Loading...
2013, 04-16 Permit: SW-13000478 Sewer SPOKANE COUNTY UTILITIES PERMIT Application Number: SW-13000478 Permit Issued Date: 04/16/2013 Expiration Date: 04/16/2014 Project Description: SEWER CONNECTION Project Name: VALLEY VIEW Primary Contact: LAUER EXCAVATION &CONST Applicant: LAUER EXCAVATION&CONST Phone: 509-981-7954 Address: PO BOX 11581 SPOKANE VALLEY,WA 99211 Phone: 509-981-7954 Email: SITE INFORMATION: Site Address: 6419 E 18TH AVE Owner: PANCOAST, R.WILLIAM&JANICE K Parcel Number: 35252.0315 Address: 6419 E 18TH AVE SPOKANE,WA 99212 Phone: Assessor's Description: VALLEY VIEW HILLS 1ST L15 B3 Email: Inspection Area: : (509)-477-3675 Water District: Spokane County Water Fire District: Fire District 8 District#3 Zoning: Land Area: 14000 Square Feet CONTRACTOR INFORMATION: LAUEREC931DA, Exp.03/01/2015 LAUER EXCAVATION &CONST PO BOX 11581 SPOKANE VALLEY, WA 99211 509-981-7954 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 $125.00 FEE DETAIL: Processing-Utilities $26.32 Utilities Permit $125.00 Total Fee: $151.32 CONDITIONS: Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE.SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR& INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. SEWER PERMITS ARE VALID FOR ONE(1)YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER.ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. Date Printed:04/16/2013 13:52:28 Project Coordinator:Julie Shatto SPOKANE COUNTY UTILITIES PERMIT Application Number: SW-13000478 Permit Issued Date: 04/16/2013 Expiration Date: 04/16/2014 THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed:04/16/2013 13:52:28 Project Coordinator:Julie Shatto