Loading...
2011, 06-30 Permit App: 11001952 Egress Windows Project Number: 11001952 Inv: 1 Application Date: 6/30/2011 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: = .. i� g"." ¢J:... 1=4 "._E-®„ dpi; W�E+6� u Permit Use: 2 EGRESS WINDOWS Contact: DIFILIPPO,NICHOLAS&PEGGY Address: 12015 E 19TH AVE C-S-Z: SPOKANE,WA 99212 Setbacks:Front Left: Right: Rear: Phone: (509)924-5802 Group Name: Site Information Project Name: Plat Key: 001221 Name: HILLCREST PARK 01ST ADD District: Sout Parcel Number: 45281.0316 Block: Lot: SiteAddress: 12015 E 19TH AVE Owner:Name: DIFILIPPO,NICHOLAS&PEGGY Address: 12015 E 19TH AVE Location::CSV SPOKANE,WA 99212 Zoning: R-2 SF Res Suburban District Water District: 011 MODERN Hold: U Area: 12,185 Sq Ft Width: 0 Depth: 0 Right Of Way(ft): 50 Nbr of Bldgs: 1 Nbr of Dwellings: 1 Review Information: Review Building Plan Review Released By: Originally Released: 6/30/2011 By: TMELBOU Permits: Building Permit Contractor: W R S GENERAL CONTRACTORS Firm: W R S GENERAL CONTRACTORS Address: PO BOX 141925 Phone: (509)535-4279 SPOKANE VALLEY,WA 99206 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation 1&2 FAMILY R-3 VB 2 EGRESS 0 $3,965.38 0 $3,965.38 WINDOWS Totals: 0 $3,965.38 0 $3,965.38 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $97.25 WSBCC SURCHARGE 1 SELECT $4.50 SF PLNS RVW<7999 SQ FT 1 SELECT $38.90 Permit Total Fees: $140.65 Operator: JD Printed By: jmm Print Date: 6/30/2011 Project Number: 11001952 Inv: 1 Application Date: 6/30/2011 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $140.65 $140.65 $38.90 $101.75 $140.65 $140.65 $38.90 $101.75 Disclaimer: Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: jmm Print Date: 6/30/2011 PERMIT CENTER CITY OFok "�-z;,. Spane Project Transmittal Valley 11703 E Sprague Ave. Suite B-3, Spokane Valley,WA 99206 Phone: 509.720.5240 Fax: 509.688.0037 Deferred Documents ❑ Provide one of the following (REQUIRED FOR ACCEPTANCE): Response to Review Comments ❑ PLUS Project#: ! I I 1 S Revisions to Application ❑ Parcel Number: (Describe ) . �' �.���t tc. 1' •�� .' Other Bel+w : Site Address: � . .I a I M55\) YOLACI \) 1 I . I. PYA 6 , Ue__OF Route to (Please chec all that apply): I : Division #of Sheets/Type of Document/#of Copies Received by: ❑ Building VERIFIED/INITIALS 3 I &cc \',-FPC- - APQi AiaQ 11_ / / ❑ / / ❑ QC Check by: O Development Engineering / / VERIFIED/INITIALS o / / ❑ / / ❑ / / ❑ QC Check by: VERIFIED/INITIALS O Planning / / ❑ / / ❑ / / ❑ / '°/ ❑ QC Check by: ❑ SV Fire Department / / VERIFIED/INITIALS / / ❑ I / ❑ / / ❑ QC Check by: Project Contact Information: ` VI/� I Name:���e �/ -- 1 , \ � 1 Phone: 2q (— (00.5 7Email: 1 c-..CAN\CUS-+t Ae+ Fax: Relationship to Project: � 1111 Architect ❑ Engineer 0 Other Design Professional 0 Contractor [�'Uwner I Applicant NOTE: Bring all documents to the City of Spokane Valley Permit Center at 11703 E Sprague Ave—Suite B-3. We are sorry for any inconvenience, but documents rought Isewhere cannot be accepted. 0 k 6—VA- Effective June 10,2009 1 ti PDSProfessional Design Services 222 W. Mission Ave. #224, Spokane, WA 99201 509.325 4476 Fax: 509.325.4587 August 3, 2011 Marcus Ridgely Window Replacement Systems 12018 E. 1't Ave. Spokane, WA 99206 Rob 6uerry City of Spokane Valley Building Department 11707 E. Sprague, Suite 106 City of Spokane Valley, WA 99206 Peggy&Nick Difilippo 12015 E. 19th 4028 City of Spokane Valley, WA 99206 REGISTERED RCN TELT RE: Difili o Residence / P • iP WA E M.MAR U•-S Basement egress window STATE OF WASHIN, ON 12015 E. 19th City of Spokane Valley, WA 010'0*•II Conditions: The egress window marked "A"on the basement plan is 4'-0"wide x high which is replacing a 3'-0"wide window. There is an additional load on the rim joist/header condition of approximately 338 lbs. of total live and dead load at 52 lbs. per square foot. The previous load condition with the 3'-0"wide window had a uniformly distributed load of 1,014 lbs. The new 4'-0"window condition load has a total uniformly distributed load of 1,352 lbs. A single 2x10 rim joist/header spanning the 4'-0"window will carry a total uniformly distributed load of 2,673 lbs. with allowable stresses based on using Douglas Fir -Larch No. 2& Better per Table No. 25-A-1--ALLOWABLE UNIT STRESSES-STRUCTURAL LUMBER, page 294, 1991 UNIFORM BUILDING CODE(UBC)see attached table section 1991 UBC This assumes the house was built prior to the adoption of the 1994 UBC Please note this does not factor the added structural capacity of the 2x mud sill and the section of concrete wall which likely has a one or two rows of horizontal steel reinforcing continuous over the top of the new window. Should you have any questions please give me a call. Regards, W ne M. Marqu rchitect Professional Design Services N (In TABLE NO.25-A4—ALLOWABLE UNIT STRESSES—STRUCTURAL LUMBER—(Continued) D a Allowable Unit Stresses for Structural Lumber—VISUAL GRADING (Normal loading.See also Section 2504) ALLOWABLE UNIT STRESSES IN POUNDS PER SQUARE INCH EXTREME FIBER IN BENDING Fa GRADING Compres- Comptes- RULES Tension slon per. Sion MODULUS UNDER SIZE ' Single- Repetitive. Parallel Horizontal pendicular Parallel OF WHICH SPECIES AND CLASSIFI- member member to Grain Shear to Grain to Grain ELASTICITY COMMERCIAL GRADE CATION Uses Uses Fr F Fl 21 F, E 21 GRADED . DOUGLAS FIR-LARCH(Surfaced dry or surfaced green.Used at 19%max.m.c.) DOUGLAS FIR-LARCH(North) 2450 2800 1400 95 730 1850 1,900,000 Dense Select Structural Select Structural 2100 2400 1200 95 625 1600 1,800,000 Dense No.1 2050 2400 1200 95 730 1450 1,900,000 No.1 2"to 4" 1750 2050 1050 95 625 1250 1,800,000 Dense No.2 thick 1700 1950 1000 95 730 1150 1,700,000 • No.2 2"to 4" 1450 1650 850 95 625 1000 1,700,000 No.3 wide 800 925 475 95 625 600 1,500,000 NLGA,A1 1750 2050 1050 95 625 1500 1,800,000 WCLIB, m Sud ar �� 800 925 475 95 625 6001.500,E and co 1050 1200 625 95 625 1150 1,500,000 WWPA C Construction 2"to 4" (See footnotes Standard thick 600 675 350 95 625 925 1,500,000 T Utility 4"wide 275 325 175 95 625 600 1,500,000 2 through 9, 0 11,13,15 33 Dense Select Structural 2100 2400 1400 95 730 1650 1,900,000 and 16) Select Structural 1800 2050 1200 95 625 1400 1,800,000 W Dense No.1 2"to 4" 1800 2050 1200 95 730 1450 1,900,000 No.1 thick 1500 1750 1000 95 625 1250 1,800,000 F Dense No.2 5"and 1450 1700 775 95 730 1250 1,700,000 0 No.2 wider 1250 1450 650 95 625 1050 1,700,000 Z No.3 and Stud 725 850 375 95 625 675 1,500,000 !7 Appearance 1500 1750 1000 95 625 1500 1,800,000 _ O O m . Target Date sheet For ty Uses(Qnly..__ ScrrY PLUS Project LC)IF o ane Project Address Valle LLD 11703 E Sprague Ave Suite 6-3 ♦ Spokane Valley WA 99206 509.720-5240♦ Fax: 509.688.0037 1 permitcenter®spokanevaltey.org As part of our on-going commitment to customer service during the review process of your project application,we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date,we will contact you with a revised target date. Your application review TARGET DATE is 7I i ' The TARGET DATE is the date we estimate your project application'will have had its initial technical review.It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review D Submit complete,accurate plans and documents. Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information.: D Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. > Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us by your target date.Staff may contact you before the target date if the initial review is complete.By following this procedure,you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1.Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2.Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete,your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3.Technical Compliance.Once an application is administratively complete,it is routed to technical staff for compliance review. Depending on the type of project,technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals,each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up.Information regarding fees and pre-construction meetings(if required)will be provided by the Permit Specialist at that time. CD-003 V-71 06-21-11 Page 1 of 1