Sprague E 3625 Aluminum Recycling PLAN NUMBEfi APPLICATION/PERMIT PERMIT NUM9ER
SPOKANE COUNTY - BUILDING CODES DEPARTMENT ~
NORTH 811 JEFFERSON / SPOKANE, WASHING70N 99260 /(609) 456-3875 ~
APPLICANT: COMPLETE NUMBERED SPACES - PRESS HARD TO MAKE 3 CQPIES ~
Jb ADORESS
~ .r,~,, ~ (,{,•i~,~ {~;~j LEGAL DESCAIPTION - SEE ATTACHED
PARCEI NUMBEii/5 ~ •
-~jo~ o~~ t
f ~
, 14ER I ti tONI
a AD RES ~~Actudl Set 8icks in Faet
~ orth ISoutn ~ d Fas West _
c8 CTOR p Staa of P~cet Zona l4pr lon 1
,
' 4 ~;~L'~- C • ~o X I~.qO ti Nc^1
~DD Z Type Const Ocwpancf► lered
❑Yes ❑No ❑ ReQ'd
DE 10 R f~, Valustlon q~O0 IoO 8ultdinq Aroa in Sq Ft
~rt7'
5 AD RESS 21P Maln Floor j UOOar Ftoors Garage ArQa Storage
CHANGE OF USE FROM TO Araa of Decka Flnisr+ed Basement Untln Basoment
s
No 9ath~ No Storfes No Raomc No ot Owaliings
TYPE (yy Q ALT ❑ AO'N 0 RPL, ❑ MVE,
7 OF 'PE 0 OTHER
avORK 15 BLD ❑ PLMB ❑ MEGH ❑ M M ❑ POOL CERTIFICA?E Req'd. Rac'd Not Req'd.
~ of EXFMPTION
tJESCRI~E wq~~ ~ EnUm, Dlst. LocaRlOn (Area)
&LJ IN b~ FEFSCOLLFCTED
~ VALUA7ION SOUkCE ~BAS HIECTRIC ATER SEWER
Ownershlp E COnE
~ 9~ 000 UfitUT1ES 4~/L -o' PubUc ORrlvata
~ AIB $
~ I hereby certify that I have read and exammed this application and have read the ,.NOTICE„ $in pravisions inciuded
on reverse side, and know the same to be true and correct All provisrons of Esws an rdinances governing this Bwlding
~ ryoe of vvork will be complied with whether specified herem or not~ The gnntmg o permit does not presume
te give authqrity to wolate or cancel the provisions of any other state or loca) law lating con ction or the ~
perfoPmance of construcnon SEE REVERSE SIDE FOR REQUIRED INSPECT Plumbing a
'r Q ~
DATE OF APPLICATlON 51GNATURE QF APPLICA ' Mech.
~
~ SPECIAL APPROVALS SPECIAL CONDiTIONS
NAME OATE Plan Check
y ~t1~ HCelth
SEPA 4
P*an^ I na •
- rF ,33,,ma„ = Mo6ile Home
I ~ ~CO) Engmeer Other ISpecityl
,nwr es
TOTAL S
Plans Examrner
WHEN MACHINE VAIIDATEO IN THIS SPACE,
!3EpA rneckuss THIS BECOMES A PEAMIT
Runoin~cr►~~ ` PERMIT IS NONTRANSFERABLE
/ _ PERMIT EXPIRES ONE YEAR FROM OATE OF ISSUANCE DATE ISSIIEQ PERMIT NO
~ ~ / 14 a,? . .l w6,0*1 /ee G~ G b * 7
f" ~ ~ '
~►ct Person Name ,d I/ r ~j4 K Business Name ~,~p
ress Address
one 3 C. ~ q a _ - ` Phone
o ~ .
~ rv 5~,~. ( l:~~^ e r
CER PERMIT REVIEW
geeef Pe5~' -
Th~,s building permit review is intended to appraise you of the improvements (roadway, side-
walk,, curb, stormwater, etc.) which must be constructed in association with your building
permi t. This checkl,i st wi 11 ,be fi 11 ed out by the Engi neer' s staff and a copy wi i 1 be
returned to you at the time that the permit is initialed by the Engineering Department.
All requirements sh'all be completed ,prior to issuance of the Wilding permit. Al1 un-
checked boxes require additional research or informationto make a determination.
1. Stormwater Drainage Considerations
A. Per guidelines for "Storrmnater Management 1981" both on and off site.
1. 248 Considerattons* ~ Yes _ No
2. Flood hazard tane considerations** Yes _ No
~
3. Storm Drainage Plan Yes _ No
II. Zone Chanqe
1. Zone change on property _ Yes _ No
2. Are requirements of zone change incorporated into _ Yes _ No~
site plan
I I I. Ri ght of Wa,y
1. Does permit necessltate R.O.W. dedication _ Yes _ No
2. Did zone change require R.O.W. dedication _ Yes No
3. Radius at corner Yes ~ No
IV. County Road Improvement 5 eWi-r e~
~ J cc~4e
1. Roads need to be mpo`ved. ~ H~fv wider _ Yes _ No
2. Curb Yes No
3'. CRP/RID agreement ` Yes ~ No
4. Plans for improvements,provided _ Yes No
5,. Si dewa 1 k Yes No
V. Parking Plan & Approach Locati'on
1. Review and stgn off by Traffic ~ Yes _ No 2. State or City sign off _ Yes ~ No
VI. Field Review: Prel iminary Comments .
* All land within the Aquifer Sensitive Area, where deemed feasible by the County Engi-
neer, shall incorporate stormrvater treatment to mitigate the potential for groundwater
degradation. (See Guidelines for Stormwater Management 1981, Spokane Board of County
Commissioner's Resolution No. 80-1592, as amended.) i
The purpose of flood hazard zone review is to mi,nimize losses'due to flooding in spe-
cific areas designated by Flood Hazard Boundary maps on file at the County Engineer's
Office. (See Spokane Board of County Commissioner's Resolution No.-81-0726, as
amepded.) '
f sN
Contact Persnn Name Business Name 10 ,
Address ~ G Address
Phone Phone
COMMERCIAL 6UILDING PERMIT REVIEW
This building permit review is intended to appraise you of the improvements (roadway, side-
walk, curb, stormwater, etc.) which must be constructed in association with your building
permit. This checklist will be filled out by the Engineer's staff and a copy will be
returned to you at the time that the permit is initialed by the Engineering Department.
All requirements shali be completed prior to issuance of the building permit. A11 un-
checked baxes require additional research or information to make a determination.
1. Stormwater Drainage Considerations
A. Per guidelines for "Stormwater Management 1981" both on and off site.
1. ZOg Considerations* ~ Yes ~ No
2. Flood hazard Zone considerations** ! Yes ~ No
3. Storm Drainage Plan ~ Yes _ No
II. Ione Chanqe .
l. Zone change on property _ Yes ~ No
2. Are requirements of zone change incorporated into Yes No
site plan -
111. Right of Way
1. Does permit necessitate R.O.W. dedication _ Yes ~ No
2. Did zone change require R.O.W. dedication _ Yes ~ No
3. Radius at corner _ Yes .2rf No
IV. County Road Improvements
1. Roads need to be improved. How wide _ Yes ~ No
2. Cu rb _ Yes No
~►3. CRP/RID agreement _ Yes ~ No
4. Plans for improvements provided _ Yes }C, No
5. Sidewaik _ Yes ~ No
V. Parking Plan & Approach Location
l. Revtew and sign off by Traffic Yes _ No
2. State or City sign off ~ Yes P4 No
VI. Field Review: Preliminary Comments
* All land within the Aquifer Sensitive Area, where deemed feasible by the County Engi-
neer, shall incorporaxe stormwater treatment to mitigate the potential for groundwater
degradation. (See Guidelines for Stormwater Management 1981, Spokane Board of County
Commtssioner's Resolution No. 80-1592, as amended.)
The purpose of flood hazard zone review is to minimize lasses due to flooding in spe-
cific areas designated by Flood Hazard Boundary maps on file at the County Engineer's
Office. (See Spokane Board of County Commissioner's Resolutton No. 81-0726, as
amended.)