Loading...
2008, 06-30 Permit App: 08002272 Addition Project Number: 08002272 Inv: 1 ,Application Date: 6/30/2008 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Inormation: Permit Use: 28 X 36 DUPLEX ADDITION AND(2)DECKS Contact: CLARK,STEPHEN B&DEBORAH G Address: 13127 E 16TH C-S-Z: SPOKANE VALLEY WA 99216 Setbacks:Front Left: Right: Rear: Phone: (509)891-8244 Group Name: Site Information: Project Name: Plat Key: 002753 Name: VERA District: Sout Parcel Number: 45224.2364 Block: Lot: SiteAddress: 13125 E 16TH AVE Owner:Name: CLARK,STEPHEN B&DEBORAH Address: 13127 E 16TH Location::CSV SPOKANE VALLEY WA 99216 Zoning: R-3 SF Res District Water District: 010 VERA Hold: ❑ Area: 12,996 Sq Ft Width: 0 Depth: 0 Right Of Way(ft): 40 Nbr of Bldgs: 1 Nbr of Dwellings: 1 Review Information: nz; Review Building Plan Review Released By Originally Released: 6/30/2008 By: tmelbourn Landuse/Zoning/HE Conditions Released By: Originally Released: 6/13/2008 By: cjjanssen Operator: jmm Printed By: jmm Print Date: 6/30/2008 Project Number: 08002272 Inv: 1 ,Application Date: 6/30/2008 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Building Permit - — Contractor: OWNER Firm: OWNER Phone: (000)000-0000 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation 2ND FLOOR R-3 VB 942 $70,348.56 942 $70,348.56 DECK OPEN R-3 VB 336 $5,040.00 336 $5,040.00 RES ADD R-3 VB 942 $89,480.58 942 $89,480.58 Totals: 2,220 $164,869.14 2,220 $164,869.14 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $1,357.75 WSBC SURCHARGE 1 SELECT $4.50 SF PLNS RVW<7999 SQ FT 1 SELECT $543.10 Permit Total Fees: $1,905.35 ADMINSTRATIVE EXCEPTION(ADE-09-07)APPROVED FOR LOTS 1-4 BLOCK 1 AND LOTS 1-4 BLOCK 2 OF MAMER PLACE.MINIMUM FRONTAGE OF 60 FEET IS ALLOWED-MH Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $1,905.35 $1,905.35 $0.00 $1,905.35 $1,905.35 $1,905.35 $0.00 $1,905.35 Disclaimer: Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: jmm Print Date: 6/30/2008 Permit Center cmoe 11703 E Sprague Ave,Suite B 3 PERMIT NUMBER: .22 r(_- Spokane Spokane Valley,WA 99206 PERMIT FEE: jValley- (509)688-0036 FAX: (509)688-0037 ", LEy www.spokanevallev.org Community Development � U�b Residential ConstructionyNefv Construction Accessory Bldg Permit Application - Additie /Remodel Deck _ Other: SITE ADDRESS: i 3 I7 )317J (1 lit-H._ ASSESSORS PARCEL NO: LEGAL DESCRIPTION: Building Owner: 51-63(6.- `-' 'I F Contractor: yS � Name: Name: J Address: 3 i 227 e [(pi- mg Address: City: illtop.. State: We Zip c 2A,, City: State: Zip: Phone: ) �/q !/ j'�9 L/L� Fax: w Phone: Fax: 0 I Contractor Lic No: Exp Date: Contact Person Cl hl Q. S V City Business Lic.No: Name: Phone: rl —3.--2m4 Describe the scope of work in detail: Cost of Project: $ 20 V— 410191k)6 eil ) FAO- WI T-- Proposed Use: 0 Vi 6 6c.bi-IP 7T S **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TOZP3P�K: DIZM���QN� 3�i #OF STORIES:_Z TOTAL IT B �(PAC eFy MAIN FLOOR TO SQ. 2Nu FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE FTG: 9� 'WC qv-2_ ___Irt AREA: FINISHED BA ENT GARA Q. FTG: DEC- 0.)/. PATIO .Q. FT3: 30% SLOPES ON �� t� SQ. FTG: Ai iii-- /for l' 1)30711 a i.'&i ) PROPERTY: tv el— #OF BED OMS: CONSTRUCTION TYPE: HL A T SOU: - SEWER OR SEP IC. 45)7 a `9 -rV 0 ' ice The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling,the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances.6) Plans or additional information may be required to be submitted,and subsequently approved before this application can be processed. X SIGNATURE: 4444,7 Lg. cec DATE: Co, °-3 .- 0 g Method of Payment: 0 Cash 0 Check 0 Mastercard 0 VISA Bankcard#: Expires: VIN#: Authorized Signature: REVISED 2/15/07 SCITYOrs 11703E Sprague Ave Suite B-3♦ Spokane Valley WA 99206 po1ine ♦509.688.0036 ♦ Fax: 509.688.0037 • 4. Valley EICompleted Building and Mechanical Application with: Accurate address, Parcel Number and/or Legal Description, description of work, owner and contractor information, signature and date. ❑X Three (3) sets of plans includingaiiellaloac t s,-ft or-piste,#et+da plans with dctails,4ee€-plee, s. Show-t+he e . - • - : :.' .' • --o racc,>rbsory-struettares. © Floor plan for each floor: Dimension to scale(minimum 1/8") and label each room (including sq footage of house and garage on plans) show each level of existing house and square footage of any additions. ❑X Egress windows: Provide at least-one window or exterior doorapproved-for emergency escape or rescue-frorrr-basement and in every room-for-sleeping. © Floor framing details: Joist type, size, spacing and installation details. Reef-fromfngpleri-atm-detait- ❑X = rater feateir#eeetien �X Aber--location-:-type-,--size-andgonaaetiens 0 Fetdaien.plan ❑X trts64ationinformatien All braced wall panel types: show locations and details of installation, including engineered design Smoke detector locations 22" x 30" attic access location 1 2 ss Eine-hour separatiun etait-between-house-and-gerage PLUS Permits Land Use System is ' x-'- . Y s Rrd^*Y^ .. Type que<Llon for het. .•®P5X1,&,4 a . 65 M1 k !C- :.:....-- u..Yw:...:.,..wC_7�e..a i..w.Aw..wB_�a.va..vi..uwnmevu .. .i'awv'- ".- '%:• 1 NE Projects - - ' i•:-.i _ I❑1 xf a'IPt CSV Project tt Search Group Name Search: JlProject Name Search: 16d' l V-± 91006074 ( .. Sir" 38315 Group: Pmiect Name' i Use: SEWEFl CONNECTION-WOl_FCFlEST Fila Nbc Dist: Sash SOUTH Actions i Site Address 1 Contacts i Team j Milestones 1 Logs I Conditions I Characteristics I I' Invoice Status I Fees Payment History 1 Billing 1 BondsRenewals Inspections , I ,, LI /r,sCecfiers Date Type Occ Inns Status In Out Description Pint Typ Final - 0. 12118/1991 88888 0 RMo _11A 2.1 8:88 8:00 iNAC IN t J \:: r J Record: I/f « li -_ I 'L..I H f.1+J oft _..... '. rW- a Fort0 View 4i. -,,' rAlji R„ aw _,. Wednesday,Oct 08,2008 04:47 PM PLUS-Permits Land Use Sv+ , aaY r Tfpa a question for hale v Edit.,_Y.!ev+ ttamt e "•' , ,,itc .��„ kk NEProjects , -, ,,— CSV Project U Search Group Name Search: Project Name Search: "" I v. 7,, 00002272 �I _.-. --. IPIi G1 �. ,.a 1 Site 38315 'Group. Project Name Use 28 X 36 DUPLEX ADDITION AND(2(DECKS Fite Nbc Dist: South SOUTH Actions I Site Address 1 Contacts j._ Team I Milestones j Logs i Conditions i Characteristics I Invoice Status j Fees I Payment History 1.,. Billing 1 Bonds Inspections I Renewals .__I &specfiiv.•s `. Date Type Occ hits Status In Out Description Pint Typ Final - 10. , 07,117006 00101 J 0 RG A 11:79 1119 t R3i,a' i1U J— 07:1 4,2008 00102 27j 0 RG A 11:19 11.79 "r C)S9 ,5 #Sii .� i'. ; _J -J J - I. ! E 1 4 4 Q a , 3 00 Record: 14 1 H t . 1►I 1►*1c? 24x i Forts44- 'M '''' tom"". , •� . Wednesday,Oct 08,2008 04:47 PM For City Use Only CITY OF PLUS Project Number Ll ZZ 7 Z Project Address i, I L` 1 1.P Spokane 1--' a eT 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter®spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is b 1 1 9 The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review > Submit complete, accurate plans and documents. Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. > Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure,you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email,or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE-APPLICANT PINK-BUILDING FILE REV 9/07 117 Ante re 90' PLANNING DEPT. APPROVED BY. DATE:'SLOB