Loading...
2012, 10-10 Permit: SW-12002361 Sewer SPOKANE COUNTY BUILDING AND PLANNING PERMIT • Permit Issued Date: Application Number: SW-12002361 10/10/2012 Expiration Date: Project Description: SEWER CONNECTION Primary Contact: KALIN EXCAVATION Project Name: VALLEYVIEW Applicant: KALIN EXCAVATION Permit Type: SEWER Address: 9229 E WOOLARD RD COLBERT,WA 99005 Phone: 509-954-9101 Email: SITE INFORMATION: Site Address: 6324 E 18TH AVE Owner: CALDWELL,THOMAS&DARLENE Parcel Number: 35252.1409 Address: 6324 E 18TH AVE SPOKANE,WA 99212-0102 Subdivision: VALLEY VIEW HILLS Phone: THIRD ADDITION Assessor's Description: VALLEY VU HILLS 3RD L9 B2 Email: Inspection Area: Water District:Spokane Fire District:Fire District 8 County Water District#3 Zoning: Land Area: 14000 Square Feet CONTRACTOR INFORMATION: General Contractor KALINE*0431 B KALIN EXCAVATION 9229 E WOOLARD RD COLBERT,WA 99005 509-954-9101 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 $125.00 FEE DETAIL: Processing-Utilities $25.94 Utilities Permit $125.00 Total Fee: $150.94 CONDITIONS: Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE.SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR&INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Date Printed:10/10/2012 10:00:38 Printed by:IIS APPPOOLWSP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW-12002361 10/10/2012 Expiration Date: FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED.PERMIT ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME.BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed:10/10/2012 10:00:38 Printed by:IIS APPPOOL\ASP.NET v4.0