Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
2008, 04-28 Permit App: 08001392 Canopy
Project Number: 08001392 Inv: 1 Application Date: 4/28/2008 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project In formation: Permit Use: CANOPY ON FRONT OF HOUSE AND GARAGE Contact: TRIUNE CONSTRUCTION LLC Address: 1784 W TUALATIN DR C-S-Z: POST FALLS ID 83854 Setbacks:Front Left: Right: Rear: Phone: (208)704-5150 Group Name: Site Information: Project Name: Plat Key: 001711 Name: TWIN VIEW ADD AMENDED PLAT District: Sout Parcel Number: 45214.1324 Block: Lot: SiteAddress: 11605 E 16TH AVE Owner:Name: OTIS,M D&J A Address: 11605 E 16TH AVE Location::CSV SPOKANE,WA 99206-2702 Zoning: R-3 SF Res District Water District: 007 MODEL Hold: ❑ Area: 15,834 Sq Ft Width: 0 Depth: 0 Right Of Way(ft): 0 Nbr of Bldgs: 1 Nbr of Dwellings: 1 Review Information: .,.> _,. .# 'F2.a Review Building Plan Review eleased'By: l Originally Released: 4/17/2008 By: tmelbourn Landuse/Zoning/HE Conditions Released By: Originally Released: 4/16/2008 By: kkendall Operator: JD Printed By: JD Print Date: 4/28/2008 Project Number: 08001392 Inv: 1 Application Date: 4/28/2008 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Building Permit Contractor: TRIUNE CONSTRUCTION LLC Firm: TRIUNE CONSTRUCTION LLC Address: 1784 W TUALATIN DR Phone: (208)704-5150 POST FALLS ID 83854 This Application: Total Project: Description Grp Type Notes Su Ft Valuation Su Ft Valuation COV DECK R-3 VB 320 $4,800.00 320 $4,800.00 Totals: 320 $4,800.00 320 $4,800.00 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $111.25 WSBC SURCHARGE 1 SELECT $4.50 SF PLNS RVW<7999 SQ FT 1 SELECT $44.50 Permit Total Fees: $160.25 Payment Summary -m. - a a s �. Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $160.25 $160.25 $0.00 $160.25 $160.25 $160.25 $0.00 $160.25 Disclaimer: Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: JD Print Date: 4/28/2008 Permit Center Scof 11703 E Sprague Ave, Suite B-3 PERMIT NUMBER: �!'C1 porrrI%ane Spokane Valley,WA 99206 PERMIT FEE: jValleY' (509)688-0036 FAX: (509)688-0037 www.spokanevalley.org Community Development Residential Construction n New Construction Accessory Bldg Permit Application n Addition/Remodel n Deck ® Other:F 2z)rx - rPve(-L c 1 SITE ADDRESS: mans- C 1(?Th AU. sr KAYE 11Al`GY WA 992060 ASSESSORS PARCEL NO: LEGAL DESCRIPTION: Building Owner: Contractor:. -f) 1. \ 1E Cry ._' EL Name: 1 1` v :�t 4-.1"y ©-1-1.5 Name: SEfF 1n Address:,►to o T a- � lQ TL, Address: 17 Act t� h,:l//4 *1 n D 12 Ci tyCity :spn � tolI� 1, )1‘ p: n Q'S T 47411,5 State: Zip: irosci Phone: Fax: Phone: 8 704/ S7,520 Faxes 73 Z5-30 Contractor Lic No: Exp Date: TRIUNt., cicvi rL Contact Person City Business Lic.No: Name: :ream WLc Phone: ade ?!7 c/ ,TZLsD Describe the scope of work in detail: Cost of Project: $ 1 tQ 7 , Cows- 2 6},rA 5-1,-,)i IL. egae� ovC�2. 41rr►t t5 C--- "AC, 4.rsu E 40 I r\ Juc4L Co0t42.4 the, Ca-vv..f (X -11.c- z Proposed Use: **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK: DIMENSIONS: #OF STORIES: TOTAL HABITABLE SPACE: N 9 ' `IDX$ A -6,— MAIN FLOOR TO SQ. 2ND FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE FTG: AREA: ri/A iyipt FINISHED B SEMENT GARAGE SQ. FTG: DECK/' OV. PATIO SQ. FTG: 30% SLOPES ON SQ. FTG: Net NIA 36 ) . '0 APR PERTY: - #OF BEDR O S: CONSTRUCTION TYPE: HEAT i:- S WE R SEPTIC? IPS 031(411;Vuw N/A The permitee verifies,acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling,the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances.6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be�esse . `7 p���l� �� SIGNATURE: ' DATE: ©�/' /5 'O �i ? )i VALLEYr' Method of Pa nt// APR 1 . 2008 0 Cash c' Check 0 Mastercard 0 VISA Bankcard#: Expires: VIN#: i-LATER Authorized Signature: REVISED 2/15/07 CITY 11703 E Sprague Ave Suite B-3♦ Spokane Valley WA 99206 ane pok ♦509.688.0036 ♦ Fax: 509.688.0037 • . Valle ye 1© Completed Building and Mechanical Application with: Accurate address, Parcel Number and/or Legal Description, description of work, owner and contractor information, signature and date. ❑X Three (3) sets of plans including Site Plan, elevations, floor plans, foundation plans with details, roof plan, framing plans and details. ❑X Show the height of any proposed buildings or accessory structures. © Floor plan for each floor: Dimension to scale(minimum 1/8") and label each room (including sq footage of house and garage on plans) show each level of existing house and square footage of any additions. EX Egress windows: Provide at least one window or exterior door approved for emergency escape or rescue from basement and in every room for sleeping. ❑X Floor framing details: Joist type, size, spacing and installation details. ❑X Roof framing plan and details EX Furnace and hot water heater location EX All header locations: type, size and connections ❑X Foundation plan ❑X Insulation information EDecks and Stairway details All braced wall panel types: show locations and details of installation, including engineered design Smoke detector locations 22" x 30" attic access location 18" x 24" crawl space access One-hour separation detail: between house and garage ��� New project _; Project yo sa �orkato � New pre-app meeting poxane Transmittal Plan revisions ❑ City of Spokane Valley Transmittal Date: 4000010Valley Community Development Wednesday,April16,2008 Department 11703 E.Sprague Ave,Suite B3 Spokane Valley,WA 99206 Phone:509.688.0036 Site Address: 11605 E 16TH AVE Project Number: 08001392 Parcel Number: 45214.1324 Zoning: R-3 Water District: MODEL Fire District: FD 01 Applicant: TRIUNE CONSTRUCTION LLC Owner: OTIS, M D & J A 1784 W TUALATIN DR 11605 E 16TH AVE POST FALLS ID 83854 SPOKANE. WA 99206-2702 (208) 704-5150 e-mail: e-mail: Contact: TRIUNE CONSTRUCTION LLC Occupant: 1784 W TUALATIN DR e-mail: POST FALLS ID 83854 (208) 704-5150 e-mail: Contractor: TRIUNE CONSTRUCTION LLC Arch/Engineer: r--) 1 1784 W TUALATIN DR - t POST FALLS ID 83854 L l / (208) 704-5150 _ e-mail: IF)) 11111 1' [ �' ( � 1 Project CANOPY ON FRONT OF HOUSE AND GARAGE Description: Building Landuse Engineer Utilities Health Fire Dist Assessor APPLICATION t I SITE PLAN �,/ PLANE /J Please send all plan review and project comments via e-mail to the highlighted individuals. '."a..,-..PJ.?Ul.):J of 11 a 1 ed./ 2?.,.? 7Ua.:-,ua u' �.I'44 ....vo'r1v.7 ./vs- Lc l i� /Y✓drl- c,1 tv, - , 14.999 - _ � ,t .fcc çM,9t .69S- - \ /` �Ls-• •.=rv, — °I/A— d 7' 3 AV 4191 . - - -�$ 99• ' x'5 91- - _ =.-� \ - - � '� ,9£'£Z I o2. , t ,0.0Z I 1 Co' sa co Z/ w Ut Z/ - w 11/4i CO ,O O$ I I •I ,SZ'£ti I 0 1/ 0 Io 0 o o ,o•oti 10 /1 0 iI i -- • r' o 0/ ) L1 £bi CO 0 b r I 311111'r i « 1 Seg' I.` II 11605 E 16th s'. , s r ;`ii. - '''442'1,., , , ,:,.,.., .,,,,,.. 44,e'-40`ti,,,,,-,,w - # l' ' ''.' i4T:';- ; , ., s . a� , ,, ill: fi 'P:t. ,' ,, _ e, , :, ,„,'''',:.:i4T,':' IC,_ F ` I tr `.. l. u AMP Legend it `�___— _ r 0 0 0 A �� . __ 1 Roofing material Sheathing Cm. Rafter size x See spacing 1 details I 2x blocking A Beam size x House __ rr 14ft maximum wall Post size x (4 x 4 minimum) spacing (6 x 6 recommended) T — Pre-engineered bracket DE5 i‘NED Foe uPurT `;j:;Ei;fiii 241" minimum depth 18" minimum width /� Existing \X\ --<—: rafters Existing Continuous 2x ledger c wall anchor by lag screws 2x blocking , -... Ay, i Approved hanger 111 s IL New rafter /( Ne rafter to Existing existing bearing wall L Approved metal bracing Bracing required t) I � -t • - -1 4 1>ECi< Y v2 qL f FK ST! tfL S. I _ 8 r � I r F Ito 2±1 DINVEIDipi r 4 L, 1, 1E. Ilo' AVE 416 iVr' I I I i , F— I s SIT If\N t l l 11 ��'' i-jc 1!,k'psT\_ • „V,!./ \,\//gl, RE > — NEW SfiE_OCTOkE _S.L)J V )L Rp • i 1_, , . . . . . / H . . . . )4> •\� '.L1 \ --...\ If\h\ • "?2_ > . • w !DE-c44 •c 5 12 Dt C.Jt; • 1 /,, �w. _tS�_ F1� ' .rte . , . , , . ,, , . • . j .' 1..***-0L-- I. '2---- ."?S '..- 6 ' : •., . , . . .. _ . . . . . _ , . . . . . . , . _ . „ ., . . . . . s. \i.„--u,......) , , , , , , , , L.'''. ., / ; i . ___,,riuk..f\ Q:t.c..A.)'' ...\ Pgj _ .4; , S1136 r. I , Il • . .......\(//7.----, . . f I ri---7.\\(,,,,,--. . , ; APPROVED I i ) I , , I )4t. : ,t , i I I I I I li i __+__A:JL=t__I I * ' i , , 14 , L I_ i I , 4_ j IT • H `' 1 1 jI 1 I I i a }. J 4 !— — i l t l f 1 !_ 1 I - I 1 ._ —i f I I -D1.-,E-c•44-,,L_F T I 1 1 I 1 I a t .I I! � . _ ----. -_ _ - _- - - _ ` . 1_ �� � _ II ! I 'r��` •1 G 1 I y . I 1 1 i . , - , : , - , , -, --- -•- -,- -1- -t -' AA Al ' tS""i 1 -^', -' • 1- : . , . , . , • i ; . , , , 1 , , I 1 1 ,---- , , t•-r- • _,,_ '',, 1 i- - , ---r --- -- H- ' -- I- -''' ---1 I i 11 IF, 1. - f --- '. '- , , , I- : - - -;:- 4 --- ; - --, - - ' - I I 1 . j ; r , ' , . ' ' ' t I • r . I 1 1 , j - ' t- h.- I---- , , 1 I • - -!----- T 7 i. I , ,,44 : ; I ` • , j 03-1 9 '''170 ! -gOTF, ; ! • ; t • , — . : . , ,, , , . : , , , , , , , , .__, , • : , 1 : , _, , i L 4 , ---;-- 1-, , ; j 1 r It , cf) j ! --I- 11 (j.-.11-r- ! -; --, • T-- , . 1.4 , II' I ; • : 1 , , I I , . ---r---- --.---• - T r- r +-----;--- • - ;- - -I- ; ! ; 1--- ' I---I- r-- ; , i . , • -,-, \ 4 J . ', ' ,. , ',. , , , , i, , 1 , 1 : ,,,...... , . _ _.,, , i . a......, 'Lkil'eg-rt-r.'., 1 .._,1.„ . . .. ' ., • 1 ! ______3,,i4,.._!...•-- -, ,0 ,.m._ . - , - _ ___,_ ,,, -- _,1.- --r 0 iT 11 i : 1cA 141 ivi i (-1,1 n Ile 1__v : ' 1 , , , , , , , , , , , , , ,,, i , , .. , , 1 , , , , - ' .,, _ 4 -i, 1 i - i--- [ --pi-214 1 II r t H I 1 1 I 1 . i i , 1 , i 1 ; i 1 I ;- 1 i F. • , I 1 1 . 1 .. . 1 1 • 1 L__ I, i_ , I i. I ! i ,. n ... r— ,- ., 7 - I I t- r- ,' r q ! r I- r, -1--- I I T- 1 ; I 1 i1 1 1 I 1 ---1 I, , 1 ! 1 ; ! 1 ', I I I, . 1_____ 1 t -,- ; -1-. I , t , , • 1 ; • - 1- it-•---'- -1 ; • I 1 1,--- I,------T 1 I 1 i i I ii , -c\--- . . . , i 1 1 i i 1 , , , :, 1 , i 1 1 L , , , , , , : . 1 , ' . „. i L_ , , , r i , i 1 I ... 4_ L , f , -i -I -; j';'-'-, !, I L } I t -' '1 ; ; ; ' : • 1 , I I 1 , , . : : . , , . , i_ i'. ! 1- ' i .f ,.. , t _ , , f [ ' ' -. -,, --,--- ,, ,- , .t• , t , 111.---IN i T , , , , 1, i 1 1 I I . i 1 ; -1, I . , . , t , t 1 i , I 1, I_ ', _,, i ,, , , _, 1 , , i 't -- 1 'i- -.- -i- -, -, 'r i I i i i r , 7 t f . . 1 i ; t L' l' ' ' I • t ' t I: 't t- t j -I j 1 , I , , . . , 1 f ' 't , A- ;-• -; ':-- -4- ; -- j-Tr 7 1 4, -[ il 1 r i I ,----t-- ---t-----7----i------- - - , i ' !-- , I , ! • , , 1 , , 1 1 1 1 j ! 1 I • r 1 , I I I ! I r I :1 1 I : ; ; 1 , , : 1 I 1 1 I !__ , I : I ! 1 1 1 ' t 1 1 • 1-- -1-- 4- t -1 -4 t- 4 t -r ---1---1-- t 1-- : 1 -7---- ii- --11- -I I- I I- I- I I j I 1 1 4 't 1 -1 4- 1- i I 1-- .-. -I- , , • 7- ' r 1 i , ; , , , : , , i ,., ' 1 ; . I , . , . , ,, . , , ' . . • i . ; , , : : , . , . t ' , tt,t4--------•,-----.4----. - ' . . • 1 I . . • . . . , . . . , , . • . , .................' , . ,_-, r.....„,, , . . ' r----7-7 Aii-- . ., . . . , ---1 t 4 ) . _.. : , , , 4 , 1 . i ' : ; 1. i i•-• , . , - 1 /1- , i --- I;;• .. :1' ...._ 1 . .,. .. - - , ,,".,!,,i - • ' - - - - • • !•:'., • ' - I 1, r, 1, ,, 1 : ; , . . , • . , , ti t ;');,- T "f" ! vi ,, , , . 4 4 -•-...II4 J :,..-..`. : i , . , ' ,ril 1, , v,... . jai ,...., . , , , , ',I- i , - •:: ' ' ' , J._ ft, • •,'•''', ' ' - „ . . , .•: - ' : I !ft I . , . 1-,, 1 , 1.,.' ,..., al i ,, 1 I I 1'Ll. .. - . • . - , ' .. - . t:, • • -, - i -•;i 1 I . . . ', .:' ' st,..';,'LiiiiMMI4':—1 ''''' ' '' - ' -‘ 1 [ ---1---r--- ,f.•-•.1 _ • •.•.1 . , , ,.•: i , , . l• 'i•;...'t'. ,,. t t t t I 1. I, _,. , , ..,‘• • :-;:11 1-' [.1 -11, i-f j , • . t ' ,,--,..„E if - ... „ , . z .,A • i--- 1.F!`11 ' ' :,...h : . ,I ,,\.;,:, •'- '' .2' -1 - , ', ,. • • . . ., 1 : , . , , . , . , -., 9__int_ i .. .,.„,..,,,..,,,,..-.,-..s.., ‘,-.7.,,,_ , . . . . . .= . ,, ../ , „, - .., / , .,, ,4,-- . _. . • . _ _ _._ ___._ _ _ _ ___ . . . , . • • • . • . . , ---- — •. ' , . . , . . . . . . . . . . . . . . . . • • • . . . . , . . . . • • • . . , . . . . . , • . . . . , . . , . • . . . ' - ' ' : . • , . ' . . . . . . . . . . . . . . . ; • , I ; • . . • I j • i• I I 1 I 1 1 i -I ( iTi I I — 1 1 .i.kr1-)!I -1P-4-s J I. I I }- I 11 + i fi 1 I i1 i , 1 I I I , L0.0! 1 j I I f r , 7 V ! l - . la ___—_____—___-_____...„_____._..-.,.__ z? St — .y O LS r_ . • I, 1,:i , , J Aj • Ii _ lipt‘ , G I 35F f/ ,* X (XW : 1 r f • • ..('11,4$ */o 'Z tf firl , 1 v ! f _ • �-- 1 ,1 �?3' tJ it 1 ar ° 9c wri �-v , , �Qn'4�/I �4jZ1 17 C bbd -Vot1"=_-'-AVri;.�-+r== Tt ucK-c)\VI " -Z1/°) r , ___:___.:________i_i _ _ . '. . . .. . . . •. . \ q N 4 _ PROVIDE DIAGRAMS AND ENGINEERING LAYOUTS FOR ROOF TRUSSES, BEAMS AND FLOOR SYSTEMS PRIOR TO FRAMING INSPECTIONS CITY COPY THIS BUILDING SUBJECT TO FIELD INSPECTION CORRECTIONS REVIEWED FOR CO* - CO PLIANCE SPOKANE VALLEY r3 e;i DI DIVISION For City Use Only CITY OFks • ' PLUS Project Number 0(X1.---)\ 3�-1 c U� .ne Project Address a Q ° 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. c I Your application review TARGET DATE is ! The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure,you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone,fax, email,or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE—APPLICANT PINK—BUILDING FILE REV 9/07