Loading...
sp-1075hDEDICATION Spokane County to incrucie 'Ene opove uetturiuvu y1vFvl ill lisirl-'r- ... ­- ­­ ­ (RID)and to support the formation of a RID for Improvement of the road descnibed below I ­ and/or sewer system. Tracts 1, 2, and 3, and Consoliclatecs irrigation U115VICI No- I ZT* times hereinafter, at their own cost and expense, may con'T01 WILTI kilt; rc4u1lT1_1`-1" w by requesting and authorizing Spokane County to place their names on a petition for the Chapter 36. 88.050, a r by ssigns at all there successors and a I ees that may interfere with the constructing, remove all crops, brush, gross or tr formation� of a Rood Improvement District (RID) pursuant to be' requesting and authorizing Spokane County to cost their ballot In favor of a RID Ing # installing, operating maintaining, repairing, altering, replacing, removing and all other be related to a sewer system. The grantor (s) reserves the Patrick J. Moore, PLS formed under the resolution method pursuant to Chapter 36.88.030, and/by not filing a uses or purposes which are may right to use and enjoy that property which is the subject of this easement for purposes Certificate Number 18091 petition against the formation of a RID being formed under the alternative resolution which will not 'Interfere with the their full enjoyme nt of the rights hereby granted; method provided for in RCW 36.88.065 and Chapter 35.43 RCW. b 'ld*ng or other structure or ided, the grantor (s) shall not erect or construct any ui I provi If a RID is proposed for Improvement of the road described below sold ownerks) a nd drill on the easement, or diminish or substantially add to the ground cover over t he described herein above'Is to and shot I run with the land. SPOKANE COUNTY DIVISION OF UTILITIES successor(s) further agree: (1) that the improvements or construction contemplated within easement. The eosemen" 19-- the proposed RID is feasible; (2) that the benefits to be derived from the formation of Each new unit shall be double plumbed for connection to future areo-wide collection Examined and approved this day of the RID by the property Included therein, together with the amount of any County I the RID; and (3) that the systems. At such time a future area-wide collection system is constructed within Sprague cipation, exceed the cost and expense of formation of porti d; provided, themselves, their within the proposed RID is sufficiently develope Avenue each lot will be required to establish a connection to said collection system at, lot at the time connection is being made. property heirs, grantees, assigns and successor(s% shall retain the night, as authorized under RCW 1 property the sole expense of the current owner Director, Spokane County Utilities 36.88.090, to object to any ossessry on the as a result of the improvements. RID by or resolution Subject to specific' opplic:3tion approval and issuance of permits by the Health Officer, called for In conjunction with the formation of an either petition Chapter 36.88 RCW, and t appeal to the Superior Court the decision of the the use of individual on-site sewage systems may be authorized. SPOKANE COUNTY ENGINEER method under Board of County Commissioners confirming the final assessment roll; provided further, it, long as they I Use of Private wells and water system Is prohibited. The public water system, pursuant to 19 is recognized that actual asse ssments may vary from assessment estimate so true fair value improvements add(s) to or* ies, the local fire protection the water plan approved by County and state health outh it this Examined and approved this_doy of do not exceed a figure equal to the increased and district, County Division cf Buildings and water purveyor, shall be installed within the property. ome stic water serv* subdivision and the opplit.ant shall provide for individual d ice, as we it is further acknowledged and agreed that at such time as a RID is ore oted or any 'County as fire protection, to each tract prior to sole of each tract and prior to issuance of a # building permit for each tract. Spokane County Engineer Rood Improvements Project is authorized by Sp okone County, the improvements required shall J be at the sole expense of the owner(s) of property within the RID or served by the improvements without any monetary participation by Spokane County. The RID waiver A ten foot (10') wide uti easement shown on,the herein described plot are hereby to the u tility companies for the construction, reco ristruction, SPOKANE COUNTY D IVISION OF BUILDING AND PLANNING contained in this agreement shall expire after ten (10) years from the date of execution dedicated serving I I Together with the right to inspect said maintenance and operoticn of utilities. below. This provision is applicable to Sprague Avenue, I utilities, trim, and/or remove brush and trees which may Interfere with the construction, Examined and approved this day of 119 ..... The Border Easement as shown hereon is hereby granted to Spokane County and its authorized maintenance and operaticri of some. including but not limited to curbs, agents, and to the public for rood purposes, i by the Spokane County IN WITNESS WHEREOF, th� aforesaid owners hove hereunto set their hand this ---- day of sidewalks, drainage, signoge, and other usage deemed necessary Engineer for the safety and welfare of the Public. No fence or portion thereof will be - - - - - - - - - - - - - - - - - - Director, Division of Building and Planning constructed within said easement without permission of the Spokane Cou nty Engineer, nor e sight distance will any objects be placed in said easement that would obstruct th I for safe and efficient vehicular movern nt. A ny other easemcnts granted or - - - - - - - - - - - - - - - - - ----- - - - - - - - - - - - - - - - - - - - - - - - - - - SUSAN P. OLSON SPOKANE COUNTY HEALTH DISTRICT ne cessar y dedicated within this Border easement area will be subordinate to the rights created by VERNON K OLSON 19—. this easement and are subject to the Spokane County Engineers permit process prior to Examined and approved this—d ay of usage. NORWEST, MORTGAGE, INC. The property owners within this plot shall be held responsible for keeping open and n-mode dro' flow over and across maintaining the surface path of natural or ma inoge BY for Spokane County Health Officer to their respective properties. If the property owners foil maintain the surface path or man-made drainage flow or the drainage swale, a notice of such failure - -------------------------- of natural I may be given to the property owners. If not corrected within the period indicated on ITS: — - - - - - - - - - - — - - - - — - - - SPOKANE COUNTY ASSESSOR sold notice, Spokane County has the right to correct the maintenance failure, or have it ACKNOWLEDGMENTS corrected, at the expense of the property owner. Examined and approved this day of Any natural drainage channels, creeks with Intermittent or constant flow, or well-defined STATE OF WASHINGTON ss natural draws periodically subject to concentrated flow of storm water, shall be placed I I onstructed within an easement to Spokane County. No buildings shall be c County of Spokane Deputy within granted the easement, and no fill placed within the easement without the expressed written consent I certify that I know or that I have satisfactory evidence that VERNON K. OLSON and SUSAN Spokane County Assessor by ffic'ent width to encompass of the Spokane County Engineer. The easement shall be of su 1 1 se shall the but P. OLSON, husband and wife are the persons who appeared before me, and said persons the storm water flow width and allow for emergency maintenance, in no ca 'in t acknowledged that they signed this instrurnent, on oath stated that they were ou horized to easement, be less' than 10 ft. width. execute the Instrument and acknowledged it as their free a nd voluntary act and deed, for SPOKANE COUNTY TREASURER The property owner or authorized representativ e shall Inform each succeeding purchaser of on the and their responsibility for maintaining surface the uses and purposes stated in the instrument. 1 do hereby certify that oil taxes which have been levied and become chargeable oil drainage easements property drainage paths and swales within sold easements. DATED this day of - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - i hin this map have been fully paid this day of against the land shown wit 19 Any building that is constructed on a lot in this plot shall be set at such an elevation I so as to provide positive drainage away from any drainage entry point to the building - - - - - - - - - - - - - (incluicltrI3 but not limited to a window well, a window unprotected by a window well, or a I I f the - - - - - - - - - — - - - - NOTARY PUBLIC in, and for the State of So. o f 3% away rom d, id positive drainage shall consist of a minimum slope shall be graded 10 feet from the building. The lots Washington, residing at Spokane Spokane County Treasurer by Deputy building for a distance of at least so that either (a) all runoff is routed away from the building, and conveyed over the lot M commission expires - - - - - - - - - I V, or (b) drainage Intercepted on to a natural drainage swole or approved drainage focilit the lot is disposed of on the lot in an approved drainage facility. The approved drainage facility shall be constructed in accordance with any applicable accepted plans on file at vr RE! P� i-u ice. Any revisions to the accepted drainage plans must be the County Engineer's Off STATE OF WASHINGTON )ss accepted by the County Engineerfs Office prior to construction of sold revisions. County of Spokane J! 22' 7 it 1 11 rea (ASA). Treatment of storm This short plot is located wi hin the Aquifer Sensitive A ided. The method of treatment is to have ay o f before me, the undersigned, a Notary On this ____ d .............. 19 to me PINAL *r IN A Is V LAT runoff from driveways shall be pro vi preferred the runoff from driveways sheet flow over lawn turf or native-type gras ses. It a ditch Public in and for the Stote of Washington, personally appeared - - - - - - - - - - - - - - - NORWEST, MORTGAGE, INC., a Washington Corporation, that is to be used t collect runoff from dniveways, then the ditch is to be gross -lined. known to be the of *thin and ristrument, and acknowledged the said Instrument to be executed the wi oregoing I U` F The fifteen foot (15') wide Private Dri d Hammerhead turnaround easement, as iveway on "27, "S". Su t , RIVATE id corporation, for the u ses and purposes therein the free and voluntary act and deed of sat mentioned, and on oath stated that -he is authorized to execute th e said instrument and LAT "75-96 S H 0" R"ift V As 1" and at platted and shown hereon, is granted to Troc, e A 99 �uncler ft that the seal affixed (if any) is the corporation se ol of said corporation. V , ,,� DRIVEWAY AND DRAINAGE COVENANTS as'recorded - - - - - - W01 and mode a port of.� A n. lost above writte' N. -r U a. I U UP' seal `F L`T `BBAX V Auditor's Document No. Given under my hand and official seal the day and year t3ft -- ------------- State of R U`r T 0' G E E 1) 1 71' % N N A U R E �S) -- ---- -- I ------ I_— INLAND in and for the Washington, residing at Spokane U U 1/4 UP' m commission expires - - - - - "'HE S _rTHEAS1 LU'0% C RAr""E D IN I - - - - - - PACIFIC Nr 5 SEUT UN 18) 1.25 RA E. W.M. NGINEERING ]844 29 IL 10"k Ir �r.& Iry ri N IN I Sir P' k C Jw I U N E C U U 111'" 0 707 West 7th Suite 200 (509) 4458-6840 S E L F 0) 4 S 99204 FAX: (509) 458%844 pokone, WA (509 -- - --- -----------------