2010, 02-16 Permit: 10000508 Sewert�
SPOWe COUNTY
SPOKANE COUNTY
DEPARTMENT OF BUILDING & PLANNING
1026 WEST BROADWAY AVENUE • SPOKANE, WA 99260-0050
Site Information
Site Address: 6015 E 17TH AVE
Parcel Number: 35252.0110
Subdivision: CONVERTED CNTY DATA
Block: Lot:
Zoning: SFR
Owner: RILEY, JIMMY C E & GIGI
Address: 6015 E 17TH AVE
SPOKANE, WA 99212-3208
Building Inspector: NONE
Water Dist:
Sewer Connection Permit
Project Information
Project Number: 10000508 Inv: 1 Issue Date: 2/16/2010
Permit Use: SEWER CONNECTION
Applicant: H & S CONSTRUCTION
11817 E VALLEYWAY AVE
SPOKANE, WA 99206
Contact: H & S CONSTRUCTION
11817 E VALLEYWAY AVE
SPOKANE, WA 99206
Setbacks- Front: Left: Right:
Group Name:
Project Name:
Permits
Contractor: H & S CONSTRUCTION License #: HSCON** 123KF
Phone: (509) 926-8964
Phone: (509) 926-8964
Rear:
PROCESSING FEE 1 $15.00 S1 SEWER CONNECTION 1 $125.00
Total Permit Fee: $140.00
**FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO
COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL
INSPECTION FEES APPLY AFTER 30 MINUTES.
**CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE
REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES,
INCLUDING THOSE RELATED TO TRENCH SAFETY.
**INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY
BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE
ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
**SEWER STUBS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE
AND ARE CLEAR AND UNOBSTRUCTED TO THE MAIN. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
**THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME.
BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO
OWNERS OF UNDERGROUND FACILITIES.
Total Fees AmountPaid AmountOwinE
$140.00 $140.00 $0.00
Payment Summary
Tran Date Receipt # Payment Amt
2/16/2010 434 $140.00
Processed By: DOMPIER, DAWN PERMIT
Printed By: Force, Faith Page 1 of 1
NOTICE
It is the responsibility of the applicant/permittee to see to it that the use described on the front of this permit complies with applicable codes and
requirements and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before
progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant's/permittee's
or property owner's expense. At a minimum, the following inspections ARE REQUIRED by County Code:
1. FOOTING - all structures, including manufactured homes when forms and reinforcement are in place and prior to placement of concrete.
NOTE: This inspection includes review of the structure's setbacks from property lines. Minimum setbacks are established by County zoning
regulations. Front, flanking, side and rear yard setbacks are measured from property lines. Curb lines and fence lines are not necessarily indicative of
property lines. In some residential areas, the County can own as much as 20 feet of right-of-way between your property and the actual improved street/
curb. The responsibility to comply with applicable setback provisions lies solely with the permittee—neither Spokane County nor its authorized
representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your
structure. Failure to properly locate the structure may require its relocation at the owner's/permittee's expense.
2. FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete.
3. FRAMING - after all framing, bracing and blocking is in place, plumbing, mechanical rough -in inspections have been approved, and prior to
concealing.
4. INSULATION - prior to the installation of drywall.
5. PLUMBING - after rough -in, before covering, and final.
6. MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment, and final.
7. FINAL - all permits - when complete when complete and prior to occupancy and/or use. Please provide 24 hours notice.
NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site
plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access,
on-site drainage (°208 swales"), road improvements, parking, and landscaping are common requirements of a permit/site plan which
must be completed prior to final approval of a building or issuance of a Certificate of Occupancy.
8. MANUFACTURED HOMES - foundation inspections prior to pouring pads, inspection of Blocking/Tie-downs, when completed per manufacturers
installation instructions. Final Inspection approval prior to occupancy: stairs, handrails, skirting, etc., installations completed WAINSTag(s) must be
affixed to the home, completed inspection record card and manufacturer's installation instructions must be available on site.
9. SEWERS - prior to cover
10. RIGHT-OF-WAY/APPROACH - prior to placement of concrete, or, if gravel approach, after completion.
In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc., must be inspected
prior to cover. Check with the department for "special inspections" in conjunction with commercial projects.
FOR INSPECTIONS:
TO INSURE PROMPT SERVICE, PLEASE GIVE ONE WORKING DAY/24 HOUR NOTICE .
PARTS OF YOUR PROJECT MAY REQUIRE PERMITS AND INSPECTIONS
FROM MORE THAN ONE AGENCY.
• Building, plumbing, mechanical and fire inspections, Department • Road cuts for utilities or driveways, Division of Engineering &
of Building & Planning 477-3675 Roads - 48-HOUR NOTICE REQUIRED 477-3600 or
• Construction in a flood plain, Division of Engineering & Roads 477-3600 State Department of Transportation 456-3000
• Electrical wiring, State Department of Labor and Industries 324-2640 • Sewer connection, Division of Utilities 477-3604 or City Public
• On-site waste disposal system, Spokane Regional Health District Works Department 625-6300
324-1560
PERMIT EXPIRATION
Unless otherwise noted, building, plumbing, fire and mechanical permits will be considered null and void by limitation if the work authorized by
the permit is not commenced within 180 days or is stopped for a period of 180 days, unless a written request for an extension of the permit is received and
approved by the Building Department prior to expiration. At a minimum an inspection should be requested at least once every 180 days to assure the
validity of the permit. Please call if you have any questions.
REFUNDS
All requests for building permit refunds must be made in writing by the applicant/permittee (shown on the reverse) no later than 180 days after the
date of fee payment. Refunds of not more than 80% of the permit fee paid may be authorized when no work has been done under the permit. No
refunds maybe authorized more than 180 days after fee payment. Please contact the other agencies with respect to their refund policy on all other permit
types.
MISTAKE?
If you think we've made an error in processing this permit or find erroneous information on the permit, please bring it to our attention immediately by filing
a written request for correction within 10 working days of discovery. All such requests should be directed to the Department of Building and Planning at:
Spokane County Department of Building & Planning
1026 West Broadway Avenue Spokane, WA 99260
Phone: (509) 477-3675 Fax: (509) 477-4703 TDD: (509) 477-7133
REVISED 11/08 BLDG PERMIT
ft
PLUS - Permits Land Use System w., .k`
!File Edit View Insert Format Records Tools Winclow Help
�! 1'JAI 11
Zv At,
T ■.
Ready
L Inbox - 14c,,,DYt10 Label c�PkDAI Pa,,.
Monday, Jun 16, 2003 02:11 PM
9
W
lite Q Projects :' 2:10 PM _
Project # Search Project Name Search:
Group Name Search:
��,L�j+
93002070
3
Site: 131193 Group: J
Project Name:
Use: GAS WATER HEATER, GAS EQUIPMENT, PIPING
Dist: E NONE
Invoice Status Fees I Payment History
l Billing
Bonds i Inspections
Renewals
Actions i Site Address Contacts Team
Milestones
Logs Conditions
Characteristics
Siterlddressec
Owner Name 1
Occupant Name I
Site Address
Address
Address!
Parcel Number City, State, Zip
City -State -Zip
City -state -Zip
35252,0110 6015 E 17TH AVE
SVOSON, DIANE
SPOKANE, V!A 99206
6015 E 17TH AVE
GIS 0
SPOKANE,VIA 99206
SPOKANE,= 09206
Phone
(509) 922-1450
DOB
Record; 11 1 ►I ` - of 1
I
Ready
L Inbox - 14c,,,DYt10 Label c�PkDAI Pa,,.
Monday, Jun 16, 2003 02:11 PM
9
W
lite Q Projects :' 2:10 PM _