Loading...
2013, 04-09 Permit: SW-13000416 SewerSPOKANE COUNTY UTILITIES PERMIT Application Number: SW -13000416 Project Description: SEWER CONNECTION Project Name: VALLEYVIEW Primary Contact: LARRY MILLER EXCAVATING Phone: 509-218-3335 SITE INFORMATION: Site Address: 6107 E 17TH AVE Parcel Number: 35252.0103 Assessor's Description: VALLEY VU HILL 1ST 1_3131 Inspection Area: : (509)-477-3675 Permit Issued Date: 04/09/2013 Expiration Date: 04/09/2014 Applicant: LARRY MILLER EXCAVATING Address: 7117 E RUTTER AVE SPOKANE, WA 99212 Phone: 509-218-3335 Email: Owner: Address: Phone: Email: Water District: Spokane County Water District #3 Zoning: CONTRACTOR INFORMATION: LARRYME918DR, Exp. 03/19/2015 LARRY MILLER EXCAVATING 7117 E RUTTER AVE SPOKANE, WA 99212 509-218-3335 DETAILS: NORRIS, DONALD & JODY 6107 E 17TH AVE SPOKANE, WA 99212-3237 509-534-3375 Fire District: Spokane Valley Fire Land Area: 12656.5 Square Feet Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 $125.00 FEE DETAIL: Processing - Utilities Utilities Permit $26.32 $125.00 Total Fee: $151.32 CONDITIONS: Inside Public Transit Benefit Area Possible FEMA Flood Zone Parcel within 100 feet of pipeline(s) owned by the following: (Yellowstone) Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. Date Printed: 04/09/2013 10:07:43 Project Coordinator: Kathy Cummings SPOKANE COUNTY UTILITIES PERMIT Application Number: SW -13000416 Permit Issued Date: 04/09/2013 Expiration Date: 04/09/2014 INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 04/09/2013 10:07:43 Project Coordinator: Kathy Cummings