2013, 07-12 Permit: ROW-2013-0346 Pavement CutCity of Spokane Valley
Community Development
11703 E. Sprague Ave., Suite B-3
Spokane Valley, WA 99206
(509) 720-5240
permitcenter rx spokanevalley.orq
ROW -2013-0346 DE -ROW
PROJECT NAME: ELLIOTT ADDITION TO VERA - SUB -04-09 ISSUED: 07/12/2013
SITE ADDRESS: 15122 E 4TH AVE SPOKANE VALLEY EXPIRES:
PROJECT DESCRIPTION: ASPHALT CUT ON 4TH FOR UTILITIES TO NEW DEVELOPMENT
PARCEL: 45231.1510
APPLICANT: WM WINKLER CO OWNER: ELLIOTT, BRENT L
1822 E FAIRVIEW AVE SPOKANE, WA 99207 3306 W BRUCE
509-489-6100 SPOKANE, WA 99208
GENERAL CONTRACTOR: WM WINKLER CO License: WMWINC*935LA
1822 E FAIRVIEW AVE Expires: 03/23/2015
SPOKANE, WA 99207
509489-6100
Eng site visit/progress inspection
FEES: Paid Due
Right of Way $168.00 $0.00
Right of Way Traffic Plan $61.00 $0.00
Review
REQUIRED INSPECTIONS
X9117 001►K
Final Acceptance
Totals : $229.00 $0.00
* For pavement cuts, as -built drawings (using the current Regional Pavement Cut Policy template) are required to be
submitted to the Right -of -Way Inspector, Scott Wallace, within 15 working days of work being completed. As-builts shall be
submitted by email (to swallace@spokanevalley.org), by Fax (509-921-1008) or by dropping off at the Permit Center.
* The traffic plan submitted has been approved for concept only. The contractor is responsible for determining specific
signage and layout as required by the MUTCD, WSDOT specs and WA ST mod to the MUTCD. All devices shall conform to
the MUTCD and WSDOT specs.
* The contractor shall notify Carolbelle Branch, Public Information Officer, at 509.720.5411 or cbranch@spokanevalley.org
within 24 hours of receiving this approval. She will notify the newspaper, school districts, Spokane Valley Police
Department, or fire dispatch as necessary. The contractor must provide the location of the work, expected start and end
dates, and dates and times of any road closures or delays.
* The City of Spokane Valley may request changes as warranted by traffic conditions and motorist behavior.
* See handwritten modifications on your submitted plan.
Printed by: Heather Morris on: 07/12/2013 12:56 PM
Page 1 of 2
"° City of Spokane Valley
"�" Community Development
°FW 11703 E. Sprague Ave., Suite B-3 DE -ROW
Yalley� Spokane Valley, WA 99206 ROW -2013-0346
(509)720-5240
permitcenter(a-)spokanevalley.org
The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit
applicant, by definition, is the property owner or an authorized agent of the property owner. It is the
responsibility of the applicant / permittee that the use described on the front of this permit complies with
applicable codes and that required inspections are requested. Failure to request inspections as listed
below and obtain the necessary approvals before progressing beyond the point where inspections are
required and may necessitate removal of certain parts of the construction are the applicant's / permittee's
or property owner's expense- ,_.,
f—P',
Owner/Agent �,.--2,� Date:
Staff Approval Date:
Printed by: Heather Moms on: 07/12/2013 12:56 PM
Page 2 of 2