Loading...
2012, 10-03 Permit: SW-12002286 Sewer SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW-12002286 10/03/2012 Expiration Date: Project Description: SEWER CONNECTION Primary Contact: STOLZ INCORPORATED Project Name: WOLFCREST Applicant: STOLZ INCORPORATED Permit Type: SEWER Address: 3808 S CHAPMAN RD GREENACRES,WA 99016 Phone: 509-928-8621 Email: SITE INFORMATION: Site Address: 13807 E 20TH AVE Owner: CRABB,JARED S&HEATHER R Parcel Number: 45271.1247 Address: 13807 E 20TH AVE SPOKANE,WA 99216 Subdivision: Phone: Assessor's Description: VERA PT OF B193 S157.5FT OF E138FT OF Email: W496.63FT Inspection Area: Water District:Vera Fire District:Spokane Valley Fire Irrigation District#15 Zoning: Land Area:21735 Square Feet CONTRACTOR INFORMATION: General Contractor STOLZI*053N8 STOLZ INCORPORATED 3808 S CHAPMAN RD GREENACRES,WA 99016 509-928-8621 DETAILS: Class Type Quantity Unit Charge Value SEWER ALTERATION TO EXISTING 1 $125.00 $125.00 $125.00 FEE DETAIL: Processing-Utilities $25.94 Utilities Permit $125.00 Total Fee: $150.94 CONDITIONS: Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE.SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR&INDUSTRIES,INCLUDING THOSE RELATED TO TRENCH SAFETY. Date Printed:10/03/2012 07:24:58 Printed by:IIS APPPOOLWSP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW-12002286 10/03/2012 Expiration Date: FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED.PERMIT ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION.INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME.BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed:10/03/2012 07:24:58 Printed by:IIS APPPOOL\ASP.NET v4.0