Loading...
2014, 07-09 Permit: APR-2014-0052 Approach ,>OI,,,,% City of Spokane Valley Sn(lan' e Community Development Y 11703 E. Sprague Ave., Suite B-3 , SValley� Spokane Valley, WA 99206 (509)720-5240 permitcenter(a.sookanevalley.org APR-2014-0052 DE-APPROACH PROJECT NAME: RESIDENTIAL APPROACH ISSUED: 07/09/2014 SITE ADDRESS: 11415 E 18TH AVE SPOKANE VALLEY • EXPIRES: PROJECT DESCRIPTION: REPAIR/REPLACE EXISTING WESTERN-MOST APPROACH PARCEL: 45282.2008 APPLICANT: OWENS,CHAD W&KATY OWNER: OWENS, CHAD W&KATY 11415E 18TH AVE SPOKANE VALLEY,WA 11415E 18TH AVE 99206 SPOKANE VALLEY,WA99206 CONTRACTOR: ARROW CONCRETE&ASHPALT SPCLT 10225 E TRENT SPOKANE VALLEY,WA99206 509-435-7353 GENERAL CONTRACTOR: ARROW CONCRETE&ASPHALT License: ARROWCA054NP PO BOX 11133 Expires: 06/18/2018 SPOKANE,WA 99211 509-922-7847 FEES: Paid Due Approach $52.00 $0.00 Totals : $52.00 $0.00 CONDITIONS * All approaches are to be inspected by the Development Engineering Inspector(John Johnson 509-599-6306) prior to placing concrete or asphalt. * Saw-cutting of existing curb in the right-of-way in order to create an approach is not allowed in Spokane Valley. * Prior to excavation, it is the Contractor responsibility to contact the purveyor of any transmission pipeline that is within 100 feet of permitted work,as per RCW 19.122.033. * Approach to be constructed per Standard Plan R-112 * 4'wing/curb drop may extend into 5'area Printed by:Mary May on:07/09/2014 03:03 PM Page 1 of 2 City of Spokane Valley S` OF.101"11 Community Development DE-APPROACH Y 11703 E. Sprague Ave., Suite B-3 doo.Valley® Spokane Valley, WA 99206 APR-2014-0052 (509)720-5240 permitcenteraspokanevalley.org The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicant/ permittee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required and may necessitate removal of certain parts of the construction are the applicant's I permittee's or property owner's expense. Owner/Agent Date: 1 JJjj 04- - StaffApproval / /% ,0/( j /._ K-2 Staff '_ Date: r' i Printed by:Mary May on:07/09/2014 03:03 PM Page 2 of 2