Loading...
2008, 01-11 Permit App: 07004969 Remodel Project Number: 07004969 Inv: l Application Date: 1/11/2008 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: BASEMENT REMODEL W/EGRESS WINDOW Contact: DJS CONSTRUCTION Address: PO BOX 21085 C-S-Z: SPOKANE,WA 99201 Setbacks:Front Left: Right: Rear: Phone: (509)496-1830 Group Name: Site Information: Project Name: Plat Key: 003136 Name: VERA CREST SUB District: East Parcel Number: 45261.1914 Block: Lot: SiteAddress: 14819 E 20TH AVE Owner:Name: DOUCET,RUSSELL LEE&MARY Address: 14819 E 20TH AVE Location::CSV VERADALE,WA 99037-9498 Zoning: R-2 SF Res Suburban District Water District: 010 VERA Hold: ❑ Area: .00 Acres Width: 0 Depth: 0 Right Of Way(ft): 0 Nbr of Bldgs: 1 Nbr of Dwellings: 1 Review Information: Review Building Plan Review Released By: Originally Released: 1/10/2008 By: tmelbourn Landuse/Zoning/HE Conditions Released By: Originally Released: 1/7/2008 By: mpalaniuk Permits: Operator: JD Printed By: JD Print Date: 1/11/2008 Project Number: 07004969 Inv: 1 Application Date: 1/11/2008 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Building Permit Contractor: D J S CONSTRUCTION Firm: D J S CONSTRUCTION Address: PO BOX 21085 Phone: (509)434-4438 SPOKANE,WA 99201 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation BASEMENT R R-3 VB BASEMENT 0 $8,456.00 0 $8,456.00 REMODEL Totals: 0 $8,456.00 0 $8,456.00 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $167.25 WSBC SURCHARGE 1 SELECT $4.50 SF PLNS RVW<7999 SQ FT 1 SELECT $66.90 Permit Total Fees: $238.65 Notes: Payment Summary Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $238.65 $238.65 $0.00 $238.65 $238.65 $238.65 $0.00 $238.65 Disclaimer: Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: J73 Print Date: 1/11/2008 Permit Center Scrrr or 11703 E Sprague Ave, Suite B-3 PERMIT NUMBER: L i po ne Spokane Valley,WA 99206 PERMIT FEE: `�`; j alley (509)688 0036 FAX: (509)688 0037 www.spokanevalley.org Community Development Residential Construction New Construction Accessory Bldg Permit Application 131.Addition/Remodel Deck n Other: SITE ADDRESS: pi g I cc e; zot h AV F ASSESSORS PARCEL NO: LEGAL DESCRIPTION: Building Owner: Contractor: Name: MName: TM.�. Deo r b a s !'oNSIROC7ZOtvl Address: / :t go o E, 70f1,. Address:p n 120x 2,o c4 c s City: v CR NI L E State: W A- Zip:yid 7 City: 5 p 0 Ali State: WA . Zip:eff261 Pho>so1 ,i- /f 2- 3j-i 7 Fax: Phone:501) X416-l g3 0 Fax: Contractor Lic No: _ ieg Flo Date: 7j 11/07 1/©7 Contact Person City Business Lic.No: Name:DotrtGAc J 5all,,LC-?U Phone( e 0 yq6-/ 33 0 a / Describe the scope of work in detail: Cost of Project: $ .0 S�` �� '/ .5-,,, t. ,TI +5 I A 0.4". i "`` n - A1 {)/w. Proposed Use: f /yt Bc/SZNESS (i454ó ) Rtfig H P/2 ---q 7 **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK: DIMENSIONS: #OF STORIES: TOTAL HABITABLE SPACE: 0/ /41 8x 20' j N/A MAIN FLOOR TO SQ. 2"" FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE FTG: AREA:N /.i /v /Al N iv jA FINISHED BASEMENT GARAGE SQ. FTG: DECK/" OV. ATIO S. FTG: 30% SLOPES ON SQ. FTG: /NM /loo PROPERTY: #OF BEDROOMS: CONSTRUCTION TYPE: HEAT • SEWE OR SEPTIC? /L%/Ac ADt Tie/ ti; / N'(71 The permitee verifies,acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling,the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal,state or local laws,codes or ordinances.6) Plans or additional information may be required to be submitted, and subsequently approved before this application, an be processed. SIGNATOR ,�_ DATE: 12-2 7 -�7 7 Method of Payment: 0 Cash 0 Check 0 Mastercard 0 VISA Bankcard#: Expires: VIN#: Authorized Signature: REVISED 2/15/07 SCITY pokane Valley® 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ cityhall@spokanevalley.org Residential Plan Submittal Minimums ❑ Completed Building & Mechanical application with: Accurate address, Parcel Number and/or Legal Description, description of work, owner and contractor information, signature, and date. ❑ Two sets of plans including Site Plan, elevations, floor plans, foundation plans With details, roof plan, framing plans & details. ❑ Show the height of any proposed buildings or accessory structures. ❑ Floor plan for each floor: Dimension to scale (minimum 1/8") and label each Room (including sq. footage of house and garage on plans) Show each level of existing house and square footage of any additions. ❑ All braced wall panel types: show locations and details of installation, including engineered design. ❑ Egress windows: Provide at least one window or exterior door approved for Emergency escape or rescue from a basement and in every room for sleeping. ❑ Smoke detector locations ❑ 22" X 30" attic access location ❑ 18" X 24" crawl space access: ❑ One-hour separation detail: between house and garage ❑ Floor framing details: Joist type, size, spacing and installation details ❑ Roof framing plan and details ❑ Furnace and hot water heater location. ❑ All header locations: type, size, and connections ❑ Foundation plan ❑ Insulation information PERMIT CENTER CITY OF Spokane Project Transmittal .Valley® 11703 E Sprague Ave. Suite B-3 Spokane Valley WA 99206 Phone: 509.688.0036 Fax: 509.688.0037 New Application/Pre-Application Provide one of the following (REQUIRED FOR ACCEPTANCE): Response to Review Comments ❑ PLUS Project#: 0700 44169 Revisions to Application - Parcel Number: Other (Describe Below): ❑ Site Address: /q?(t( Z0+1‘. Route to (Please check all that apply): Division #of Sheets/Type of Document/#of Copies Received by: Building VERIFIED/INel. / 00ERtfAN& LA))0(17-- lam_ / / 0 QC Check by: ❑ Development Engineering / / VERIFIED/INITIALS / / o p ❑` QC Check by: VERIFIED/INITIALS D Planning / / U / / QC Check by: ❑ SV Fire Department / / J VERIFIED/INITIALS ❑ 0 0 QC Check by: Project Contact Information: 71 Name: i)000-ASJ- cCoc..`c�/V Phone: 116-103[0 Email: SGC>u on>fN T egPgr$e S Fax: Relationship to Project: D Architect ❑ Engineer ❑ Other Design Professional $Contractor ❑ Owner/Applicant DATE STAMP: EGENED BY CITY of SP°KANE VALLEY PERMiTitbtfl BY: I---- JI---�---J----1--1 f _, T 7 .. ' II I I I fi I I-- 1 , I 1 �_. I � �/V/ 1 j j 1 j I 1 E I �- I { I , ix1 } I I I 1 I 1 1 c.i I 1 - I iiI 11441 '44 ' 1 I r 1 1- i IN4 i v, , 1 , r ,,,,� I �� i I II I � II i C woo eam � /i, ?�v 1N13 1� of�)t�rs JI 1 ! ' '....---] tEr.".....,, .... ...1... . ..„....„) I Iiii,1 1 ! �_ m Com' 1_ I I I 1r r If Fn {vVii ! 1 I' o Q � I NNI 1 Pvxl1SX 9Ns1Ss , I N �I 1 ( f I 1 _ 1 f 1 I [ I1 1 L i �- I I - - 1II I f For City Use Only CITY OFA ` ` _ PLUS Project Number 0-1C049(9 9 lane Project Address /`4.(0 po Valley® 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is 4 (- The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure,you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email,or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE—APPLICANT PINK—BUILDING FILE REV 9/07