2011, 06-30 Permit App: 11001952 Egress Windows Project Number: 11001952 Inv: 1 Application Date: 6/30/2011 Page 1 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information:
= .. i� g"." ¢J:... 1=4 "._E-®„ dpi; W�E+6� u
Permit Use: 2 EGRESS WINDOWS Contact: DIFILIPPO,NICHOLAS&PEGGY
Address: 12015 E 19TH AVE
C-S-Z: SPOKANE,WA 99212
Setbacks:Front Left: Right: Rear: Phone: (509)924-5802
Group Name:
Site Information Project Name:
Plat Key: 001221 Name: HILLCREST PARK 01ST ADD District: Sout
Parcel Number: 45281.0316 Block: Lot:
SiteAddress: 12015 E 19TH AVE Owner:Name: DIFILIPPO,NICHOLAS&PEGGY
Address: 12015 E 19TH AVE
Location::CSV SPOKANE,WA 99212
Zoning: R-2 SF Res Suburban District
Water District: 011 MODERN Hold: U
Area: 12,185 Sq Ft Width: 0 Depth: 0 Right Of Way(ft): 50
Nbr of Bldgs: 1 Nbr of Dwellings: 1
Review Information:
Review
Building Plan Review Released By:
Originally Released: 6/30/2011 By: TMELBOU
Permits:
Building Permit
Contractor: W R S GENERAL CONTRACTORS Firm: W R S GENERAL CONTRACTORS
Address: PO BOX 141925 Phone: (509)535-4279
SPOKANE VALLEY,WA 99206
This Application: Total Project:
Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation
1&2 FAMILY R-3 VB 2 EGRESS 0 $3,965.38 0 $3,965.38
WINDOWS
Totals: 0 $3,965.38 0 $3,965.38
Item Description Units Unit Desc Fee Amount
RESIDENTIAL PERMIT FEE 1 SELECT $97.25
WSBCC SURCHARGE 1 SELECT $4.50
SF PLNS RVW<7999 SQ FT 1 SELECT $38.90
Permit Total Fees: $140.65
Operator: JD Printed By: jmm Print Date: 6/30/2011
Project Number: 11001952 Inv: 1 Application Date: 6/30/2011 Page 2 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $140.65 $140.65 $38.90 $101.75
$140.65 $140.65 $38.90 $101.75
Disclaimer:
Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information
contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: jmm Print Date: 6/30/2011
PERMIT CENTER
CITY OFok "�-z;,.
Spane Project Transmittal
Valley 11703 E Sprague Ave. Suite B-3, Spokane Valley,WA 99206
Phone: 509.720.5240 Fax: 509.688.0037
Deferred Documents ❑ Provide one of the following (REQUIRED FOR ACCEPTANCE):
Response to Review Comments ❑ PLUS Project#: ! I I 1 S
Revisions to Application ❑ Parcel Number:
(Describe ) . �' �.���t tc. 1' •�� .'
Other Bel+w : Site Address: � .
.I a I M55\) YOLACI \) 1 I . I. PYA
6 , Ue__OF
Route to (Please chec all that apply):
I :
Division #of Sheets/Type of Document/#of Copies Received by:
❑ Building VERIFIED/INITIALS
3 I &cc \',-FPC- - APQi AiaQ 11_
/ / ❑
/ / ❑
QC Check by:
O Development Engineering / / VERIFIED/INITIALS
o
/ / ❑
/ / ❑
/ / ❑
QC Check by:
VERIFIED/INITIALS
O Planning / / ❑
/ / ❑
/ / ❑
/ '°/ ❑
QC Check by:
❑ SV Fire Department / / VERIFIED/INITIALS
/ / ❑
I / ❑
/ / ❑
QC Check by:
Project Contact Information: ` VI/� I
Name:���e �/ -- 1 , \ � 1 Phone: 2q (— (00.5 7Email: 1 c-..CAN\CUS-+t Ae+ Fax:
Relationship to Project: �
1111 Architect ❑ Engineer 0 Other Design Professional 0 Contractor [�'Uwner I Applicant
NOTE:
Bring all documents to the City of Spokane Valley Permit Center at 11703 E Sprague Ave—Suite B-3.
We are sorry for any inconvenience, but documents rought Isewhere cannot be accepted.
0 k 6—VA- Effective June 10,2009
1 ti
PDSProfessional Design Services 222 W. Mission Ave. #224, Spokane, WA 99201
509.325 4476 Fax: 509.325.4587
August 3, 2011
Marcus Ridgely
Window Replacement Systems
12018 E. 1't Ave.
Spokane, WA 99206
Rob 6uerry
City of Spokane Valley
Building Department
11707 E. Sprague, Suite 106
City of Spokane Valley, WA 99206
Peggy&Nick Difilippo
12015 E. 19th 4028
City of Spokane Valley, WA 99206 REGISTERED
RCN TELT
RE: Difili o Residence /
P • iP WA E M.MAR U•-S
Basement egress window STATE OF WASHIN, ON
12015 E. 19th
City of Spokane Valley, WA 010'0*•II
Conditions:
The egress window marked "A"on the basement plan is 4'-0"wide x
high which is replacing a 3'-0"wide window. There is an additional load on
the rim joist/header condition of approximately 338 lbs. of total live and
dead load at 52 lbs. per square foot.
The previous load condition with the 3'-0"wide window had a uniformly
distributed load of 1,014 lbs. The new 4'-0"window condition load has a
total uniformly distributed load of 1,352 lbs. A single 2x10 rim
joist/header spanning the 4'-0"window will carry a total uniformly
distributed load of 2,673 lbs. with allowable stresses based on using Douglas
Fir -Larch No. 2& Better per Table No. 25-A-1--ALLOWABLE UNIT
STRESSES-STRUCTURAL LUMBER, page 294, 1991 UNIFORM BUILDING
CODE(UBC)see attached table section 1991 UBC This assumes the house
was built prior to the adoption of the 1994 UBC
Please note this does not factor the added structural capacity of the 2x
mud sill and the section of concrete wall which likely has a one or two rows
of horizontal steel reinforcing continuous over the top of the new window.
Should you have any questions please give me a call.
Regards,
W ne M. Marqu
rchitect
Professional Design Services
N
(In
TABLE NO.25-A4—ALLOWABLE UNIT STRESSES—STRUCTURAL LUMBER—(Continued) D
a Allowable Unit Stresses for Structural Lumber—VISUAL GRADING
(Normal loading.See also Section 2504)
ALLOWABLE UNIT STRESSES IN POUNDS PER SQUARE INCH
EXTREME FIBER IN
BENDING Fa GRADING
Compres- Comptes- RULES
Tension slon per. Sion MODULUS UNDER
SIZE ' Single- Repetitive. Parallel Horizontal pendicular Parallel OF WHICH
SPECIES AND CLASSIFI- member member to Grain Shear to Grain to Grain ELASTICITY
COMMERCIAL GRADE CATION Uses Uses Fr F Fl 21 F, E 21 GRADED .
DOUGLAS FIR-LARCH(Surfaced dry or surfaced green.Used at 19%max.m.c.)
DOUGLAS FIR-LARCH(North) 2450 2800 1400 95 730 1850 1,900,000
Dense Select Structural
Select Structural 2100 2400 1200 95 625 1600 1,800,000
Dense No.1 2050 2400 1200 95 730 1450 1,900,000
No.1 2"to 4" 1750 2050 1050 95 625 1250 1,800,000
Dense No.2 thick 1700 1950 1000 95 730 1150 1,700,000
• No.2 2"to 4" 1450 1650 850 95 625 1000 1,700,000
No.3 wide 800 925 475 95 625 600 1,500,000 NLGA,A1
1750 2050 1050 95 625 1500 1,800,000 WCLIB, m
Sud ar �� 800 925 475 95 625 6001.500,E and co
1050 1200 625 95 625 1150 1,500,000 WWPA C
Construction 2"to 4" (See footnotes
Standard thick 600 675 350 95 625 925 1,500,000 T
Utility 4"wide 275 325 175 95 625 600 1,500,000 2 through 9, 0
11,13,15 33
Dense Select Structural 2100 2400 1400 95 730 1650 1,900,000 and 16)
Select Structural 1800 2050 1200 95 625 1400 1,800,000 W
Dense No.1 2"to 4" 1800 2050 1200 95 730 1450 1,900,000
No.1 thick 1500 1750 1000 95 625 1250 1,800,000 F
Dense No.2 5"and 1450 1700 775 95 730 1250 1,700,000 0
No.2 wider 1250 1450 650 95 625 1050 1,700,000 Z
No.3 and Stud 725 850 375 95 625 675 1,500,000 !7
Appearance 1500 1750 1000 95 625 1500 1,800,000 _ O
O
m
. Target Date sheet
For ty Uses(Qnly..__
ScrrY PLUS Project LC)IF
o ane Project Address
Valle
LLD
11703 E Sprague Ave Suite 6-3 ♦ Spokane Valley WA 99206
509.720-5240♦ Fax: 509.688.0037 1 permitcenter®spokanevaltey.org
As part of our on-going commitment to customer service during the review process of your project application,we are
providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet
this date,we will contact you with a revised target date.
Your application review TARGET DATE is 7I i
' The TARGET DATE is the date we estimate your project application'will have had its initial technical review.It is
not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
D Submit complete,accurate plans and documents.
Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be
several days before they can look at your new or revised information.:
D Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise
for dealing with reviewer comments would be the best choice for the entire review process.
> Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us by your
target date.Staff may contact you before the target date if the initial review is complete.By following this procedure,you will
save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1.Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as
indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal. This does
not prevent technical staff from requesting additional information as a result of their technical review.
2.Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from
substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is
complete,your application will be routed to the appropriate staff and remain in their review queue until it comes up for review.
3.Technical Compliance.Once an application is administratively complete,it is routed to technical staff for compliance review.
Depending on the type of project,technical staff may include multiple reviewers. You should be contacted by phone, fax, email,
or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re-
submittals,each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the
application are received, a Permit Specialist will process the application and contact the person specified on your application for
permit pick-up.Information regarding fees and pre-construction meetings(if required)will be provided by the Permit Specialist at
that time.
CD-003 V-71 06-21-11 Page 1 of 1