Loading...
2008, 05-05 Permit App: 08001642 Remodel Project Number: 08001642 Inv: 1 Application Date: 5/5/2008 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: _ Permit Use: RELOCATE DOORWAY IN KITCHEN/ Contact: BERRY BUILT&DESIGN INC SHORTENED WALL LENGTH Address: 204 S KOREN DR C-S-Z: SPOKANE VALLEY WA 99212 Setbacks:Front Left: Right: Rear: Phone: (509)534-5410 Group Name: Site Information Project Name: mow....: -�;,:.... ........ . Plat Key: 001222 Name: HILLCREST ACRES 01ST ADD District: Sout Parcel Number: 45281.0504 Block: Lot: SiteAddress: 12008 E 20TH AVE Owner:Name: MURPHY,THOMAS R&SUSAN Address: 12008 E 20TH AVE Location::CSV SPOKANE,WA 99206-5709 Zoning: R-2 SF Res Suburban District Water District: Hold: ❑ Area: .00 Acres Width: 0 Depth: 0 Right Of Way(ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 1 Review Building Plan Review Released By: Originally Released: 5/5/2008 By: tmelbourn Permits: _,_ _ � - Building Permit Contractor: BERRY BUILT DESIGN INC Firm: BERRY BUILT DESIGN INC Address: 204 S KOREN Phone: (509)534-5410 SPOKANE VALLEY WA 99212 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation 1&2 FAMILY R-3 VB DOORWAY 0 $150.00 0 $150.00 Totals: 0 $150.00 0 $150.00 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $69.25 WSBC SURCHARGE 1 SELECT $4.50 SF PLNS RVW<7999 SQ FT 1 SELECT $27.70 Permit Total Fees: $101.45 Operator: JD Printed By: jmm Print Date: 5/5/2008 Project Number: 08001642 Inv: 1 Application Date: 5/5/2008 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Plumbing Permit Contractor: BERRY BUILT DESIGN INC Firm: BERRY BUILT DESIGN INC Address: 204 S KOREN Phone: (509)534-5410 SPOKANE VALLEY WA 99212 Item Description Units Unit Desc Fee Amount SINKS 1 NUMBER OF $6.00 DISH WASHERS 1 NUMBER OF $6.00 GARBAGE DISPOSAL 1 NUMBER OF $6.00 CLOTHES WASHER 1 NUMBER OF $6.00 MISCELLANEOUS FIXTURES 2 NUMBER OF $12.00 WATER PIPING-DWV 2 NUMBER OF $12.00 Permit Total Fees: $48.00 Payment Summary: M _,: ,.... Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $101.45 $101.45 $0.00 $101.45 Plumbing Permit $48.00 $48.00 $0.00 $48.00 $149.45 $149.45 $0.00 $149.45 Disclaimer: Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: jmm Print Date: 5/5/2008 Permit Center *dime0000\1611703 E Sprague Ave, Suite B-3 PERMIT NUMBER: ( Z, Spokane Valley, WA 99206 PERMIT FEE: l '(e' j Valley` (509)688-0036 FAX: (509)688-0037 www.spokanevalley.org Community Development Residential Construction ^ New Cons ruction Accessory Bldg Permit Application XAdditio ' emodel H Deck n Other: SI1F ADDRESS:_12008 E 20th Spokane Valley Wa 99206 ASSESSORS PARCEL NO: LEGAL DESCRIPTION: Building Owner: Contractor: Name:Tom and Suzie Murphy Name:Berry Built and Design, Inc. Address: 12008 E 20th Address:204 S Koren d. City: Spokane Valey State: WA Zip: 99206 City: Spokane Valley State: WA Zip:99212 Phone: 509.995.3394 Fax:N/A Phone: 509.534.5410 Fax: 509.536.9185 Contact Person Contractor Lic No: Exp Date: BERRYBD924BW 1/16/2010 Name:Torn Murphy City Business Lic. No: Lez_t__ /.3147/ Phone: 509.995.3394 LO853146(city of Spokane) G� fevv /1/4(Q/41+/e'b Describe the scope of work in detail: Cost of Project: /,5"5 ,acy o/4- Proposed Use: Kitchen ez,'.rc,r **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK: DIMENSIONS: #OF STORIES: TOTAL HABITABLE SPACE: From 8'to 17' (kitchen 8'x22' (kitchen only) 1 2400 square feet only) MAIN FLOOR TO SQ. 2"" FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE FTG: 1200 N/A 500 AREA: N/A FINISHED BASEMENT GARAGE SQ. FTG: DECK/COV. PATIO SQ. FTG: 30% SLOPES ON SQ. FTG: 700 N/A N/A PROPERTY: N/A #OF BEDROOMS: 4 CONSTRUCTION TYPE: HEAT SOURCE: SEWER OR SEPTIC? Kitchen remodel only Hydronic baseboards sewer The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. C� SIGNATURE: DATE: ! S416J Method of Payment: 0 Cash 0 Check 0 Mastercard k(.VISA 0•/.°N,� Permit Center S�`i`r 11703 E Sprague Ave,Suite B-3 Valle PERMIT NUMBER: J�r'i y Spokane Valley,WA 99206 (509)688-0036 FAX:(509)688-0037 PERMIT FEE: Community Development www.spokanevallev.ore Plumbing Permit/Lag n Commercial Residential /LagSITE ADDRESS: _ ' 6 ?el-7' 9%Aae Building Owner A, ,/ ,/� �y%� Name: Tom C,1 e=�/G NVv e?�-y Phone: Sv / ?7(33,"'V Fax: ----- Address: —� Address: / � S T*^ City:!>�ryy,,,, UNe State: 01 Zip: l��Y 4_ Contractor �t ( �''/+�' Name: pT€i Q7Ji% 71" e& �i'/v� Phone:�i 5—V5,7/to Fax: 6-364 ,Z Address: de,r�'7ovrie /Lb #raj City:5 Pe J7AV-el State: (uo. Zip: lf 9ec.1.- License No: ,-v O Y R6 C�p4/ 3� City Business Lic: LU G�-3iy� `6poki Contact k�GM— 07 pD 1 J Name: 0)/1----- e4zey Phone: 62Y/ e& •�/3/y DESCRIPTION OF WORK #OF UNITS X COST = TOTAL AMOUNT 1 TOILETS WATER CLOSET,BIDETS X $6.00 = 2 URINALS X $6.00 = 3 TUBS X $6.00 = 4 SHOWERS(PER TRAP) BATH,STALL,ON-SITE BUILT X $6.00 = LAYS/BASINS,BAR,FLOOR,KITCHEN, 5 SINKS LAUNDRY,UTILITY,JANITOR,PHOTO, 1 X $6.00 = X-RAY,FOOD,PREP/CULINARY MEAT 6 DISHWASHER 1 X $6.00 = 7 CLOTHES WASHER I X $6.00 = 8 GARBAGE DISPOSAL I X $6.00 = 9 WATER SOFTENER X $6.00 = 10 ELECTRIC WATER HEATER NOTE: IF GAS,SEE MECHANICAL X $6.00 = AREA,CASE,COIL,TRENCH, 11 FLOOR DRAINS CONDENSATE X $6.00 = 12 ROOF DRAINS/OVERFLOW DRAINS X $6.00 = 13 FOUNTAINS,DRINKING X $6.00 = WATER PIPING/DRAIN-IN WASTE, NSTALLATION,ALTERATION,REPAIR, 14 VENT,PLUMBING,REVERSAL REVERSALS L— X $6.00 = 15 SEWAGE EJECTOR GRINDER,SUMP PUMP X $6.00 = ICE AN/OR COFFEE MAKER,HOSE BIB, 16 WATER USING DEVICE STEAMER X $6.00 = PROOFER,CARBONATOR,SWAMP COOLER VACUUM BREAKER,CHECK VALVE, AND R.P.B.P.D.FOR: VATS,TANKS, 17 CROSS CONNECTION DEVICE BOILERS X $6.00 = GREASE TRAP,SAND TRAP, 18 INTERCEPTORS CHEMICAL HOLDING TANK X $6.00 = 19 MEDICAL GAS(per outlet) NITROUS,OXYGEN X $6.00 = 20 MISCELLANEOUS PLUMBING FIXTURE if n)tj)J re, /S,%LrG6 2--- X $6.00 = 21 PRIVATE SEWAGE DISPOSAL/SYS X $20.00 = 22 INDUSTRIAL WASTE INTERCEPTOR X_ $15.00 = SUBTOTAL METHOD OF PAYMENT: PROCESSING FEE ❑CASH('CHECK D VISA ❑MC EXPIRES: $35.00 Card# VIN: TOTAL PERMIT FEE DUE: / AUTHORIZED SIGNATURE: / il ' Effective October 28,2007 P:\Community Development\Forms\Building forms\Plumbing Permit Application.doc • 00.°1"\awa. New project Project New pre-app meeting((("`---"' Spokane Transmittal Plan revisions City of Spokane Valley Transmittal Date: .0,0017alley Commuiutc Development Wednesday,April 30,2008 Department 11703 E.Sprague Ave,Suite B3 Spokane Valley,WA 99206 Phone:509.688.0036 Site Address: 12008 E 20TH AVE Project Number: 08001642 Parcel Number: 45281.0504 Zoning: R-2 Water District: Fire District: FD 01 Applicant: BERRY BUILT & DESIGN INC Owner: MURPHY, THOMAS R & SUSAN 204 S KOREN DR 12008 E 20TH AVE SPOKANE VALLEY WA 99212 SPOKANE, WA 99206-5709 (509) 534-5410 e-mail: e-mail: Contact: BERRY BUILT & DESIGN INC Occupant: 204 S KOREN DR e-mail: SPOKANE VALLEY WA 99212 (509) 534-5410 e-mail: Contractor: BERRY BUILT DESIGN INC Arch/Engineer: iL ;(, �`f� � _- 204 S KOREN I , ' SPOKANE VALLEY WA 99212 (509) 534-5410 NV," e-mail: I L3) / C_ f I, 1 In) I` I Project RELOCATE DOORWAY IN KITCHEN/ SHORTENED WAL'Ct NIGTi Description: Building Landuse Engineer Utilities Health Fire Dist Assessor APPLICATION PLANS Please send all plan review and project comments via e-mail to the highlighted individuals. I ( WHEN INTERIOR ALTERATIONS,REPAIRS OR ADDITIONS r REQUIRING A PERMIT OCCUR,OR WHEN ONE OR MORE SLEEPING ROOMS ARE ADDED OR CREATED IN EXISTING m o 8 DWELLINGS,THE DWELLING UNIT SHALL BE PROVIDED cp 0 WITH SMOKE ALARMS LOCATED AS REQUIRED FOR NEW -, tsk o -• DWELLINGS. , ' SMOKE ALARMS SHALL BE INTERCON- NECTED AND HARD WIRED IN SUCH A MANNER THAT THE ACTIVATION OF ONE 4I ALARM WILL ACTIVATE ALL ALARMS- w (BEDROOMS, AREAS APPROACHING l'Ii ro BEDROOMS , VAULTED CEILING ��'; WITH RISE OF 24" & ON EACH FLOOR) n15PL.AY Ar\\fA § L N L2 51AII;5 PN CUUN1�p I I?L'11?AC1"ANLL POO HALF WALL _N\1-1-19Y, L-------10 L� --1�0 LAI N��' Wi 1-0W11,15 O AG,C ;�' 69-Q1 �,_ WI1 A60V�1INU �/,r, / I ___ I � , 2 1 ' Z c,j E 1128 6C2 , 2- ,,, �' — —\ 52%" k9AI5C=� A11NCI off, „ f ____j____, ��" ;\ j O z� 5 56 27 �� y W/n I6 16 MIC{?U 12 ;„� ; o 8 �'CI' 30 _ _ ),.._____,/��� 21 -\� II” '� — �- / 6-� " 2 }' 5 i i • R 9 a 8 1_ � 6�V )88 264 I C1f;, H D V z �.. (---- , / / , ...F. . § z_. :, . \ , _---7 - C'ANT}?Y 26 I 6 I pN 36 I 25" �pp J •r X1-15TINCI WINDOW I'l,5 52,2; 17,5 3�},5 11111161111.11111111111 f�INING A - c' 5, 1 ---- ...x 61" ,' 1 CC) U o 165 " — MUI?HY F;517i \CF 0 • • • 5Cfl-�: Y4" =•-• i, 0' Al .. .F� :. ., i s. ..z ", .s t. .. R e...._ '! 1.. „ .-� .., .... 3 'tt :.> .a _ ea.i'.,. I ...i+fi: F Vii".TZ. �I:.;-... J n . .. - [,AY' „C1:. � :.. �.N �7 I�' £,� , . i-,.,: tk•.: .. r .�.. .. r- • „ .,. _, :. .. ,.3.x. .,.., ..r <... F.. +�..,-.... .r . . >xf.0 . . 9 :a k Fr. :'�`�: . ^r : ,,tn ',, ..,'• f3 .: :. :d4. >. r,§»,.., , ,, : ,. ,.., .e.. ,...,.<. . , ,d ,; .. _. ,..ar m e'. ': 'a xr ,e { , o,.. S t .. R, . ... . ,.: .� 1z i >r.ek�” >} � ,�Vit. r '� � k .u. r,. _:,,.�.. � f . wt..._ .. , ...,a'6 .k.,..., ..._ w2.. ., .. uF, may3yy ,.:�f.;. tb>i,k. ,fix ,� �.�:':. k.a ,;,,, dao.. ,., �. a., d ,., .._ . • � .:,. � .. �:, x • a; .f .,, , 3 r f. n .. :.;.,.,.. _. .;.,1 :�. ' s,i .:.., `3'u.yrr. . .�,f`.... a .f ,,.x•'g f .. M 1 t a a �_s I s.. . M Ah.. .:c ... _,.. .'i. .e , «f .. n `Ls. .. ,6-. :..Pr, _ •+•.". J.'c. . a:.�.' . .t . rf : �";� .. .., ,. � rr .,.:u �,rte ,,. F .,tn. . .: . , ak, `�.,, �,r , z .i•, w , i?u, r �'�<: , .,. �... .�` ..� ;,.�_.,IT _ epi. �- ..,�: �:' :...�.[ .: ..�. .. ; t, 3t.. ,r n <.. t..�. b w, xr "w..7�`tix., „ ,,: �.. �. „. ,,. « , .. ,. ..f,.n,. s, ,rs s„:��t_.'b .�. r_ ,... +t�. tt»�}y,, r ,. S ..a �- .�'"r�ia.—.. c .., t. , :c.... ,, .. ,,:, ..,.'ts9� ..f.. i ,z� �`il 7 +r. f '-# p ,64 F.n.,,,..,,. i , n.�4r ,.. .�., ,. ,. , , ,...... .. . r,�=.i, F....L... _ .. . wf. :. 'Pk` ... 1.. .a,::yy�� , -.r.:, .a•, c. Yr..: ....i ..., . ,,: ..�. .:, . ... .'' ... � ., � L��� as .: ., . �.i- e �. ..'4.. k, ltK, tr t i l ”;;'`:,,�t 'h� �, . .t: . ... :.ty ,. .... .,.. .•:- ,,rw. � r. .. a. ..).. "�. ,*�. :. ..i. �,a r. a.:. .t. S'_ ,L°. 1,t t :v�,,,..'rx :<:s . . s� �r' � , ,v. s 1 „. r � s� =„a. r ,S �• ., '; � -x... .�,,: ,:_, _.. ^4 � , ,_, ,u ., . „_. ::,::, �, ,.- .. : f „-0F ,, sid'.➢ k,. i; •a.� k a=:�„i Y�.s :;41 �,. . :.. ,. 1 h d rer L;Yu ,Pr,.. ,. ..,. �: ,�” Mk. .�, ,�. r •+ t.t. r t ,`i � '.' -.,.-..:.,-.%'-....,$.*,,,,,,,, ,..: ,:,. , .. ,. :;: . . �.n ,.•...., F7- ;.... t ,._,_, ,n 5 y::• a 6 5•i✓' �~s":,±��f�„ ,,^.. �+t ' �i°,'a •••••.,,,-,•• -...� ••`,•••'• ... ,. ! :,, ,. ,.•, �'v,.,.�'.`� i�';,.,., �. ;,# •, °L''.,..�, 1}•j b I'.',-.!-4.'X4 ,:_f, ,�.,'.q'�F) f„.� ,��@ Q t a :a':( a f At a:a,. „4.--,,,,,,,-.-:• ,,/-kL., -: .• r ,!3... x - n "1444,''i 4 '', V 4'..; #,w.�1^F ,:-}7 • dF ::ek�S�' � '.,'•'.i�'` !�r m,,,..,?. 'T 'i. f,'" F"1. : �.;. 1, iwY'IM1'. }„ •',. uv1.Ef 1"-• ���ym 3 i r ' f`.;;41,,,, ;' ,..i-'-,, ,,,•••,.'.-1., i";y':, ..,,�. " '..- � , * .... J. .:�:14 , %'� ' � #.,,4Ey 't�r.'�' , .�e� '..'.''':-.,t,4 4 P,'';'1,7- � t ,w t Y+�:J���� Via@; i. ” fJ9'�f ,� t t 'F t ,'.'4',10,„/.7,j,{;`,41' '.,t),,,.' t J� . . -: Kos. '''' 04-•d t YMY1k .w: 1 -;„,./.,4ti. �� V 3"•5"" 3�,�•• ,_tt a�-:• ... J 'ti4L''. 2Q .5i� ' ' 5' rt at 9 / y 7y. 7 ._.„,,._._.„......_„,„,,.....+...:__ _...„,,,„- I I�I tints d Pvt.t. �4 e „ -iii , t. -.1 f.,i 1-• : n , ,,,,,,,,, ,.. It , i FOR C,h0.NG ! I ! '4 pLlKra ,� , �, 04711, Q% tf it 6i i f �; — ; 11 n , 1 LAM �. �, i � .:' .. �., _. „� '� �� • Su J _ �y f� i -1 4'Nt6N 1� 1iR14Tt 'r :: ;, N n n ' rot.tt 1 r p F ,7GrnKG ,rAU. l i IS • :., f,t-• .•^-.moi''' �ii96�1, yt ,' /, ,.);•—• '�� It., .; 4 76 t SCANA' : '1 Stb'w? tit 8 Ot: lhl4l,VLf or ctR .a � tf i ' d. • I • y' iy; 4. 8 iC FsrB' i' } B« o. 1II , " ; 1 . .. s. _— �__ _ ¢— i 1 mor•.. ft , . • , , .. i : 1 .: _..., . . !i •8"x 4,•�: ,;! W A Li..4..4 Y• 1�1'! 1 , h • i ,y„y fel _ {�t .,.� — ' ;/r • !: CON'C, root ? 5TEPS, ."::J .� ' `t .__a. 't'.a '.,. t�%. _ Sh° 1JgQV GEA.'►.Ntlr'�tw� 1�k ,�... , �.>± � ovingeolimi_._.._..f,lMkgR'.S _ :SR }.+. 1!}kms s _...�d.�i�'.: .„, lY..,. VP... It „„;,-!',11,,,"%4 i� • ' T ty.•'1 ! , 4i ::,,,fiAlt r I } i i c e, avCR, �51tr 0Etkeen FrNT x '! ti ,1 QVRu �s • . yit •wnsH ( ar 5 ttr x i !' f �' y3 „.41.,tom �' `g 4 --' ---- •'?i .—...,... r{ - -.., 0 P {� ~••. \ �'�"s�, r.• ' • j RpNGLraM ! : t •' • I- WOOO setEGH 1 i,, Ira �.- 4, !'.''}"t 6 *”� / �. SI o�c t� tJ/ I � yt • , 3 I ro4 O,1LI.t //• 1 t / •r ti• p AHr B. e7DNR Wkl l r „� . i. Kt r�. ,t+l 1178 • 1 • N. � ; , w"g,I.,- 1� Y> Jri � 6 A �� • j 7 �j 1,1 1,; 4,T' - �'' F A �'.. t LY_. Rot?' .( � �IQ�� L; k 4. �r•�/ � �; !, �L.-. 1 grit$, ovki. 40=0" R g10.Or" 1 't .,",,,,,i;':'1.'.1';;',-1 ' ° " r: MNKp.ti: , t tiT t ' ' i ':''..4.%"', .,^. ,, t -f y,...:.+.k,. f tAB ti+>N4QER {'ni1. . 1t a Z/4 t 9�4', ; ' S 1 )MAN6 r Yt Ri4Y. t „}� g �, .--,GCVI'LAC9i BEAN g W 1 f .7 k BIKE IIS IQHIIt. a s „ �r -•Fo-. A/ .iME�'�.MM,; , .: :. ,} ..z+a,.. Via, rt . ` 12$ ray, t j r . t I �' a" ae.cKlraGa 4 :,. „ M b4, 1. s .. ii• `ti t . • n . ..b ..,,,,I...•,,,-,k-i45440.:,„nFc:t• 1 ...-.. ..j'. ,_, ,_ .. ,.m.+., ., . _ .. _ _ CITY COPY THIS BUILDING SUBJECT TO FIELD INSPECTION CORRECTIONS _ *OialcvN ,„0,01,1411ey REVIEWED FOR COD COMPLIANCE SPOKANE VALLE'[-€if'DIN DIVISION c), ham" For City Use Only „:,,,- - ".%A.poCITY OF ::, PLUS Project Number kaneProject Address ,, Valley®y 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. f rn çr Your application review TARGET DATE is - The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. > Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. > Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure,you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents,as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone,fax, email,or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE-APPLICANT PINK-BUILDING FILE REV 9/07