Loading...
2006, 09-15 Permit App: 06003614 Pole Bldg Project Number: 06003614 Inv: 1 Application Date: 9/15/2006 Page 1 of 3 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: 30 X 60 POLE BUILDING Contact: LEMAY,DANIEL Address: 14805 E 20TH AVE C-S-Z: VERADALE,WA 99037 Setbacks:Front Left: Right: Rear: Phone: (509)927-6177 Group Name: Site Information: Project Name: Plat Key: 003136 Name: VERA CREST SUB District: F Parcel Number: 45261.1912 Block: Lot: SiteAddress: 14805 E 20TH AVE Owner:Name: LEMAY,DANIEL Address: 14805 E 20TH AVE Location::CSV VERADALE,WA 99037 Zoning: SFR Water District: Hold: ❑ Area: .00 Acres Width: 0 Depth: 0 Right Of Way(ft): 0 Nbr of Bldgs: 1 Nbr of Dwellings: 1 Review Flood Plain Released By: Originally Released: 9/12/2006 By: amblake Building Plan Review Released',By: Originally Released: 9/15/2006 By: TMELBOU Driveway/Approach Released By: Originally Released: 9/15/2006 By: amblake Landuse/Zoning/HE Conditions Released By: Originally Released: 9/12/2006 By: kkendall Operator: AMB Printed By: AMB Print Date: 9/15/2006 Project Number: 06003614 Inv: 1 Application Date: 9/15/2006 Page 2 of 3 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Sewer Review Released By: Originally Released: 9/15/2006 By: amblake Permits: ...v Building Permit Contractor: OWNER Firm: OWNER Phone: (000)000-0000 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation POLE BDLG U-1 VB 1,800 $34,200.00 1,800 $34,200.00 Totals: 1,800 $34,200.00 1,800 $34,200.00 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $492.25 ACCESSORY PLANS REVIEW 1 SELECT $123.06 WSBC SURCHARGE 1 SELECT $4.50 Permit Total Fees: $619.81 Operator: AMB Printed By: AMB Print Date: 9/15/2006 Project Number: 06003614 Inv: 1 Application Date: 9/15/2006 Page 3 of 3 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit (A)❑THE BULDING OFFICIAL IS AUTHORIZED TO REQUIRE THE PERMIT APPLICANT TO PROVIDE FEE REIMBURSEMENT TO THE CITY OF SPOKANE VALLEY FOR ANY PROFESSIONAL SERVICES REQUIRED OUTSIDE OF CITY STAFF REVIEW. (B)0 SOME EXAMPLES OF POTENTIAL OUTSIDE RESOURCES INCLUDE PLAN REVIEW, CONSTRUCTION INSPECTION AND SURVEYING. All driveway approaches to be constructed per Spokane County Standards as adopted by the City of Spokane Valley. Minimum of 7.5' from each property line,5' from crosswalks or intersection curb and minimum of 15' of separation between any two approaches. Flat portion of a residential approach to be minimum of 16'wide,maximum of 30'wide and combined approach width not to exceed 50%of total frontage. Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $619.81 $619.81 $0.00 $619.81 $619.81 $619.81 $0.00 $619.81 Disclaimer: Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: AMB Printed By: AMB Print Date: 9/15/2006 Project Number: 06003614 Inv: 1 Application Date: 9/11/2006 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project In formation: Permit Use: 30 X 60 POLE BUILDING Contact: LEMAY,DANIEL Address: 14805 E 20TH AVE C-S-Z: VERADALE,WA 99037 Setbacks:Front Left:lati Right: 12 / Rear:CJ' Phone: (509)927-6177 ( )&') (e) ) Group Name: Site Information: Project Name: Plat Key: 003136 Name: VERA CREST SUB District: F Parcel Number: 45261.1912 Block: i Lot: 1'2 SiteAddress: 14805 E 20TH AVE Owner:Name: LEMAY,DANIEL Address: 14805 E 20TH AVE Location::CSV VERADALE,WA 99037 Zoning: SFR Water District: 14coo xA Hold: ❑ Area: s— Width: 0 Depth: 0 Right Of Way(ft): 0 Nbr of Bldgs: 1 Nbr of Dwellings: 1 Review Flood Plain Released ` it 0 Building Plan Review Released';By: Driveway/Approach Released By: Landuse/Zoning/HE Conditions Released By: , r� na Sewer Review Releas:® <,,,„ ri Operator: AMB Printed By: AMB Print Date: 9/11/2006 crrch 6- Permit Center t' ( ,; ; ERMIT NUI��E � � 11707 E Sprab e Ave, Suite 106i I 0i ,I ,, Pc j Valley Spokane Valley, WA 99206 Ir----\'\. �_' 'PERMIT FEE: (509)688-0036 FAX: (509)681-07 SEP 16 • Community Developrnent ',N7v7v cPokanevalley Ora oom ( Residential Construction (")) I ,I 1 ' l�� IA '''-,--1:A ---DI Ne* `-o>�struclion ❑ Accessory Bldg Permit Application ❑ Addition/Remodel ❑ Deck , Other: Pctk is i t c i3c x6-C° SITE ADDRESS I T L..k-- ; - -- ASSESSORS PARCEL NO: a-f, iv j f), LEGAL DESCRIPTION: 1.: ..."';."-•_: ' .�w f Building owner Contractor. Name: y1.UL(_ Z---J L C f/ lo'.l% Name: Sy'4',(26 Address: �'8o" j J �L Address: City UG.i( ` Zip: '1 C) ? t City: Zip: _IPhone: 8t1 -°746--. Fax: ` %.iii► Phone: Fax: Lic No: . Exp.Date: Contact Person City Business Lic No: Name: Dan - . eC Ky/ L e P rc Phone: 891 -o talo gtycet1 Irl -`5jqe Describe the scope of work in detail: Cost of Project: Si 3 � cl r�;� ,- ryL w/Q (/ (.M%moi 4' �k� . l Z6 x.>r� 9t4.1 - ; C" --- P f B . $ /(t-L **************The foIIowing MUST be complete: (write N/A if not applicable********************** HEIGHT TO PEAK: DIMENSIONS: . #OF STORIES: TOTAL HA (TABLE SPACE: i 1 JO xeC Bra-AM Le.c/L( N ii MAIN FLOOR TO SQ. 2"" FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE FTG: 11 \` 11 NI A AREA: l V A- FINISHED BASEMENT GARAGE SQ. FTG: 6(4,, PATIO SQ. FTG: 30% SLOPES ON SQ. FTG: 1\; A /800 rtig ei ,'U A PROPERTY: V4 #OF BEDROOMS: A CONSTRUCTION TYPE: HEAT SOURCE: SEWER_OR SPP" ? NIp DISCLAIMER r poi ti I(�i11 A s wg IR The permitee verifies,acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling,the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances.6) Plans or additional information may be required to be submitted,and subsequently approved before this application be processed. (( nn Signature �l�� �'1 ltDate 1,41/ , : ' 1 Method of Payment: (Faxed permit applications will o ly be accepted with major bankcard) ❑ Cash ❑ Check ❑ Mastercard ❑ VISA ❑ Other Bankcard#: Expires: VIN#: Authorized Signature: REVISED 8/25/2005 • 30' x64' x14' Trusses 30'-0" 2' tails 4/12 pitch 30lb load 6 sets (5sets + 2ea gable ends) #2&:Better"PreS.Sirre Treated PT Poles 6x8 14/18' 6x6 2/18' 4x6 2/10' PT 2x10 8/10' 5/12' 2/14' #2&betters Fir„&&Earth_. ._,.z 2x4 filler 10/16' 2x4 rat run 10/12' 20/10' 2x8 Purlins 20/14' 22/12' 80/10' 2x8 Fascia 16/10' 2x8 Trimmers 1/14' 3/12' 1/10' 2x10 Headers 1/12' 1/14' 2x6 Girts ,24/12' 76/10' 3' wide x 29ga ptd metal panels Qty Length Total Roof 44 18.0833 795.7 TRIMS SW • 22 14 308.0 7 ridge 22 12 264.0 14 o/s cnrs GE 4 15 60.0 18 5-9/16"Open Jamb 4 16 64.0 29 C-metal 2 17 34.0 7 wallite 2 18 36.0 17 Base 2 9 18.0 7 7-3/8"jamb 2 10 20.0 2500 #9x1.5" screws roof 4 19 76.0 3000 #9x1.5" screws walls Soffit 4 13 52.0 8 11 88.0 2 18.0833 36.2 Grand Total 1851.8 Lft 5555 SqFt Roof panels 795.7 Ift 2387.0 sqft wall panels 1056.2,Ift Misc 3168.5 sqft 6' MBI 11/34' post concrete 4 sack Overhead doors Insulated nails $50 1ea 10'w x 8'h LU26 hangers 3 box 1 ea 12'w x 12'h 30 x 68 WD w/locks 2ea I n w : '14: °;i'l N. rot) 1i) 38 . kT100.001 `120. 00' . wit : 7 N 0.... MARCUS ri COURT -- Nt H 330.00il 0 in g1 , 11, ‘_ .,.. Alk?„ 0 i 0 3 .06 4 d CN! I o ?` v ,r ' Iw2 r ' " �;, 1' - € le 11 C ! 0 c 1 �� 1 . ►t . c i NORTHjZO " w 1 40. J } t �" NORTH 1 40,14. _100.0C 9 UTILITY et4 .. g :iii j... i p • 1111 i I 111 , A� / --i ! I �y i j + I. .. , -.. * I 114 uaa�... , .. - IY' / . ,*msspoilll. a ac) I J 'Pll 1 ..'el t 1 .. LEP .....- i 11111 1. �.._....._.�......._._ I i... ... 11■��6411Ilii ��11=�1111�� Mleb� LIN 111111MMEWAMPAMMEMEMMII MEMIlliMIMMIIIMMEMMMUNk ����� 1:�?\IE1����� 1111111111111111111.1111111111.1111 ME• a 1 - .. . , c7,- I - ........____ ...7. �;� QZa CQ9VI ,�� /14do S ( x00)2eQ2 - 1h -� 0 NI c) . ' ___ ____ --.............„..„ ......--•""---- . •-..._ ,.., .....-__-__ __.-......___.. .. _.......--, .1 % hi•,;?0-.0 )-V1 '"1 I 1.0-1 ) . . ....... ...... cn. . 1 1 . • (.3 . J._ ...: 11 t'D i .(, — ! ? k.•1 L r _ 1 i I ; .,. . 4-1.4. •J 0 4%.:..; .0 I P4)1Ctc t I - •,ft.. . i ..... /.,, „--,...•-./.,.._ r • 1 ..,..( • -„,„.. — —,4,......' ,...., ....... 0 ,•., •,.......-., . .:— t . . a , v (U TYPICAL GIRT CONNECTION V. NAILS EACH GIRT (FLAT) NOTES FOR FLOOR PLAN �1 INTERIOR FRAME WOOD POSTS, SEE POST SCHEDULE THIS SHEET GABLE WALL POSTS - 6' X 6' TYPICAL DOOR POSTS - 4' X 6' TYPICAL FOOTING DIMENSIONS, B + 1' 8'I D = 3' 0' MAXIMUM POST SPACING 12' 0' (3 PURLINS @ 24' O,C„ BEARING OR JOIST HANGERS (TYPICAL) a SPANS 12' TO 60' w w • a r rn A DOUBLE TRUSSES +DOLIBLE SINGLE TRUSS PLAN VIEW N.T.S. J (4 PATTERN FOR - 10' a NOTES FOR SECTION A -A w Sl TYPICAL PURLIN, SEE FLOOR N- P U J _ J Z w Z_P JC3 L) W .z-- _J0 dJ 0 > _JJ �J TO THE BOTTOM OF aw 2' X 6' @ 24' O.C., 12' BAYS aw �w DF -L #2 GIRTS FLAT @ 24' O. C. > E] U a- > D J o 1 D -_J o o ROOF FASTENED TO PURLINS WITH - 16' & 18' X w 1 1/2' LONG WDODFAST TEKS, X v XL.. WALLS FASTENED TO al In .cu-- Rl M (U (/1 0- 3'-0" a. W 1). KNEE BRACE REQUIRED WHERE SHOWN ON POST/FOOTING SCHEDULE, o w rn o 6 X 16 �o v 3.2•' by CO 8'-0" 10'-0" s"xs" 6"X6" 26" 26" Z) a. NO NO BRACE NOT REQUIRED AT GABLE END TRUSSES, -� - J 26" 28 No v U V) U 14'0" Z. Z 26" w z J za. CONNECTION = USE 3/4'0 THRU BOLTS, JF 16'-0" ell X8"W/2"xs" 26" T -O" NO EACH LOCATION. JU �~ s xvw/2^x6" d1 a-0•; as 1 12'-0" 20'-0" 6 X 10" W/2 X 6" 26 0_ NO U POST/FOOTING U41 - U ZD 30 8.40 PSF LIVE LOA --- - NO -- - rjI 12-0"-- X • 6" X 12"._ _ X C.) X. _.. NO---- cu (U . C3 6 X 12 W/2 X 6" 28 al NO 0.6 U N 24'4„ w m -28 _ W NO __ 0.56 n POST/FOOTING al V) LIVE LOE _ NO POST � m DOUBLE TRUSSES +DOLIBLE SINGLE TRUSS PLAN VIEW N.T.S. PURLIN CONNECTION METHODS: A), PURLINS MAY BE HUNG OFF THE TRUSS TOP CHORD FACES W/ STANDARD SIMPSON JOIST HANGERS OR EQUAL. B), PURLINS MAY BE BUTTED AND NAILED W/(2) 16d NAILS INTO EACH PURLIN. C). PURLINS MAY BE LAPPED AND NAILED W/(3) 16d NAILS ON CONNECTION METHODS 'B' AND 'C', TOENAIL BACK SIDE OF PURLIN W/(1) 16d NAIL INT❑ EACH TOP CHORD MEMBER S1 NOTES FOR CONNECTION DETA-L S1 TRUSS TOP CHORDS TRUSS DESIGN BY TRUSS MANUFACTURER PURLIN SUPPORT STRUT 2' X '4' X FULL P�RS2kIN DEPTH OF TOP CHORD PLUS PURLIN. NerHp� NgfCrloN NAIL PURLINS W/(3) 16d NAILS S3 NAIL STRUT TO TOP CHORD W/(3) 16d NAILS EACH SIDE. 9MANUFACTURED TRUSS, NOTCH POSTS 1-1/2' EACH SIDE TO PROVIDE TRUSS SEAT. 10 SS WOOD POST, SEE POST/F[]OTING SCHEDULE. IN S6 4 - 40d GALV. NAILS IN PRE -DRILLED HOLES NCoDONBCCr�0N OR 3/4`0 MACHINE BOLT 0 SOLID BLOCKING AT CONNECTION POINTS. 9TYP, PURLIN, SEE FLOOR PLAN FOR SIZE 0 2' X 6' OR 2' X 8' TOP GIRT ?'lli>° _Ivcr,r._ S1 4 - 16d NAILS OR 3/4.0 M, BOLT DETAIL 1 - TRUSS COLUMN CONNECTION, PURLIN SUPPORT N.T.S. (j 1" 1# �1 2 - 16d NAILS 6, 8" 0 10" POST z - PATTERN FOR j2EAIL�� 10' HEADER UP NOTES FOR SECTION A -A 2' X Sl TYPICAL PURLIN, SEE FLOOR POST U PLAN FOR SIZE 2' X L) W 0 TRUSS DESIGN BY OTHERS 0 LD S3 2' X 6' @ 24' O.C., 10' BAYS TO THE BOTTOM OF ca 2' X 6' @ 24' O.C., 12' BAYS x W o= DF -L #2 GIRTS FLAT @ 24' O. C. HEIGHT OF COLUMN E] U Sa CONCRETE FOOTING, SEE SCHEDULE HEIGHT W/ 2' X 6' FACER. SS EXTEND POST TO TOP OF PURLIN 6' % W W ROOF FASTENED TO PURLINS WITH - 16' & 18' 0 1 1/2' LONG WDODFAST TEKS, HEIGHT W/ 2' X 8' FACER. WALLS FASTENED TO DOUBLE 2' X 6' KINGPOST GIRTS WITH 1' LONG 20 - 3'-0" WOODFAST TEKS. 1). KNEE BRACE REQUIRED WHERE SHOWN ON POST/FOOTING SCHEDULE, 10 -0" --10'-0" 20'-0" PURLIN CONNECTION METHODS: A), PURLINS MAY BE HUNG OFF THE TRUSS TOP CHORD FACES W/ STANDARD SIMPSON JOIST HANGERS OR EQUAL. B), PURLINS MAY BE BUTTED AND NAILED W/(2) 16d NAILS INTO EACH PURLIN. C). PURLINS MAY BE LAPPED AND NAILED W/(3) 16d NAILS ON CONNECTION METHODS 'B' AND 'C', TOENAIL BACK SIDE OF PURLIN W/(1) 16d NAIL INT❑ EACH TOP CHORD MEMBER S1 NOTES FOR CONNECTION DETA-L S1 TRUSS TOP CHORDS TRUSS DESIGN BY TRUSS MANUFACTURER PURLIN SUPPORT STRUT 2' X '4' X FULL P�RS2kIN DEPTH OF TOP CHORD PLUS PURLIN. NerHp� NgfCrloN NAIL PURLINS W/(3) 16d NAILS S3 NAIL STRUT TO TOP CHORD W/(3) 16d NAILS EACH SIDE. 9MANUFACTURED TRUSS, NOTCH POSTS 1-1/2' EACH SIDE TO PROVIDE TRUSS SEAT. 10 SS WOOD POST, SEE POST/F[]OTING SCHEDULE. IN S6 4 - 40d GALV. NAILS IN PRE -DRILLED HOLES NCoDONBCCr�0N OR 3/4`0 MACHINE BOLT 0 SOLID BLOCKING AT CONNECTION POINTS. 9TYP, PURLIN, SEE FLOOR PLAN FOR SIZE 0 2' X 6' OR 2' X 8' TOP GIRT ?'lli>° _Ivcr,r._ S1 4 - 16d NAILS OR 3/4.0 M, BOLT DETAIL 1 - TRUSS COLUMN CONNECTION, PURLIN SUPPORT N.T.S. (j 1" 1# �1 2 - 16d NAILS 6, 8" 0 10" POST FOOT BUILDING SECTION A -A N.T.S. SINGLE OVERHEAD DOOR OPTION FRONT ELEVATION N.T.S. NOTES FOR FRONT ELEVATION S1 HALF TRUSS DESIGN BY OTHERS SUPPORT PURLINS @ END TRUSS W/2' X 6' OR 2' X 8' STD JOIST HANGERS, LOWER TRUSS FOR END OVERHANG, IF READ 0 2' X 10' HEADER S3 2' X 6' GIRTS @ 24' O.C., 10' BAYS, DF -L #2 2' X 6' GIRTS @ 24' O.C., 12' BAYS, DF -L #2 S4 2' X 8' FACIA BOARDS SS TREATED WOOD POSTS, SIZED PER SCHEDULE S6 TREATED 2' X 6' BOTTOM GIRT OR TREATED 2' X 10' BOTTOM GIRT MOTES FOR FOOTING DETAIL S1 TREATED POSTS AS SIZED PER SCHEDULE 32 VIBRATE OR ROD CONCRETE TO OBTAIN FULL BEARING C3 UNDISTURBED SOIL FOOTING DETAIL N.T.S. 8 16d NAILS 2' X 6' X BOLTING BL GABLE END DOUBLE OVERHEAD DOOR OPTION OPTIONAL FRONT ELEVATION N.T.S. SINGLE SLIDING DOOR OPTION yP i iy�-A Fr � Iy -- L�VAT�N N.T.S. OPTIONAL FRONT ELEVATION N.T.S. 16d NAILS �--CORNER POST 16d NAILS 2' X 6' X 18' BOLTING BLOCK DETAIL 3 TYP, GABLE END TRUSS CONNECTION USE BOLTING BLOCKS BELOW ALL CORNER COLUMN GIRTS SPLIT SLIDER DOOR ❑PTI❑N OPTIONAL FRONT ELEVATION N.T.S. NOTES FOR OPTIONAL FRONT ELEVATIONS S1 HALF NAILING PATTERN FOR j2EAIL�� 10' HEADER UP TO 12' 0' DOORS 2' X 12' POST LAMINATIONS SPACING 2' X NOTE: 2" X 6" LAMINATE MUST BE A TREATED MEMBER 0 2' X AND MUST EXTEND TO THE BOTTOM OF THE FOOTING. 0 4' % LAMINATE MAY BE SPLICED ABOVE MID HEIGHT OF COLUMN FOOT BUILDING SECTION A -A N.T.S. SINGLE OVERHEAD DOOR OPTION FRONT ELEVATION N.T.S. NOTES FOR FRONT ELEVATION S1 HALF TRUSS DESIGN BY OTHERS SUPPORT PURLINS @ END TRUSS W/2' X 6' OR 2' X 8' STD JOIST HANGERS, LOWER TRUSS FOR END OVERHANG, IF READ 0 2' X 10' HEADER S3 2' X 6' GIRTS @ 24' O.C., 10' BAYS, DF -L #2 2' X 6' GIRTS @ 24' O.C., 12' BAYS, DF -L #2 S4 2' X 8' FACIA BOARDS SS TREATED WOOD POSTS, SIZED PER SCHEDULE S6 TREATED 2' X 6' BOTTOM GIRT OR TREATED 2' X 10' BOTTOM GIRT MOTES FOR FOOTING DETAIL S1 TREATED POSTS AS SIZED PER SCHEDULE 32 VIBRATE OR ROD CONCRETE TO OBTAIN FULL BEARING C3 UNDISTURBED SOIL FOOTING DETAIL N.T.S. 8 16d NAILS 2' X 6' X BOLTING BL GABLE END DOUBLE OVERHEAD DOOR OPTION OPTIONAL FRONT ELEVATION N.T.S. SINGLE SLIDING DOOR OPTION yP i iy�-A Fr � Iy -- L�VAT�N N.T.S. OPTIONAL FRONT ELEVATION N.T.S. 16d NAILS �--CORNER POST 16d NAILS 2' X 6' X 18' BOLTING BLOCK DETAIL 3 TYP, GABLE END TRUSS CONNECTION USE BOLTING BLOCKS BELOW ALL CORNER COLUMN GIRTS SPLIT SLIDER DOOR ❑PTI❑N OPTIONAL FRONT ELEVATION N.T.S. NOTES FOR OPTIONAL FRONT ELEVATIONS S1 HALF TRUSS DESIGN BY OTHERS S2 2' X 10' HEADER UP TO 12' 0' DOORS 2' X 12' HEADER UP TO 20' 0' DOORS SPACING 2' X 12' BACKED WITH 2' X 6' UP TO 24' 0' 0 2' X 6' HEADER 6" X 6"18 ell X6" - - 0 4' % 6' DOOR POST - 8' THRU 14' 10,-0' WAL-L HEIGHT W/ 2' X 6' FACER. X-C" 6' % 6' DOOR POST - 16' & 18' 6 X V VVIV X 6" ell xell WALL HEIGHT W/ 2' X 8' FACER. 5 DOUBLE 2' X 6' KINGPOST v x10 _ ►: 0 I cn i NOTES FOR DETAIL 2- KNEEBRACE ru�urwII TRUSS WEB BRACING NU GJULt 12 -24 3-0' &KPSF LIVE POST COLUMN FOOTING WILL OFTEN NEE BRAC Sl TRUSS TOP CHORD, DESIGN BY OTHERS SPACING 'H" I WXD "B" DIA. T" REQUIRED 10'-0' 101-0' V-0" 10'-0" 6" X 6"18 ell X6" - - 1a T -O" 3'-0" NO No S2 TRUSS BOTTOM CHORD, DESIGN BY OTHERS S3 2' X 6' DF -L #2 EACH SIDE 10,-0' 12.0^ ell X 6" - 1V X-C" No S4 WOOD POST, SEE POST/FOOTING SCHEDULE 10'-0' 10'-0' 14%0" lel-0^ 6 X V VVIV X 6" ell xell 18 20 T.& a-0" NO No SS 4 - 16d GALV. NAILS, EACH SIDE 1a-0" 18'-0" v x10 _ 20 - 3'-0" NO 1). KNEE BRACE REQUIRED WHERE SHOWN ON POST/FOOTING SCHEDULE, 10 -0" --10'-0" 20'-0" 6 X 16 21.;3'-0" 3.2•' NO 12-0" 12-0" 8'-0" 10'-0" s"xs" 6"X6" 26" 26" -y:67i a-0" NO NO BRACE NOT REQUIRED AT GABLE END TRUSSES, 12-0" 17.6^ ell X6^wn'X6" 26" 28 No 2). ALTERNATE KNEE BRACE/POST AND TRUSS/POST 12-0" 14'0" 6"X6"w12"Xs" 26" v -o" - NO CONNECTION = USE 3/4'0 THRU BOLTS, 12-0" 16'-0" ell X8"W/2"xs" 26" T -O" NO EACH LOCATION. 12-6" 18'-0" s xvw/2^x6" 29 - a-0•; No NO 12'-0" 20'-0" 6 X 10" W/2 X 6" 26 T-2" NO - NO POST/FOOTING U41 - SCHEDULE 30' SPANS 30 8.40 PSF LIVE LOA N.T.S. BUILDING SPECIFICATIONS: GENERAL - ALL BUILDING CONSTRUCTION SHALL CONFORM TO THE 2003 EDITION OF THE INTERNATIONAL BUILDING CODE (IBC 2003), AND ALL STATE & LOCAL BUILDING CODES. THESE SPECIFICATIONS AND PLANS ARE INTENDED FOR USE IN 30 OR 40 PSF LIVE LOAD, 85 MPH WIND SPEED, EXPOSURE B AND SEISMIC DESIGN CATEGORY C. DESIGN LOADS - ROOF LL = 30 OR 40 PSF ROOF DEAD LOAD = 5 PSF* CEILING LL = 0 PSF CEILING DL = 1 PSF * ROOF DL ALLOWS FOR A MAXIMUM OF 3" THICKNESS OF FIBERGLASS INSULATION. * MAXIMUM SOIL BEARING PRESSURE = 2,000 PSF MAXIMUM SOIL BEARING PRESSURE IS BASED ON SAND, SILTY SAND, CLAYEY SAND, SILTY GRAVEL AND CLAYEY GRAVEL SOILS OR BETTER. LESSER SOIL CONDITIONS WILL REQUIRE REVIEW AND FOOTING SIZE ADJUSTMENT BY THE ENGINEER. CONCRETE - MINIMUM 28 DAY COMPRESSIVE STRENGTH F'a = 2,000 psi, 4 SACK MIX FOR FOOTINGS. CAST IN PLACE CONCRETE CONSTRUCTION SHALL CONFORM TO ACI 318-99. WOOD - STRUCTURAL LUMBER SHALL CONFORM TO DF -L #2 OR BETTER BY WWPA GRADING RULES. MAXIMUM MOISTURE CONTENT SHALL BE 19% BY WEIGHT. NAILING SHALL CONFORM TO TABLE 2304.9.1 FASTENING SCHEDULE & OTHER APPROPRIATE SECTIONS OF CHAPTER 23 OF THE IBC. ALL NAILS INTO PRESERVATIVELY TREATED WOOD SHALL BE HOT -DIPPED ZINC COATED GALVANIZED STEEL, SILICONE BRONZE, COPPER OR STAINLESS STEEL. CCA TREATED WOOD SHALL CONFORM TO THE REQUIREMENTS OF AWPA STANDARDS C-16, C-22, C-23, C-24 & C-28. POSTS FOR BUILDINGS SHALL BE AS NOTED ON THE PLANS. ALL POST MATERIALS SHALL BE HEM -FIR #2 OR BETTER, FULL DIMENSION AND GRAINED BY WWPA GRADING RULES. HARDWARE SHALL BE SIMPSON OR APPROVED EQUAL. ALL BOLTS SHALL CONFORM TO ASTM .4307. METAL PANELS MAY BE DELTA RIB STYLE, GALVANIZED OR PAINTED, 29 GAUGE THICKNESS, ASTM A653 STRUCTURAL QUALITY (SQ), Fy = 80.0 kst. ROOF PANELS SHALL BE FASTENED TO PURLINS WITH PLATED, GASKETED 1 1/2" LONG METAL TO WOOD FASTENERS. WALL PANELS SHALL BE FASTENED TO GIRTS WITH PLATED GASKETED 1" OR LONGER METAL TO WOOD FASTENERS. PANELS SHALL BE INSTALLED AND FASTENED ACCORDING TO THE MANUFACTURER'S RECOMMENDATIONS. SOIL COMPACTION - ALL BACKFILLED SOIL BENEATH FOOTINGS SHALL BE COMPACTED WITH A VIBRATORY COMPACTOR TO 95% OF THE PROCTOR DENSITY AS DETERMINED BY ASTM A1557, METHOD D. TRUSSES SHALL BE DESIGNED BY AND BEAR THE SEAL OF AN ENGINEER REGISTERED TO PRACTICE IIT THE STATE IN WHICH THE BUILDING WILL BE CONSTRUCTED. TRUSS LOADING: TOP CHORD LIVE LOAD = 30 OR 40 PSF TOP CHORD DEAD LOAD = 5 PSF BOTTOM CHORD DEAD LOAD = i PSF 0L". -BRACEL-BRACE TRSS WEB MEMBER TRUSS WEB MEMBER THE FOLLOWING MINIMUM ROOF DIAPHRAGM REQUIREMENTS ARE NEEDED • ROOF STEEL- 29 GAUGE GRAND -RIB III, 36' WIDTH OR EQUIVALENT ■ FIELD SCREWS. 010 x 1 1/2' AT 9' O.C. (NEXT TO HIGH RIB) • EAVE AND RIDGE PURLIN SCREWS, #14 xl 1/2' AT BOTH SIDES OF EACH MAJOR RIB THE FOLLOWING MINIMUM ENDWALL DIAPHRAGM REQUIRMENTS ARE NEEDED ■ ENDWALL STEEL 29 GAUGE GRAND -RIB III, 36' WIDTH OR EQUIVALENT • FIELD SCREWS 010 x 1 1/2' @ 9- D.C. (NEXT TO HIGH RIB) • BASE GIRT, END TRUSS, AND DOOR HEADER SCREWS, #14 x 1 1/2' E BOTH SIDES OF EACH MAJOR RIB. SECTION B -B SECTION B -B DIAPHRAGM SCREWS AT INTERIOR TRUSSES AT GABLE END TRUSS "4ry_ Irk IG S1 S3 B < 11-- S4 TYPICAL TRUSS BOTTOM CHORD BRACING NOTES FOR TRUSS BOTTOM CHORD BRACING N.T.S. S1 GABLE END TRUSS S2 DOUBLE INTERIOR TRUSSES S3 2' X 4' X -BRACING @ 10' 0' O.C. S4 2' X 4' BOTTOM CHORD BRACING @ 10'-0' O.C. OR, AS SPECIFIED BY TRUSS MANUFACTURER SS TOENAIL BRACES TO TRUSSES WITH 3 - 1Dd NAILS TYPICAL SIDE ELEVATION NOTES FOR SIDE ELEVATIONN.T.S. S1 2' X 8' HEADER S2 2' X 10' HEADER FOR 10' & 12' SLIDING DOORS 2' X 8' HEADER FOR 8' & SMALLER SLIDING DOORS DIAPHRAGM SIREWS E ENDWALL BASE GIRT ACROSS ENDWALL DIOR HEADERS 6 GABLE END TRUSS TOP CHORD, EAVE & RIIGE PURLINS ON ROOF DIAPHRAGM SCREWS: TYPICAL SCREW PATTERN, EXCEPT AS NOTED ABOVE 0.20 0.20 0.20 0.20 0.24 0.24 0.27 0.41 0.41 0.41 0.41 0.41 0.41 CONCRETE -0' TRUSS WEB BRACING 26 3-0' INTERIOR OR GABLE END TRUSSES -NEITES ES r R I ICU` Y� " DR,-,�.�r�� --_ TRUSS DIAGRAMS WILL OFTEN REQUIRE WEB MEMBER BRACING, WHICH IS SHOWN ❑N TRUSS DRAWINGS Ais THE METHOD OF TRUSS WEB BRACING SHOWN ABOVE REPLACES 1' X 4' OR 2' X 4' WEB MEMBER BRACING FOLLOW THESE INSTRUCTIONS FOR ALL WEB MEMBER BRACING TO REPLACE 'RAT -RUN' WEB 10 -0" Od ' NAILS @ 6' O.C. X 6' OR 2' X 8' Od NAILSO.C. X 4' 0L". -BRACEL-BRACE TRSS WEB MEMBER TRUSS WEB MEMBER THE FOLLOWING MINIMUM ROOF DIAPHRAGM REQUIREMENTS ARE NEEDED • ROOF STEEL- 29 GAUGE GRAND -RIB III, 36' WIDTH OR EQUIVALENT ■ FIELD SCREWS. 010 x 1 1/2' AT 9' O.C. (NEXT TO HIGH RIB) • EAVE AND RIDGE PURLIN SCREWS, #14 xl 1/2' AT BOTH SIDES OF EACH MAJOR RIB THE FOLLOWING MINIMUM ENDWALL DIAPHRAGM REQUIRMENTS ARE NEEDED ■ ENDWALL STEEL 29 GAUGE GRAND -RIB III, 36' WIDTH OR EQUIVALENT • FIELD SCREWS 010 x 1 1/2' @ 9- D.C. (NEXT TO HIGH RIB) • BASE GIRT, END TRUSS, AND DOOR HEADER SCREWS, #14 x 1 1/2' E BOTH SIDES OF EACH MAJOR RIB. SECTION B -B SECTION B -B DIAPHRAGM SCREWS AT INTERIOR TRUSSES AT GABLE END TRUSS "4ry_ Irk IG S1 S3 B < 11-- S4 TYPICAL TRUSS BOTTOM CHORD BRACING NOTES FOR TRUSS BOTTOM CHORD BRACING N.T.S. S1 GABLE END TRUSS S2 DOUBLE INTERIOR TRUSSES S3 2' X 4' X -BRACING @ 10' 0' O.C. S4 2' X 4' BOTTOM CHORD BRACING @ 10'-0' O.C. OR, AS SPECIFIED BY TRUSS MANUFACTURER SS TOENAIL BRACES TO TRUSSES WITH 3 - 1Dd NAILS TYPICAL SIDE ELEVATION NOTES FOR SIDE ELEVATIONN.T.S. S1 2' X 8' HEADER S2 2' X 10' HEADER FOR 10' & 12' SLIDING DOORS 2' X 8' HEADER FOR 8' & SMALLER SLIDING DOORS DIAPHRAGM SIREWS E ENDWALL BASE GIRT ACROSS ENDWALL DIOR HEADERS 6 GABLE END TRUSS TOP CHORD, EAVE & RIIGE PURLINS ON ROOF DIAPHRAGM SCREWS: TYPICAL SCREW PATTERN, EXCEPT AS NOTED ABOVE 0.20 0.20 0.20 0.20 0.24 0.24 0.27 0.41 0.41 0.41 0.41 0.41 0.41 CONCRETE 0.47 0,47 0.47 0.47 0.47 0.47 0.47 0.47 0.50 0.62 0.62 0.62 0.62 0.62 0.62 0.62 0.66 0.68 CONCRETE GLUME, YD 0.55 0.55 0.55 0.65 0.55 0.56 0.56 0.65 0.56 0.66 0.66 0.66 0.66 0.66 0.66 0.70 0.72 SPACING -0' ell X 611 26 3-0' NO -- 0.41 10-0" 10-0" ell X Si, 6 x6 34' NO 0.41 10;4' 12 -0" 6 X 6 W12" X 6" 26 x w NO__ 0.41 10 -0" 14 -0" ell X 6" W/2" X 6" 26" T -O" NO 0.41 10'-0" 16'-0" --- 6" X 8" _ _ 26" O- 3'-0" _ NO - 0.41 10'-0" - 18'.0" 6 X 8 W!2" X 6 26 3 -0" NO 0.41 10'-0" 20'4" 6" X 8" w2" X 6" - - - 26" 3'-0" _ NO 0.41 10 -0" --10'-0" 2T-6';6" X 10 W/2 X 6" _. 28 - 3.2•' NO .._.._... 0.44 10'-0" _. 24'-0" _ 6 X12"-- -26 _ 33" NO 0.45 12-0" 8141 611 X 6" 28 T -O" NO 0.47 12-0" 10'-0" - 6" X 6" - _ 28" 3'-0" _ _ _ NO 0.47 12-0" 12'-0" G" X W. W/2" X 6" - 26" T -V -_-- NO 0.47 12-0" 14'-0" 6 X 8 28 T -O" NO 0.47 12-0- " 16'-0" - - 6 X8' W/2" X 6" -- 28 - 3'-0" - NO 0.47 U41 - 161-011 6" X 10" - ---- ----- -- 28" ... 3'-0" --- - NO -- - 0.47 12-0"-- 20'-0" 6" X 12"._ _ -_ 28" - T -O"- _.. NO---- 0.47 12-0" 22 -V 6 X 12 W/2 X 6" 28 T-2" NO 0.6 12-0" 24'4„ 6" X 12" - _. -28 _ -3'F" NO __ 0.56 0.47 0,47 0.47 0.47 0.47 0.47 0.47 0.47 0.50 0.62 0.62 0.62 0.62 0.62 0.62 0.62 0.66 0.68 CONCRETE GLUME, YD 0.55 0.55 0.55 0.65 0.55 0.56 0.56 0.65 0.56 0.66 0.66 0.66 0.66 0.66 0.66 0.70 0.72 SPACING "H" -0" 6" X 6" 28" T.0" NO 10'-0" 10°4" 10-0" 6 x6 - 28'iT.6" NO NO _ 10'-0" 10'-0" 12-0" vi Xiii W/2'XSi. 28 3-0" NO 10'-0" 101-01, - 14 -0" 6 X 6 W/2" X 6" _ 48 T -O" _ NO 10-0" 10:4:-- 16'-0.: 6„ X 8,' 26" 3'-0" 0.70 10 -0" 18 -0" v X 8 1N/2" X 6 28 -3'-0" NO 10'-0" 10'.0" 2W -O" 6 X 10" 28 3'-0" NO 10'-0" 10'-0" 22'-0" 6 X 10" W/2' X_ 6" 28 3'-0" NO 10'-0" 10'-0" 24'-0" 6" X 10" W/2" X 6" 1 28" 3'-2" -- YES - 10'-0" 12-0" 8'-0" 6 X 6" 32" T -O" NO 10'-0" 12-0' 104- 8 X6 -- 32 3.-0" _ NO 12-0" 12-0' 12-0' v X svpWIT; X6 32 34" _ NO 12-0" _ 124' 14-0' 6 i8 32 3 -V NO 12-0" 12-0" 16 -0' V X 6;'W12" X 6 _ 32 3 -0" NO 12-0" 12-0" 184' r X10 _ 32 3-0" NO 12-0' 12-0" 20'-0" - - 6" X 10" W/2" X 6" - 32" 3'-0" NO _ 12-0" 12-0" 22'-0" 6" X 12" 32" 3'-2" NO 12-0" 12-0" 1 24'-0" 6" X 12" W/2" X 6" 32" 1 3'3" NO U-6" POST/FOOTING SCHEDULE 40' SPANS, 30 & 40 PSF LIVE LOE _ NO POST COLUMN FOOTING KNEE BRA( 36" SPACING "H" WXD "B" DIA. "T' REQUIRES 10'-0" 8'-0" 6" X 6" -- 30" T -O" NO 10'-0" 10'-0" 6" X 6" 30"- T-6" NO 104" 12-0" 6 x v W/2"X6" 30 3-0' _ NO 10 -V 14!-0" 6 X 6 W/2" X 6"30 T -O" NO 10'-0" IV -o,- 6" X 8" 30" T -O" YES - 10'-0" 16'-0" 6 X 8" Wl2" X 6" 30' 3'-0" _ NO - 10'-0" 18--0" 6" X 8" wa, X 6" 30" T.0" NO 10'-0" 20'-0" VX10"- _ _30"- T -we -__ NO - 10' -0" 22'-0" 6" X 10" W/2" X 6" 30" T -O" NO - 10'-0" 24'-0" 6" X 12" 30" 3'•2" YES - 12-0" 8'4" 6" X 6" 33" T -O" NO 12-0" 10'-0" 6" X 6" 33" T -O" NO 12-0" 12'-0" 6 X 6 W/2" X 6" 33 3'-0" NO U -O" IN -O 6 XS" 33' T -O" NO 12-0" 16'-0" 6" X 8" W/2" X V 33" T-0" NO - -. J( 10'•.. I_ 33. 3-0„ NO 12' 01 20'-0" 6 X 10" W/2" X 6" 33" 3'-0" NO 124" - 22'4" G" X 12" 33" T.2" NO 12-0" 24'-0" 6". X 12" W/2" X 6" 33" T-2" - --_.. NO -- POST/FOOTING SCHEDULE 48' TO 62' SPANS, 30 & 40 PSF LI' 0.47 0,47 0.47 0.47 0.47 0.47 0.47 0.47 0.50 0.62 0.62 0.62 0.62 0.62 0.62 0.62 0.66 0.68 CONCRETE GLUME, YD 0.55 0.55 0.55 0.65 0.55 0.56 0.56 0.65 0.56 0.66 0.66 0.66 0.66 0.66 0.66 0.70 0.72 SPACING "H" I WXD "B" DIA. 'T' I REQUIRED VOLUME, YD3 10'-0" 8'-0" 6" X 34" T -O" NO 0.70 10'-0" 10'-0" - 6" X 61. 34" T -O" NO 0.70 10'-0" 12'-0" 6 X 6 Wl2" X 6" 34 3;-b;'- _ _ _ NO 0.70 10-0" 14-0' 6 X6 W/2"X6" -61, 34 3-0' _. NO 0.70 X 81, 34 T -O" YES 0.70 10'-0" 16 -0" 6 X 8' W/2" X 6" 34 T -O" NO 0.70 10'-0" 18'-0"6,; X 8' VV/2"X V 34" T-0" NO 0.70 10'-0" 204" 6" X 10" _ -- - 34" .. 3'-0" YES 0.70 10'-0" 22'-0" - 6" X 10" W/2" X 6" 34" 3'-0" NO 0.70 10'-0" 2X -O" 6" X 12" VV/2"X 6" 34" T.0" _ _ YES 0.70 12-0" 8'_w 6" X 6" 36" T.0" NO 0.79 12-0" _ 10'-0" _ .. 6" X 6" Wl2" X 6" _ 36" 3'-0" __ _ _ _ NO 0.79 12-0" 12'-0" 6" X 6" W12" X 6" __ 36" -- 3'-0" - -- NO 0.79 12-0" 14'-0" 6" X 8" 36" 3'-0" NO 0.79 12-0' 16 -0' 6 X 811 W12r1 X ell 36 3%& _ NO - 0.79 _ 12-0" 18 -0' 6 X 10 36 3 -0" _ YES - 0.79 12-0" 20-V 9"X 10"/2 WX 6" _ 36 3 -0" _ NO 0.79 U-6" 2T-0' V X 12" W12 X 6" 36ii 31-21, _ NO 0.83 12-0" 24'-0" 6" X 12" W/2" X 6" 36" 3'-2" NO 0.83 POST/FOOTING SCHEDULE 54' TO 60' SPANS, 30 & 40 PSF LIVE LOAD SPACING "H" I WXD "B" DIA. "T' I REQUIRED IVOLUME, STEEL ,SHEETING SCREW PATTERNS 1�'-0" a'-0" 6"X6" 36" 3'-0" NO 0.79 N.T.S 101-0.. 101-01. 6 X ell - 36 3 -0" NO 0.79 -0 10'" 12'-0" 6" X 6" W/2" X 6" mitw-w NO _ 0.79 10--0" 14--0" V X 8" _. 36" 3'-0" __ NO 0.79 - 9 - - - 10'-0" 16'-0" 6" X 8" W/2" X 6" 36" 3'-0" NO 0.79 10'-0" 18'-0" 6" X 10" 36" 3'-0" NO 0.79 10'-0" 20%0"6" X 10" W/2" X 6" 36" 3'-0" YES 0.79 10'-0" 2T-0" 6 X 10" W/2 X 6" 36 3'-0" NO _ 0.79 10'-0' 1 24'-0" 6" X 12" 36" 1 314" NIES 0.83 12-0" 81-0" 6" X 6" 40" T -O" NO 0.97 _" - --- --X611------._ - ---- - --- -- - --- 12-0" 10'-0" 6" X 6" W/2" X 6" 40" 3'-0" NO 0.97 - - - 811X6 - -- - - - - - 1 6 2-0" 12'-0" " X " 40" 3'-0" 11X6- NO ._. 0.97 - - - - - 11X6- -- - 11X6- - 12-0" 14,-0„ 6" X 8" W/2" X 6" 40" 3'-0" 11X6- NO 11X6 0.97 12-0" 16'4" 6" X 8" W/2" X 6" 40" T -O" NO 0.97 11X6- -11X6 - --- 12-0" 18'-0" 6" X 10" 40" 3'-0" YES _ 0.97 12-0 20'-0" V X 10" W/7' X 6" - 40" - - 3'.0" - - NO _ 0.97 12-0"22-0" 6 X 12" W/2 X 6" 0 - 3'-0" - 4NO _ 0.97 _. - - - - 12-0" 24'-0" 6' X 1 2" W/2 X 6" 40 3'•2"2" NO 1.03 NOT£: y .. 1. THENEXTLARGER SIZE POST MAY BE SUBSTITUTED FOR POSTS WITH 2" X 6" LAMINATIONS. 2. ENDWALL POSTS SHALL BE 6" X 6" ROUGH CUT HEM -FIR 02 TREATED POSTS UP TO 16'-0" WALL HEIGHT. ABOVE 16* WALL HEIGHT, ENDWALL POSTS SHALL BE 6" X 8" ROUGH CUT HEM -FIR p2 POSTS. 3. FOOTINGS FOR ENDWALL POSTS SHALL BE A MINIMUM OF 20"0 X 3'-0" DEEP FOR WALL HEIGHTS TO 16'-0". ABOVE 16' WALL HEIGHT, FOOTINGS SHALL BE 24"0 X 3'-4" DEEP. 4. ABOVE FOOTING DESIGNS ARE FOR POST FRAME BUILDINGS WITH CONCRETE FLOORS (CONTRAINED POSTS). IF BUILDINGS WILL NOT HAVE CONCRETE FLOORS, INCREASE FOOTING DIAMETER X 2" & FOOTING DEPTH X 4". WAMBEKE ENGINEERING 2913 E. 61st Court nfeL Warlbeke, P, E. Spokane, WA 99223 EXPIRES 12-29-2007 I BY IDATEI DESCRIPTION ❑F CHANGE ?phone, 509-443-6186 Fax, 509-448-6582 a -mall ciwambeke@nsn.con YOUT, STRUCTURAL DETAILS AND SPECIFICATIONS IST FRAME BUILDINGS BYDATE DRAWING NO: DRAWN WAMBEKE 3-19-06 CHECKED DALCO.IBC2003-06 PROVIDE DIAGRAMS AND ENGINEERING LAYOUTS FOR ROOF TRUSSES, BEAMS AND FLOOR SYSTEMS PRIOR TO FRAMING INSPECTIONS CITY copy THIS BUILDING SUBJECT TO FIELD INSPECTION CORRECTIONS - . 111X REVIEWED FOR CODEZCOMP)IANCE