uam . ? :,�v -.aa __ ... _ Permit Use: NEW ATTACHED CARPORT 15 X 20 Contact: BISHOP,JERRY Address: 10521 E 15TH AVE C-S-Z: SPOKANE VALLEY,WA 99206 Setbacks:Front Left: Right: Rear: Phone: (509)927-8576 Group Name: Site Information: Project Name: ,..,. „***., :..: n*Y: -�..m`.:. n:, - .tea ,: . "#a:.-�... "'�.:' _ . ,.� •? ..:: ��..�_w r�=.:� _-.. Plat Key: 002704 Name: UNIVERSITY PLACE District: Sout Parcel Number: 452043349 Block: Lot: SiteAddress: 10521 E 15TH AVE Owner:Name: BISHOP,JERRY Address: 10521 E 15TH AVE Location::CSV SPOKANE VALLEY,WA 99206 Zoning: R-3 SF Res District Water District: 101 SPO CO WATER DIST#3B Hold: ❑ Area: .00 Acres Width: 0 Depth: 0 Right Of Way(ft): 0 Nbr of Bldgs: 1 Nbr of Dwellings: 1 Review Information: . , VAP. .. - - .. `"--'46WV M x: _ . . _ . .._ Review Building Plan Review Released By. Originally Released: 1/25/2008 By: t `. 1 ourn III Landuse/Zoning/HE Conditions e ; ink 'elk Ori:' lyRel se 5/2008 By: cjjanssen Permits: _ 5 . A M._ . :twtxral . : _ '-Z,==,1"="'"..‘,51.%8==.... V . .. ... ..u. Operator: jmm Printed By: JD Print Date: 1/28/2008 ' Project Number: 08000235 Inv: 1 Application Date: 1/28/2008 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Building Permit Contractor: OWNER Firm: OWNER Phone: (000)000-0000 This Application: Total Project: Description Grp Type Notes Su Ft Valuation Sq Ft Valuation CARPORT OP R-3 VB CARPORT- 300 $4,500.00 300 $4,500.00 ATTACHED Totals: 300 $4,500.00 300 $4,500.00 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $111.25 WSBC SURCHARGE 1 SELECT $4.50 SF PLNS RVW<7999 SQ FT 1 SELECT $44.50 Permit Total Fees: $160.25 Notes: a.a144,...a _. ,. f .. ::.,.. Payment Summary: xw, . . .,... _ 4.4 ,S4 :4:1,m ,. Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $160.25 $160.25 $0.00 $160.25 $160.25 $160.25 $0.00 $160.25 Disclaimer: Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: JD Print Date: 1/28/2008 Permit Center Scm of 11703 E Sprague Ave, Suite B-3 PERMIT NUMBER: t:, pokane Spokane Valley,WA 99206 r jValle (509)688-0036 FAX:(SQ9)g8 1PERMIT FEE: J www.spokanevalley:osgp,NE.VA"-�- Y Community Development '' ' St Residential Construction app 4 1 Jw Construction Accessory Bldg Permit Application ,t, Mtv • •- ' emodel Deck r It Other: C%cx,010 r`7' SITE ADDRESS: 1 ISS Z l 15 41 a '-`€ 5 1(', l)c2 (1 ey L) G , ASSESSORS PARCEL NO: LEGAL DESCRIPTION: Building Owner: Contractor: c ( Name: \,err ' !hop Name: Address: �. —h Address: �. 1O,r �� � .S i C�,U� City-5p), ' C,1 U. State ct Zip c���� City: State: Zip: Phone: g. Fax:w Phone: Fax: oct Contractor Lic No: Exp Date: Contact Person City Business Lic.No: Name: .3--,,e f L 1 f7 Phone: 7 ,?c —,.57--57 .6 Describe the scope of work in detail: Cost of Project: $ms_ `` l OCD of 114'41 el Ca_rvoL)!`' ii- Proposed Use: p �1 c i?„, (,u n r- y erg, **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK: DIMENSI S: #OF STORIES: TOTAL HABITABLE SPACE: li / [ 20 '' 1 MAIN FLOOR TO SQ. 2"" FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE FTG: AREA: FINISHED BASEMENT GARA SQ. FTG: DECK/COV. PATIO SQ. FTG: 30% SLOPES ON SQ. FTG: 5o 0 SF PROPERTY: #OF BEDROOMS: CONSTRUCTION TYPE: HEAT SOURCE: SEWER OR SEPTIC? The permitee verifies,acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling,the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the.City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal,state or local laws,codes or ordinances.6) Plans or additional information may be required to be submitted,and subsequently approved before this application can be pro ssed. SIGNATURE: DATE: f/?5/C r Method of Paym t: 0 Cash 0 Check 0 Mastercard 0 VISA Bankcard#: Expires: VIN#: Authorized Signature: REVISED 2/15/07 SCITYOF11 pokane Valley® 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ cityhall®spokanevalley.org Residential Plan Submittal Minimums ❑ Completed Building & Mechanical application with: Accurate address, Parcel Number and/or Legal Description, description of work, owner and contractor information, signature, and date. ❑ Two sets of plans including Site Plan, elevations, floor plans, foundation plans With details, roof plan, framing plans & details. ❑ Show the height of any proposed buildings or accessory structures. O Floor plan for each floor: Dimension to scale (minimum 1/8") and label each Room (including sq. footage of house and garage on plans) Show each level of existing house and square footage of any additions. ❑ All braced wall panel types: show locations and details of installation, including engineered design. ❑ Egress windows: Provide at least one window or exterior door approved for Emergency escape or rescue from a basement and in every room for sleeping. O Smoke detector locations ❑ 22" X 30" attic access location ❑ 18" X 24" crawl space access: ❑ One-hour separation detail: between house and garage ❑ Floor framing details: Joist type, size, spacing and installation details ❑ Roof framing plan and details ❑ Furnace and hot water heater location. ❑ All header locations: type, size, and connections ❑ Foundation plan O Insulation information Project Newproject . CTT! New pre-app meeting ❑ pox.aneOrkad."NETransmittal Plan revisions ❑ Ll .0000Valley City of Spokane Valley Transmittal Date: Community Development Friday,January 25,2008 Department 11703 E.Sprague Ave,Suite B3 Spokane Valley,WA 99206 Phone:509.688.0036 Site Address: 10521 E 15TH AVE Project Number: 08000235 Parcel Number: 45204.3349 Zoning: R-3 Water District: SPO CO WATER DIST#3B Fire District: FD 01 Applicant: BISHOP, JERRY Owner: BISHOP. JERRY 10521 E 15TH AVE 10521 E 15TH AVE SPOKANE VALLEY, WA 99206 SPOKANE VALLEY, WA 99206 (509) 927-8576 e-mail: e-mail: Contact: BISHOP, JERRY Occupant: 10521 E 15TH AVE SPOKANE VALLEY, WA 99206 e-mail: (509) 927-8576 e-mail: LD<) [E (L 1E_ LI \\'/ I Th) f; Contractor: OWNER Arch/Engineer: aI j ( ) - 0 I � e-mail: 11_--)r illi !I 11 II 11 1' I\11 \�_-,'' Project NEW ATTACHED CARPORT 15 X 20 Description: Building Landuse Engineer Utilities Health Fire Dist Assessor CONSTRUCTION PLANE ;2 SITE PLAN / APPLICATION , TDS / Please send all plan review and project comments via e-mail to the highlighted individuals. 01\41% SAM 4, Valley 8 FOR INSPECTIONS CALL 509-688-0054 YOUR BUILDING INSPECTOR IS: EAST AREA PRESS 1 gOUTHAREA PRESS 2 NORTH AREA PRESS 3 THIS CARD MUST BE POSTED ON JOB SITE COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION INSPECTION RECORD 11703 E.Srague Ave,B-3 Job Address (( F Mtijk° 1t41A.. Spokane Valley,WA 99216 Inspection request line(509)688-0054 PERMIT NO: OZJ> ********THIS CARD,PERMIT AND APPROVED PLANS SHALL BE ON JOB SITE AT ALL TIMES******* DATE INSPECTOR DATE INSPECTOR SETBACKS WATER PIPING FOOTINGS DRAIN/WASTE/VENT REINFORCEMENT INSULATION UNDERGROUND FIREWALL/GWB RADON FIRE PROTECTION SYSTEM FRAMING HVAC SYSTEM GAS PIPING FINAL BUILDING DUCT WORK FIRE .SI( 1— � p` 1 ct k---\k---\ -o c- E , 1 c.05 2-1 l 5 r 1- c•tx) c o \ tr- ' v1 Sr „ ► GJ ► o ( I' �4 ;` li'Lr 3 7 tA"e • l i \ , 1 i et 1( 3 7 L-------- Prix ? ,/ \ 'Iercy Ii .�`5 7 V ---? _/3 Pc r. .11 ( i ` W �jl j� 2._o f - I 1 ICC. Iew r o Ifs 1 „ix4 \- 1 L.„,.ct f•N pu_.j ._..) ,,,Th a. z lets ,iJ r Z Lll 2 a • 1— ...i,\ecj m 0 C {rf r r 1 Y .s.( i-- p ---\(ci_ i,, Por 1052- 1, c u e l 0 43R.j` t v\ S 1 c Sr lic' cr 3 7 ' • ZS . 37 q Px 1 ,,o rck. I .. t cp. tI i,-f'9 —( JP tib` Y P a (-J 1 1I1 '� _ r 1 2-o ---ted I r , s. ' loco iii, ..:(...._rI 3z' tiPr v ( i ° qpncie il ' ' . s. r-eA L° Y, e .45s-o, s4 P&p _ . - - j f 3 R .. , i •e �� f I J 1 E M rN Fe( -- I p � • . : • ,50 S�n „n vx SP "r' (1 YIZ ll 116 t-tk eC( . h seo�-" � 4--4z,;/. ,Qv( TS � UL, ,4 SPAN F4- ��� 1,K 2..crW FLovS4,N c.P C, ---a..4.1 N I E S i s 1 1 f E i 1 i i i 'f I i I n �0� ��((If iF vi P�V'e �!lN 1 t ,- � Zi1 d � 1 ii ii\ r `� � ZL+�� min pourer \ n PIKE ;tA, � ' r 0 Q 6 0 4, _..._. 1 3 / ,--____> itd2 i y S li q 0 1_ /pr I e o a. S� /SL o /�i/c�.. Q�-c�a�ct,Q .S 2 g L-tt, N � 1 f _ Roofing material L` .1.i Sheathing . ,i Rafter size x See ; spacing details _ my �, 2x blocking Beam size x House _ 1"9. 14ft maximum wall Post size x (4 x 4 minimum) spacing (6 x 6 recommended) T �-- Pre-engineered bracket �'` DE.5 IGNED Foe uPL I FT 121" minimum depth 18" minimum width / /` -, Existing ` x 1 ! rafters Continuous 2x ledger Existing anchor bylagscrews wall 2x blocking --. -, Ay f Approved hanger —*up= 1111404pNew \ / rafter Ne rafter to Existing iiA existing bearing ' wall 1 Tv > co oc l n(7) 1.13. .0 PROVIDE DIAGRAMS AND ENGINEERING LAYOUTS FOR ROOF TRUSSES, BEAMS AND FLOOR SYSTEMS PRIOR TO FRAMING INSPECTIONS THESE PLANS MUST BE KEPT ON THE JOB SITE I m a' THIS BUILDING SUBJECT co TO FIELD INSPECTION CORRECTIONS \)/N REVIEWED 1-tO R CODE COMPLIANCE SPOKANE VALLEY o' DIN DIVISION IM 1 L. 0 , . For City Use Only CITY OF ry4- PLUS Project Number po1aneProject Address a Q B 11703 E Sprague Ave Suite -3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is //c..?"/) F) The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. > Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure,you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone,fax, email,or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE-APPLICANT PINK-BUILDING FILE REV 9/07