Loading...
2012, 05-03 Permit: SW-12001272 Sewer SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW-12001272 05/03/2012 Expiration Date: Project Description: SEWER CONNECTION Primary Contact: VISTA CONSTRUCTION& DEVELOPMENT Applicant: VISTA CONSTRUCTION& DEVELOPMENT Permit Type: SEWER Address: 3420 N TSCHIRLEY RD SPOKANE,WA 99216 Phone: (509)926-2243 Email: SITE INFORMATION: Site Address: 5220 E 16TH AVE Owner: JACOBSON,JEFF Parcel Number: 35261.9063 Address: 5220 E 16TH AVE SPOKANE VALLEY,WA 99212-3205 Subdivision: Phone: Assessor's Description: 26-25-43 (CITY OF SPOKANE VALLEY) E165FT Email: OF W660FT OF NW1/4 OF NE1/4 EXC 16TH AVE Inspection Area: Water District: Spokane Fire District: Fire District 8 County Water District#3 Zoning: Land Area:4.74 acres CONTRACTOR INFORMATION: General Contractor VISTACD999DE VISTA CONSTRUCTION&DEVELOPME 3420 N TSCHIRLEY RD#1 SPOKANE,WA 99216 509-926-2243 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 $125.00 FEE DETAIL: Processing-Utilities $25.94 Utilities Permit $125.00 Total Fee: $150.94 CONDITIONS: CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR&INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. _ FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. Date Printed:05/03/2012 08:49:14 Printed by:IIS APPPOOLWSP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW-12001272 05/03/2012 Expiration Date: INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. _ SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. _ THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed:05/03/2012 08:49:14 Printed by: MS APPPOOLWSP.NET v4.0