Loading...
PARK N 2011 ADD UNIBODY K & M ~ 1 * ~ . v BLDG. PEiZMIT # - or - FILE # 6/,~, . ~ ~q~~ Date to Rer~r2 #~llo ~~-n,Q~ (Date Received S'-if f- Pro*Ject Na e I'1~1 No. Lots No. Acres y'1 . ~1k~ SITE ADDRESS '7~ o~d ~I BJ~~2~ PARCEL # , I-Xu S onsor's NameQ~im l/Phone # P O Address Work # . Date conditions mailed Contac~erson Phone # FLOOD ZONE Yes No Engineer / Surveyor's / Architect's Name Water Address Sewer ~ School Planning Contact Person Phone # Date Submitted Description Initials / . t ~A"JAA-joA,A . d~l J ,n i). t4J_ ~ . A'a ~ /~y - . r~. (-01 ,~r• ' `Z/ - • I/~~~~'~ C:~~'~Xl ~ ,0i-1 /d)4- /,J / 14 - ~ . , N OT CE OF TRA N S M TTA L : . . . . . - - ~ . . _ . . . . ..~.:.::.:.r..:: . . . . . - . . : : - ~r:~ . . _ . . . . - ~ - . . . _ . . ADDRESS;-;":-.::::' Ali~•c~ ~ . . . : - . . . _ . j ~ - . - ~ . - rP PROJ:ECT~;~::;:~::: - ~ ~ . . . . . R CT: ~ ~~i~o~ ~7~ ~.~i~3~~ ~or~s• - - 9/- Y~/~ . : DE . : ~ . . - . . - . . . ~ : . . . . . SC 1 P:~.---: R. = . , . . ~ . . . . . . . ~ . . " . . ' " r • . ~ . . ~ . . ' " " . . . ' " ~ ' w:{••{~v ' " . . . . . ~ ti . . . . . . ~ . . . . . . : ~ ~ .w:::.::. ' . ~ J.:::.v:'ri}}~ ...}::tiv:i•:•:ii :i:4-.= ' . ' : •:.'.i~•ti. •~v:~::::~~:~ . . " " . • ' ~ • ~ ' . ' _ . ' ' " ' _ . ~ . v}'r> . ~ r : , 'r w :.::::::.~I:\•:ti~'.: " . : ~:~ti... w^"'"i:.. . . .ti } - - ' - ' _ R~;>/ OWN.E o,~.~ ~,w ~P~=:~O~N~E~ . . . . ~ . . . . . ~ ~ . . . ................e ....::r : . . . .....:1..:~ .:r..,.~•::... . . ~ . • . i. - • ; . . . ~ : - i~cv:::•;:a•:: :::•::-:~::~=;:ctc':-:.:::r:;.. •.::...tt•. : i :S{':.. - • - . . ::.,ti t,n:: - . . .,.fi • _ . - : ~ ~ r"' ' ' . . . . " ' • :i}: . . . ~r . . . ..v........ . ' " . ........n..~rmnvr.. . . v: :•.v: :v_:::....r"' :i-: . . . . . . . . . . . . ~ • ' ' . . ' - . . .T . : ' 'v"':- • :w.~ti;..... - ~K{•::.~:h•~:S.v:•::r'r'""" . . . . . CO . . . ACT---- - . . NT . . . . . . _ . - - . . . - . . . . . . . . . . . . . . . . .v.:.~ ~ . . . . . . . - . - - - . . . TYPE OF CONFERENCE Pre-Application ~Pre-Consiruction Other: OATE: iy• y'i Tl M E: DOCUMENTS CIRCULATED s DATED REVISED APPLICATION SiTE PLAN k DRAINAGE PLAN I LANDSCAPE PLAN ~ Other: I • Other: I ADDITiONAL INFORMATION CIRCULATED TO CIRCULATED 8Y: DATE: SCAPCA-M. Caine Utilities Engineering Fire District # ~ ~ Health District *Liberty Lake Sewer Questions? Contact Jeff Forry or: Planning Other: Spokane County DIVISION OF BUILDINGS West 1303 Broadway Spokane, WA 99260 (509) 456-3675 (office) or (509) 456-4703 (fax) V • A ~ • ~ N!, ~F , PUBLIC WORKS DEPARTMENT _r • , c ~ • :,5'';=__ -t OFFICE OF ~ ~ ~`S~'',G • r_~f•♦1~'7~~ ' COUNTY ENGINEER '~~:~~+'c=''--~'. ; -=-:~=`r ;h#!• ;:-t` 1~~-~'• RONALD C. HORMANN, P.E. . j . :~L ~~;~~.,,1 :~`.fi;6~•N~;~~,~:: ~~..y, ' =t , ~t• COUNTY ENGINEER ';i . - _ : - ;,1~~ ' SPOKANE, WASHINGTON 99260-0170 AGREEMENT TO PAY FEES G 1~ ~ Agreement Number V~4 This agreement between Spokane Counzy and whose interest in the project is 0cJ->vet4 , is entered into this day of v' , 19_5J . This agreement is applicable to the pro'ect k own as: G~ - ¢ 7Y~ ( .v>Av~' ~ a ~ q 10 That the individuals and parties named herein as having an interest in the above described property or project agree to the following: 1. Reimburse Spokane County for project review and inspection fees as specified in Board of County Commissioner's Resolution 80-1592 attachment C, as amended. The fees will be based on actual salary costs incurred by Spokane County for project reviews and / or inspections plus a ten percent administrative charge, and will be billed monthly as accrued. 2. The undersigned agrees that these fees are due and payable upon receipt of the billing as specified above. The monthly billing should be sent to the attention of: I understand that failure to pay these fees may result in delay in completion or approval of the project or other possible sanctions. By 0 RUG 2 21991 ` k~ ~~1 r, a;, - <<~„~ . • Ey~~~r~~~ ~i~~l~e`~ ~~q+~~et~~ ~ Public Works Building / North 811 Jefferson Street / Spokane, Washington 99260-0170 (509) 456-3600 OCT-04-'91 13:08 ID:DEPT OF BUILDINGS• T-r-7L N0:509-456-4703 4306 P01 SPC.. .4E COUNTY DEPARTMENT aF 64'-,:)1NG3 W,1303 BqCJ►ADWAY AVENUE $PQKANEo WASNINaTON 99280 (soa) 468-3111175 i cer111y that I heve examined this permiVappliceUon, etete that the informatlon oontelne0 in It and aubmltted by me or my apent to oomplte saidpermiVappIlcetfon io tru9 and correct, and suthorite Spokane County to procsed with procaainp. In addltlon, I heve reod and understand the iNSFECT10N AEOUIREMENTS/N071CE proviilons Included hereln and aQree to comply witA some. All prOvlslon` of lews and ordlntncea poverninp thls ty • vf work wlll be complled wlth whsther specified henin or no1. I undOntand thet the issunnce ot thla permlt/applicatlon and any tubeequent Inepactfon approvals or ~ertiflcetes ol0ccupency ahali not bs conatrued to iw ~uthprity to violate orcpncel the provlelona of any tbte ortocal iow reguletinq conetructlon, or as a warrenty of conformence wlth the provisions df any steteor locel PAws repulatlnp constructlon. SiONATURE OF APPIICATiON OWNER OR A(;ENT DATF! ~ ;l;;~0~~:3 I..'E i7- 7''I'0 N 08/i•8/91 f''r1f:1"t: 0 1 ~t• tryc•;~~~,E 'Y't~~'E',~ 'f N i'i'T A p f`= i`l~1 f A , f ; , . . 1•~~', ,~~~,ti';>I~'.~',~'F:;1~ f~~(;l~-~ (:'C1~-ttif~ Nf; 7: ~lf; Wf.IRK WIT1-1OIJT A F"F:RM}' 1' ~ . . _ . . . . . . . - - _.r w. .w ~~'F1RG~:~,,#= 'i 2'~'~4 W~ i ~i 1 n ~y~~ , t, ~ . . ' 1 j ' . ~ ~ ''.i 1 ~ ~•1 N TO i<, ~ M +.IN,I' RG}DY wORKN x Nc: A ~ . . . ~~~J ~Y ; ~~'l,..r~i'~' ~!~'~~41~ S-;394 ; . ; ~ • ; ~ i.,, [l ~f~ : r 7 0 N F. .l' ? KFTHcm ,S' T' o~ E i`a~;,. W ~7'TE~R/kJinr P G.i E': L., L I N [VS . W ATEFr D I; S,T. F' M N Eu 509 922. 2083 ` ~ • , r ~ t • ~ . , i~~' , j (11 ~ . S . . . • , . fa Fi K fi 1) ~ ~ r- . i;;a: . • ,'t~'i'!I~ t~1~; Wi1 ~'.~12 l..(JN 1 tif. + ~~•t~ • ~ ~ o P,, t,•.f;.R / DtjN F<fiOWN ~''~'~_~N~- NI.)MF~~,R'-^ .'r~Ql~ 9~c~2 2083 . • ri t.1 :E:4.. Y~;1' N~;:, :...f~~ t.:) (4 '1'~~:_ i4i~ I...E':~" r:,:- N ~ Ri("rwTu- NA,,; .;RFARan NA rJ.p, X. tf• ~,t it- ~t ~c- r~ ~e F~ F~ L` F~' W T N ~~'fa ~i M f~'~ .T. Cl * ~ ~ ~ * ~t• ~ ~ * # ~ * ~t~ ~t~ ~ ~c ~ ~ ~r ,'k~rM~.~~~.,~, i;~ c~~~~M ilN r> ~APpROvAL. r.,c~MMEN'r,s, . . . . . . . . . . . . . . . . _ _ ~ _ ~ f f ) i ~ d;,, • • , % ; F. i+,4 Q 01 Ft ~ r~i ..~lAhla,✓. , ..a ~ ~'t % } i~ . , _ ' , r . . ~ ~ ~ # i,.~ 3,;~ I:: ~ E ~ i i ~7 ~ _ ~ _ . . . ...J,?1'1,.~..~,1~3.`~~„_.,...._..__ ► ~ , ~ ~ ~ .~:r~ 1't;°W i.'Z I: 0 i,,F V. ~ ~P~~.... ~~~9 !~t ~f ~l~ W F1:► , . . . . , ~ ..~~1.. ~ . , . _ 1. . .r r~ re. .L1~l~ . , ~ : , ' . ' ~ ~ : 1 , • + ~.t~ ~'4 f.:' ~ , _ ' Y . . _ . . .,~T.... j' j !'t' „ , . +ji° ~ ~it ri . „ • ~ • ~ • . , .~t, p. .n. ;~1. .j,: ~ ~ .I ! . t? f~! E~ti =,i j'j if~ 3E• ~f i( •)f !c ~IE 3( it..~I, .n. x 1u..?( 11 A. at~ A. 2i., t,, iJ"~ • ; j:' d. 1 { ~ ~ ~ i ~ 1~•~ ~ ~ 1': ~ i ~•i f~, i:~~ ~.i ~••l l~ ~ \ ~ l~ ~T r'( l~l r7 Y.i , ~ • • I' + ?~S l 1 i... (^t N G~ D (~t s~~,1~~~ ~i. ° i., ~ • ~ i~~ (+l A 99206 • ~ . ~ r;m 0 ri F.:: l.. ADnTTIONv,: X c: i]ANft F: OF Xi14_11. C)i't H G T16 RT flR 'f:l',S ~ S i1) t:.T,; 000 ,S'(", T NK 1-4 A N D T' C A F' Vitf...E,lfiT If~N ~ ~ ~ . ? ~ . ~ ~ I•~! ~~Y VN 02. (1) 0 0 ;3 4 t? 0 0 0 I i ~ ~ , s ' ~ ~•ti ; f 'i ~I~ C) i~~ Q r1 iy 'fi 'I: 't Y l= I;:. ~'l i:1 I i ~ ~r~ ; ~ •i ! ~~'~l.. ',~F~rl,.t,li1'f` ;C (1N . 3 i C>. 5 0 F r.. Y 2 0 1 ^ I,I Ftz l.t 1:. I~ 4 . 50 Y . ~ t ; ~ i:~ i: " I~ C:. '1' f: W 1` !7 . 1~'~ ~I~~~•i "f FEF:: A M0 UN'1' c1M t;}l.lWT F''Fl.l' I} 'AMO1,lN1' t1W 1'N . . . . . . . . . . . . . . . . ~ . ~ ~i ~i.+ 4.: i~ . 616 .511 , 00 . . f' ;;,1.~. . , . _ , O t~ f,> i , Ri 4 I~~ I~,l~~.':i:. l.,.~~•~~~~"i~i~ E~ f~ 1 t~► 1~ j~ ~ ~o'irl~~ i..r~~H~,S'f)~J , N H: •X• ~r~' ~c x i~ r: . „ ~~i ~i ~~i• •~t ~K• ~t• •k~ ~i~ i( iF ~x ~ ~7~ 1 -i A r') K y (.1 . ~ • . • Page 1 OFFICE OF THE COUNTY ENGINEER SPORANE COUNTY, WASHINGTON Project: K& M Unibody - Addition Date 8-14-91 Address: N. 2011 Park Parcel No: 12534-1510? Ref No. B91066 The County Engineering Department has completed a review of the above referenced project. The following information must be provided in order for us to proceed with our review. A) A drainage plan for the site which has been prepared in compliance with Spokane County "Guidelines for Stormwater Management". At a minimum the plan must contain:- 1. Drainage calculations for stormwater volumes generated on site. 2. Calculations for total impervious surfaces contained within the site. 3. Finished grade elevations for structures to be constructed on site. • 4. Finished grade elevations at the top and bottom of the 208 swale. 5. A typical cross section of the 208 swale. 6. Calculations to justify the number and type of drywells proposed. 7. Elevation of drywell inlets where applicable. . B) The subject property is affected by the "Findings and Order" and the "Conditions of Approval" for the following land use action: 1. Spokane County Zone Change No. ZE-82-84 2. Short Plat No. 85-394 C) The following improvements within adjacent Right of Way are required prior to the release of a building permit: 1. You must submit road and drainage plans for street improvements. These must be prepared by an engineer. Plans must be prepared for the following streets: . a. Park Road: Continue the existing sidewalk and curbing. All required construction (sidewalk/curbing/pavement) within the Public Road Right of Way is to be completed prior to the release of a building permit or a financial guaranty in an amount estimated by the County Engineer to cover the cost of construction or improvements shall be filed with the County Engineer. Required plans are to be submitted prior to estimating the amount of the f inancial guaranty or permit release. f . ~ ' • • _ Page 2 D) Insufficient information was submitted with the proposal. We are unable to proceed with our review. We will need the following before we can proceed: l. Site Plan. 2. Drainage plan as specified. 3. Other information: a. Repair of existing 208 Swale on Indiana Lane. b. A parking and traffic circulation plan must be . submitted. c. Paving will be required on all surfaces which are to be occupied or traveled by vehicles. E) Utility Condition: Permittee is responsible for arranging for all necessary utility adjustments or relocation as required for completion of the improvement. F) The owner of the property or the authorized representative must complete and sign Spokane County Engineers "Agreement to Pay Fees". This document must be returned to the County Engineers Office. Plan review will not be completed until this document is executed. This document is attached to these comments. Please return the completed Agreement to your contact person at the Engineers Department. Only after all the information and requirements listed above are supplied or completed and the necessary review has been accomplished will your building permit be released. Your contact person at the County Engineering Department may be contacted at 456-3600. Your contact person is Robert Turner. ' S P O K A N E , C O U 1-4 T Y & DEPARTMENT OF BUILDQVGS • A DIVISION OF THE PUBLIC WORKS DEPARTMENT JAMES L. MANSON, C.B.O., DiRECTOR DENNIS M. SCOT?, P.E., DIRECTOR r ~~~~~~Ftj i ' AUG 1 9 1991 ; TO : Bob Turner, Engineer's Department Lorne Lakshas, Planning Department Daryl Way, Health District :SPOkiARE CMTY FNGtKEER ' FRON~ Tom Postlewait, Plans Examiner Division of Buildings DATE: August 15, 1991 RE : August 14, 1991 - Pre-Construction Conference 2000 square foot addition & paint booth North 2011 Park Road Enclosed is your copy of the minutes to the referenced meeting. Should you have any questions or need addition information, please feel free to contact me. TLD:fmh cc: Mr. Stan Cochran, Spokane Structures Mr. Don Brown, Spokane Structures Jim Miller, K& M Unibody Works Mr. Dennis Scott, Public Works Director Ms. Mable Caine, Air Pollution Control Authority CODE ENFORCEMENT DN[SION WEST 1303 BROADWAY * SPOKANE, WASHINGTON 99260-0550 0 (509) 456-3675 FAX (509) 456-4703 • MINIITES PRE-CONSTRIICTION CONFERENCE NORTH 2011 PARR ROAD 2000 SQIIARE FOOT ADDITION TO E%ISTING BODY SHOP . AUGIIST 14, 1991 CALL TO ORDER: The meeting was called to order at approximately 10:00 a.m. by the Division of Buildings Plans Examiner, Tom Postlewait, with the following in attendance. PERMIT REVIEW PARTICIPANTS: Lorne Lakshas, Planning Department Faith Hintz, Division of Buildings Bob Turner, Division of Engineering & Roads Clyde Wisenor, Fire District #1 APPLICANTS: Mr. Stan Cochran, Spokane Structures, N. 502 Mullan Suite B, Spokane, Washington 99206 509-927-0655 Mr. Don Brown, Spokane Structures, N. 502 Mullan Suite B. Spokane, Washington 99206 509-927-0655 Mr. Jim Miller, K& M Unibody Works, East 7124 Bridgeport Spokane, Washington 99212 509-922-2083 SCOPE/PROJECT DESCRIPTION: I. General Overview - The owner, Jim Miller, is proposing to construct a 2,000 square foot addition that will be used as an auto body repair shop. There will also be a 560 square foot paint booth constructed. The owner plans on aggregating the two parcels into one so that the building can be on one piece of property. SUMMARY OF DEPARTMENTAL REOUIREMENTS: I. Planning Department (456-2205) A. Discussion/Requirements 1. The proposed is located in an I-2 zone and the use is permitted. 2. Please submit a revised site plan illustrating detailed landscaping, the required six inch protective curbing around all landscaping and indicate the specific uses and square footage and usages of the proposed and existing structures. - 1 - - ~ 3. A Certificate of Exemption must be submitted to the Planning department to aggregate the two parcels. Forms were given to the applicant during the meeting. 4. Fifteen parking stalls are required for the proposed. Please submit a revised site plan illustrating the required parkinq stalls. The current site plan shows only ten parking stalls. 5. A minimum of 10% of the parking area is to be landscaped. Also all parking stalls are to be located within 60 feet of a landscape feature consisting of 32 square feet in area. 6. The applicant was concerned about the parking and traffic circulation on the western portion of the site. B. Permit Release Requirements 1. An estimate from a nursery including size, type, and quantity of landscaping, itemized cost of the irrigation system, and the cost of labor along with a promissory letter from the owner stating the landscaping will be installed shall be submitted. 2. Please submit a revised site plan as described above for review and approval. 3. A Certificate of Exemption must be submitted to the Planning department to aggregate the two parcels. 4. The applicant needs an additional five parking stalls indicated on the revised site plan. II. Division of Engineering & Roads (456-3600) A. Discussion/Requirement 1. Comments were given to the applicant and the Division of Buildings by Bob Turner. 2. The applicant needs to improve the existing 1208' swale that is located adjacent to Indiana Lane. 3. Please submit road and drainage plans prepared by an engineer for road improvements to Park Road. All required construction within the county right of way must be completed prior to the issuance of the building permit or a bond in an amount estimated by the County Engineer to - 2 - cover the cost of construction shall be submitted to the Division of Engineering & Roads. 4. Please submit a traffic and circulation plan of the site for review and approval. 5. All new traveled surfaces are required to be paved. 6. An Agreement to Pay Fees was given to the applicant during the meeting. The agreement is to be signed by the owner and returned to the Division of Engineering & Roads. Plan review will not be completed until this document is executed. B. Permit Release Requirements 1. The applicant needs to improve the existing 1208' swale that is located adjacent to Indiana Lane. 2. Please submit a traffic and circulation plan of the site for review and approval. 3. Please submit Road & Drainage Plans prepared by an engineer for road improvements to park road. 4. Please submit a copy of the Agreement to Pay Fees signed by the owner. III. Health District (456-6040) A. Discussion/Requirements 1. The Health Department was not present during the meeting. 2. The proposed site is connected to the public sewer system. B. Permit Release Requirements 1. The Health District is ready to release their portion of the permit. IV. Fire District No. 1(928-2462) A. Discussion/Requirements 1. Fire flow for the proposed is 3,000 G.P.M. - 3 - ~ • j ♦ 2. The existing hydrants located on the site are adequate. 3. A lock (Knox) box entry system for fire department personnel access is required to be installed. 4. A fire-extinguishing system shall be installed in Group H, Division 4 Occupancies having a floor area of more than 3000 square feet. (An alternative discussed in the meeting was constructinq a two hour area separation wal l ) 5. Sprinkler system drawings for the paint spray booth shall be submitted to the fire district and Division of Buildings for review. V. Division of Buildings (456-3675) A. Discussion/Requirements 1. Plan review has been completed on the site plan only and a letter dated August 14, 1991 was sent to the- applicant by Tom Postlewait. 2. Previous records indicate that the building construction is Type V One-hour and a Group H, Division 4 Occupancy. Proposed construction will down grade the entire structura to a Type V-N construction and records will be required to be changed from V One-hour to V-N. 3. A fire-extinguishing system shall be installed in Group H, Division 4 Occupancies having a floor area of more than 3000 square feet. (An alternative discussed in the meeting was constructing a 2 hour area separation wall ) 4. Please verify the existing shop exterior exit doors for review. 5. Please submit floor plans and specifications of the proposed pre-manufactured paint booth for review to verify the two exits, ventilation requirements, lighting requirements and other code requirements. For exterior locations the proposed paint booth shall be designed for a 30 psf snow load, 70 mph wind and Seismic Zone 2B loading. 6. Please verify that the removal of the existing fan does not reduce the minimum ventilation requirements of the Uniform Building Code Section 905 for existing shop - 4 - kL . ' ' ' . area. Please show location of 3,000 cfm fan and 24" by 24" exhaust grille for review on elevations. 7. Please submit a revised critical materials list and a clean-up procedure program for review. 8. Please submit specifications from the manufacturer for paint room exhaust unit and filters for review. 9. Drawings shall be directly stamped by the architect. B. Permit Release Requirements 1. Two complete revised sets of plans addressing the items discussed during and after the meeting and other items from the plan review letter needs to be submitted for review and approval. APPLICANT'S COMMENTS/ACRNOWLEDGEMENT: The applicant acknowledged that all comments/requirements were understood and had no further questions at this time regarding permit requirements. CORRECTIONS: To minutes or changes from what appears in the minutes, we should be notified within one day of your receipt of these minutes. To site plans as required by any or all of the above-listed departments shall be submitted to the Division of Buildings who will then distribute accordingly to those departments. ADJOIIRNMENT: There being no further business, Tom Postlewait thanked the applicant and the departments for their participation and reminded all that he should be contacted if there are any unforeseen problems which may arise. The meeting was adjourned at approximately 10:40 a.m. Copies of Minutes to: All participants File - North 2011 Park Road Addition to existing shop NOTE TO APPLICANT: Some time ago the County recognized the need to streamline the building permit system and accordingly initiated these Pre-Construction Conferences. Comments so far would indicate these conferences are successful and do enhance the permit system. As a recent participant, we would appreciate any comments you might - 5 - ~ • ~ ♦ have to furthei improve the process or, should you have any questions or concerns regarding your conference, please contact either Jim Manson, Division of Buildings Director, at 456-3675 or Dennis Scott, Public Works Director, at 456-3600. Sincerely, " James L. Manson, Director - 6 - \ impson Enqineers, inc. ~VEr. D 6N CIVIL ENGINEERS AND LAND SURVEYORS ~~P ~ 01991 , N. 909 Argonne Road • Spokane, WA 99212 (509) 926-1322 • Fax: 926-1323 ' c~GINEEp~ i ~~l+l'Qsryia~ __r_a~•- __....~y.,._~_._._.....~ TO: PE n L,n e Co uv.. ~v iff7n ~ I ~l f- e v~s ~L -'~ip / J SUBJECT. IC ` r'r14l tr-- -Pliir L RUrn ~ DATE: '.9 19 I J P\ ~+GiC w c! 1 S C~ 1~ C. T~ r~►~. ~ T V1 C~ , 1 n r,~n,~~i c R p ~ 1 G L'T ~ r 00 G, rc~- (r,zc(j + r sE~ie-- ~ 7- h'au e- ar, c„cN c- (csc~ our- c4 v-..c~~ s heE ~ c k„ c~„..~ a.T' c s- ~ . A A ~ C-1 aA72 , ' ~ v SI9ned c --t3wLe '.~f v ~ _ • ~ P oDY wOR <~.s 9-~1 2- / r,C- Z /o Swj' , ~ 3 S (f" rr~••~ . ~Lr ~ Z v L 7 - E. S`~ C Aspy 4i _0 5~53 i3 -t"5o s9 /Gu~ rg - 59.6~ Top Ex,~t, S~7 7 • cwrj#. ib ti3 /2 ~0o s9.25. S',~s ~..1le•~ D s9 59 - 59s ` -A sl0 `J S r 3 ~ ~3s Sv~.6S SES~jeY 5~6~P 2,7 S~ly s9~' S43Z S9400 Sy.i3 ~ + se ~ y, a 4Sp S8.9y S 9,0 S91 /L y./ s'9.y/ 59.63 59.39 sy•53 s9.~~3 ► +zs ss y s9 ° sy.~s y.s S9,ys sy.e~ s9.y~ s9.s~ sy.ys 5 y~ s 9• f 9 Y• 7 s9.y9 ~9.87 sy. sy S9.co f 9•y8 Fenct t 9~! +?s s9' 60 ° s9.zi s~.sa sy.i. Z 5,1,41 sy.sl ~sp S9 ~4 ' S9. Z8 S S95S s 9•90 S9. ~D J~ C - C ~ . G O v n 1~j C ~i ~,S ~ O O~ ~ r ~ - 9/ ~ ~ _ _ . ~ , I ~ ' I ' ~ J t ~ n ~ ~ ~ ~ ~ , n o L 4 p I~ 5~ + { 11 1 ~1 ' VARlAB~E ~4 - Q VAR~A6LE ~ ~ ~ ~ ~ ~ r I • ~ ~ ti ~ ~ m ~ ~RSP~lA~.7 CONC~~7~ ~y ' ~ ~ ► T PAV~h~~NT C~AaS B , ~ ' ~ P~'H .r'~ ` c O.IT COMPAC~`~D D~ ~ BAC~( aF ~ _ m, - ~ ~~ISfiiNG ASPHA~~ C4NCR~TE ~lD~~lA~K ~ 1~ -i''°` o ~j . i ` i1 11 , ~ J~ F~ ~ r si 1 11 , ~ 11 ~ ~ kJ + ` #7 + ~ ~ Ir- . 1 ~ S.Ld p ~ ~ ~ ~ r~- - - 0,5'; r ~ , ~ ~ l./`-'/ ~ G,-aIl e, a 6>'7 ~ O.a~ 4-~3, 0.~ I , ~ , j. ~ ~ ' ' L . - • . . . ~ ~ f 6 a.. + 6 4e a q % 1 ~~I r ~ y~~' . V' ~ ~ • o w b~` 4 F 1 1 s d~ ~ d a a . ~ ~ ~ ■ ~ rCa 6 0';(7~46 •d+d~~' ~ . ~ ` ~ ~ 1, • ~Q ~ ~ 1 • ~ ` ~ ~C~ ~RUSHEd SURFACENG STD. C~NC~~T~ SID~WA~( p ~ ~i r'MA~~ (4-"~ s CONCRETE CUR9 T~P C4~JRSE S~D. CONCRET~ CURB D.33~ ~OM~A~TEO DE PTH " VAR f A8l l~. k VAR9A$LE ~ 3P~+AL3 C4N~R~~~,~ ~U~~Eh~T CLAS~ B t ~ ~ , Q5 4 , k, 17 Ca~i~ACT~a DE~~~! A~ AY TI ~1 R 0 ~V S ~ ~ N a ~ - ~ A~ TAI~ AS~HA~T C~QhJCRETE PAV'EM~NT ARI BL DIS ~E V STA. i~ ~o ~TA. I? ~ ~7 P A T I D~1NAL A~ H L ~ DEWALK V ARI AT i ON STA. 19+~1 to S, ~ 1 to STA, 20 + 24 ! AR4A~ ~ ~4~-(]~~ 24~-Q`~ 6~-~~~ 4F~a~~ VARfAg~E V ~ ~ ~L ~ ~ - ' A ~ k AR,p ~ s~ r ~ ~F .}.r 1 ~ ~ ~~C .}_t'ff~ L) ~ ~ ~ ~ ~ m ~~U , Iz, ~ ~ . ~ ~ • C _ ~I ~ ~ ✓ ~ . ASPHALY CQNCR~1 E~ •i + : ~ ~ PAV~M~NT C~ASS ~ ~ , ri ~rIQ- i 'w ~ ~ '`'p ~ o.~~' co~~acr~~ a~~m ~ ~ , . r ~ ~ 1~~. ~ 4 ~ m v ~ ~ q i ~Q • ~ ~ ►~0.5 , ~AL ~.5 ~ ~ a i , ~ 5 a. 5 1.5 ~ ~ ~ ~ ~ q C 8. a, ~ ~ C d ~ m d p. C~ ° a'' d ~ n * ♦ / • _ e ~ ~ ~ ~ 4 d ~ ¢ ~ • ~ ~A ~~C'f ad ryb b O .4 1 \ , C~OUNTY R~AD PRO~ I ~ ~ ~ ~f o / ~ ~ ~ / ~r , / r ` ~ / a ~ ` A ~ ~ 1 PARK ~ t ~Rl1SHE~ ~LtRFACING STD. ~OI~CR~T~ CI~RB T~P COk~RS~ - ~ - ~ ~ONCR~TE ~~RB Q.3~ C~~tPAC~~D D~RT~i ~F~iCE 0~ ~ s3oEwa~K- C~UNTY ~NG „ - 'u ASPHA~3 CONCRL~~,~ PAVEMEN'~ ~k.ASS ~ S~flKANE cour~rr ~ 1 1 ~ 4.11' CO~I~AC~~D Q~~~N ~ ~OADI~IIA1~ ~ ECTI~N ~ P M CRU~HED SURFACING . A g~,$ ~ao~r ~s~~~~~ ~a~c~~ ~ ~v~ ~ ~r . M ~ ~ ~u~vE~r~~ t ro~ co~~sE + ~ 0.3~~ CQM~AC~~D ~E~TN aPPROV~~: AUGUS~' 2 I 68 STA, 17 ~7 ~o ~TA. ~0 ~4 , , . . . . . . , . . , , kRK ROAD ~ I o~a~u~ fFFICE QF ~f ENG I N~ ER r ~ ~ c~ F ~ cOuNrr, wasH. SNF~ 1 r 2, Q68 . . njA'. . r0ALAW l 1~ Ji Awi ! P7r BOND ESTIMATE ~ ~ • PROJECT PARK ROAD, K& M UNIBODY NAME RBT DATE 27-Sep-91 DRAINAGE ITEMS UNITS QUANITY PRICE COST 1) Drywell - Type A EA 1250.00 0.00 2) Drywell - Type B EA 1480.00 0.00 3) Grate - Type 1 EA 325.00 0.00 4} Grate Type 2 EA 330.00 0.00 5) Grate - Type 3 EA 320.00 0.00 6) Backfill For DW CY 14.70 0.00 7) Concrete Inlet EA 610.00 0.00 8) C.M. Pipe 10" Dia. LF 20.00 0.00 9) C.M. Pipe 12" Dia. LF 24.60 0.00 10) C.M. Pipe 15" Dia. LF 30.50 0.00 11) C.M. Pipe 18" Dia. LF 24.00 0.00 12) Precast Manhole EA 1435.00 0.00 13} Solid lid EA 300.00 0.00 14) Ditch Excavation CY 9.20 0.00 15) Sod SF 0.70 0.00 NON STANDARD DRAINAGE ITEMS 1) 0.00 2) 0.00 g) 0.00 4) 0.00 5) 0.00 g) 0.00 DRAINAGE SUBTOTAL 0.00 16) Mlonuments EA 160.00 0.00 17) Barricade LF 32.00 0.00 18) Street Signs EA 75.00 0.00 OTHER SUBTOTAL 0.00 GRADING, SURFACING, CURB, AND SIDEWALK 19) Rough Grade CY 12.3 9.20 113.16 20) Top Course CY 6.2 10.60 65.72 21) Base Course ~ CY 10.60 0.00 22) Asphalt Concrete Tons 6.3 44.40 279.72 23) Curb Type A LF 100 6.20 620.00 24) Curb Type B LF 7.90 0.00 25) Curb Type R LF 7.20 0.00 26) Sidewalk SQ YD 66.7 15.30 1020.51 NON -STANDARD ROAD ITEMS 1) 0.00 2) 0.00 3) 0.00 4) ° 0.00 GRADING AND SURFACING 2099.11 GRAND TOTAL 2,099.11 , ST'F'EE T G?l.lF•IIVTI7 I ES U } 3 ' _ _ r-'RO.~ECr Noa - DESrGRaER- ~~BT ' DATE-- 9i27/91 F'ROJECT DEGao=:RIF'T I QN-- k- m Un ibody S'1"~:EET 1 NAME--- PARfLENiaTH 100o0C-~ F"T, WI I)"-I- v o (FT. BF GINh! INta STA1-I QN iI C) o i~c_) H=hl~ ING"" STA"j I QR! - 1200.0() ONE Sa UE OMlI...Y F'W TD1"M= 30.00 EW I DTH= 25n00 G?W IDT'H= c')o (r)c_) °f'ERM # 1 : CHQF'F'CD TERM # 22 ~ C:HDF'F'E:D T TEM MEASIlr'EMEhlT G?UANT T. TY SURF"ACE AF:'CA--- 500„ 00 S n FA ROADWA4' EXCAVAT ION 0.67 F'T". 12.3 `d m "a !--:'l...s SHE7D SL! !--i FAC:I N~~ TOP C0 URSE f: n33 FTo 6. o=: o Y. CRI.JSHED SURFAC:I NG BASE C:OUh'SE Ci, i ic i FTo c i o c i i=: o V o ~SPHALT i=:C►haCRETE C)a 17 FT. 6.3 TDRlS C:lJRB TYF'E A EX I ST I Rli_--i c i o(-i(_) F T o PROPQSCI? I o0, c i FT. S T nElaALl{' E k I ST I NG c")o i a0 SA V v F'R0F'C~SED 660 7 S. Y. -rOrALs RaAnwAY ExCAvAT a aN 12.3 C.Y. C:RuSHEn Sl.JRFAC: z NG TnF, CouRSF 6.2 . Y , ew:RlJSHED SUF'rAC: I N'-3i BASE CU!.lRSE i), C) C. Y n R5F'HAL"f C:ORlCIP:ETC 6p3 TOhIS r:Ur:B -c~~~~~~ ~ 100o f ) FT. S T DEWAl_K: 66a 7 S o Y o SEP 27 191 14:31 SIMPSOfI ENG. - . ` 735 Po1 , . , . , . i . FAC S M E ~ . , . R,~, ~ . ~~NSMSSaN . ~ nate ~ Founaed 1846 9LZ-7I 91 6S . . ~ Time impson ~nc~~reea, _nc. 2- : '3 a . : . ~ C(vil Engineerlng, Larid Surveyin4 No af page5 ~ , • ' ' a LanC Plannlng ' To Fram , . ~ ~ ekl C7R t Y'1 e, (~Lr' S , . . a I -J< ~ ~ t ~ ca L cL~~ v c.a ~ C_o,.Y v, ~A I Pr6 . ~ • i ~ ~ .J . ~ . I . ~~Yti~ ~r~..L ~.~►1'7 ~f.I. ~'1 ~ ~ t YGr 1 o t~- • F I • ' ~ ' ~4 ~ ~7 L'`J ~ ~q 11 T Y_.O~m t,~`-~~ G~ fr.! ~ ~ i~. 4 1 j s~ 'Claten~,e 8 Simpson Engineers, inc. (509) 926-1322 ~ ~ N 909 d►rganne Road . Spokane wA 99112-7189 Fax (5491 926-1323 - ~ - . ~ ~ ~ , . . . , , ~ , . ~ . . SEP 27 191 14:34 SIMPSON ENG.. 735 P03 t ~ tv~ . , ~U' ~ _ . ~D D Y 2~"gI ' ~ %r' ~7►+ ` PlAYl t4,1 T ' 'J`, G. ~ ~ .~~•-o LE g' S 4,s~"i p°..-° ~~53 Q ~~w jr,14r S^9 13 5,877 sa~~N~.,d c'urb. /Z't'00 f9,23 5~.~5 /GaJ~er' d S'9~'F' ~,y.y3 $9zs ,4YO qs 2,7 S'yzy s9 T~P r ~b i . ~ . '~50 SB,qy S g,0 59,/Z. y./ s`~,yl 59.63 s9,~9 sy53 s9.~~3 + z y, S- r9, ye s-y, e~ s q. s 9, s~ r y. ~s 1 i ~ r/ s9 - s 9- 59~9 Y~ s9,y9 ~9.s7 S~.sy sq.co ~'9•~$ +75- ~9? 60 ~ s9.zl y,S ~y,s~ ~9•sa sY.cz. s~.cz a , ; ~5~-o s9 ~ 60 sg. zg s 6"9Ss s9.9o s9. 7o y ~ G o v ~ ~ G LA . /p -q/ t ~ , , ti f ' • ,~r' y4. . . ~F ` . SEF 27 '91 14:31 SIMPSON ENG. 73S P~2 • 1"~ • ' ^ ' ' ' Y, ' A a~ti r ' y SS.:'' 1l 'r-0' ' ~ ~p % r V t Y ' 1> ~ '1R+• C y. ;,-•~f~'" ~ r ; ~ ..i, ~~t~„~~" ~.•4 ~ . r' '~r"•M'11 Y ( ~ + ' ~.r.1 .~~;r~- `:~"'A.c~ b,~'n 1 ~'1iq r' ~'tGt ~,C~ ~i' 1~ r'1~• A~, t~~~'.., ;'v,'~6~~u ~-.~`yi~07, S ~,'~i~ '~%•w~ji~ .~►1~' ~7J~;i~~:r~ '•?,i~`1a4: 'T, ~ r:ij~~fi~'~•~~=•~:~ ~t.;%'u ";•yy f ~ ;r~~i~1 `{;►~1r,:JA~~.ul,L1`;~,;r~l ' I~~,'• ~4~4,1..~. ~ 1 , ' 'y o' "v_ • ~ ~ d~ . 5!! z'~n' 'r f:1 t' ' 1•i'l". s '~~'fS•~ ~ r ' , ~ JI . ~l;y~ ii~~~rs~' 'u ~r~,{ iI! Ic'~;. K ~j ~ Y ~ •~k~:~i• ~ r y~-,, y~~.4'•? 5.~" " •~,E ~ l. ;~~4~. ~ • , ~`y~ , !..T~., a y 1 . , . , .r.~yy ' ~a~ lI r ~`f~ ~~5:~ ~A "i .1 ~ • i~, .~~1t~~~.~~.A ~~tT ~Y w~ 4 5~:~ '~~t 71 IY t 7t' 1~ i:.. ti ~i ~ > ~ ti " ~ ..3.+ n: L: '•„r i; n ~ ~ ~..t t `~j C. 3' :~~'S. ,~~ja. ~i ' . ~ ii~ '1 ~t<.' yt~l'~ ~ -h} •v~; 4. V. V. p ~ i h,~...r!r ~1~~~ ' ~j • ~ r'.. r''' rt I v~' ~ i . ~ ~ . ' t~~~ ~.,•.~.oj. ,r ~t a ~•~',l.fR, 'l)1~ . .l}. :y ~'cp",y',Y.•'.2: e«•-•.1.~~~'-i~~ ' ~ ~''~~t~Y~ rv ~J~! f~ '•y1:~ T,' '~J~.`~' ',~7•A~.~' r ;''S' ~f~r~ '5~,~1~~ f ~ ~ 7• t+~ r c•^ t' f J 'y }y.~ i • ~ ' ~i ~ ~ . ~'~,C'~ „~?1,i~~~ y , '~.1~:•Y~.~ } 7. a, ~d- w' a ;~i ~ ~ • ~ i~w ~~t~ .L,?' ~i'~tiM • ~'T.%, i.'j,~'irf' rS~~~• h1.'_A, w•~ ~ ~tA~`L._ ••y~ ' 'g`, 'Vt t~7~~ ~~~~.1 r~ ~ :D f~ ~ 'L~+~ayl'~'•I/.~rf`~.; , ~J~/Y•' S C, 'r ' >~k: ,w ~ Y ~ .'1~ .y ,5'.( Y ` tr ~ yyj~ ~ , r ' t' :/yy~~~~/. ~.<~`_:~1 ~ •~~/.~~a~ 'f~{~j~ y~~ i ~~:,f~iJs^ j"Y;,p~ M''~' I. • 1~ ~ 4 ,^}1ti• ~iY• 1~ ,•T:~1~y~~q'~1~~, ~~~'tri-N. ~;~1/~Y,-~:.r~~~;;.Xri .1 , /.A 'Vj:' '~il: ~ .~,•b.' •,7f;i y~:. ~jY,~, 2- q Y'' '4 ~i1 (1 ~ 'r y ~ :4 ~ ' . ~•~~t ~ .+.~'y' d.., ,l'„rjA ~ .u.,~S.L'r'~\~, :1,1. = r, f: ~ , ~,~l 'r , , ~'i , 'r,r • ~:.;;~t \ , ~ •+1~~~ i{: f• !~~~'i+.I~' +Z, . T~ {/I '~t''1 ~~,ti r.. , ~ ~ ~ '"_'~1n 4 / ~a '1.i4 1 ( ~i\t, ) t~• ~~t .st. ~ f'~+ ~.r.: N. .r ~ ;j~ ;3.,ry~'i i. t~ ~ At'~~'7H'G;,7 h'~i ; Q•,~'C"4y~`7+j*',;' ~~~~~.~4{C~ •,L:,.~,Y~,`~r'~,f~' R!t s,:3!I„i'l.l'~i ~.'~j ~j t y+~ ~ ;t- Ir '~,ea • ~ .i,_, Y.~(1i i. > ~ ~ i .l , ~ ` i l . •1 r.~'~ 1' ,y~ ~l•. ~ 7~ j , ` '}i `..q.F:f: a. 41,k "~4,~ ~y~ „j~Ljr~. .y'f'~t. 1 ~h~~~' ~'!y.: V v:..,t:'~ %J . .ir,4 ii.Li, ~ , t. Iu. ~ S ~y.g~, f' t ~ C~ y ~ ' q ~ ~1"' ~ ' TjS ,~y~ l . 4+' ~ ~ ~ ♦ , : i'~ b: 1• ~ y.~ t ,t; f~~' ,~Qt~' J' : :s ~ . I~t , ' ' ~i ~i. w ~t• ~ •„4 ' t t Ju' 7~ n.~ • P v,' 1d. ~ 51;~ ~ ti'•1.~ .1. ~ ' ' . 1. T~: ,i ir' '!,•t'( ~ il~ / 1 C• y ~F• ~ 1'r i • j r R h . ~ J 4 I,? ~ ~ 4!, S r , ~f ~ • ;~'ay,.- , ,I.~'•)',.~ 1 , f~ ~It* ' .~2!, 1 ~ ~y ~.,•~v ~~•7 Is ~1 ~~v+, -0~~ 'tY,•.:,~,. 7S ~ c' . . j ~ i . . 'i` , .."s ~ o_ rN'• . . '-t , ~ C, ,~9 ~ a ~ ~ ~~M„4• ~+'~~r •k~';~ ~_rl r L J ' f'l~ i::• ~i`' l~, • .L..~t:: ~i` ' ~y.:;• i.'4 /~5~ ,~C ~1;; a ~.f. .~1t~s y.? r. ;1:~ r,~ 1~•. J1s •"'=7.Ei~f le ''{'~~:'.6.c.11~ i ! " '•~'ii ; ~~i ~f~'4 ' ~ ~S,/3~. ~ t c ~ , '7~~r Y~ .i~~v '~f~ ' ~ ; Y ~ ?4Y. A'L ~ d.:,'A;S ~ . ~ •y~. i•'•~ 11.'•;j, p -'.t ,y ~~'~+,,It~~r, :a. 't•i ~ n.~ w~h. .5~ •,f~~~~ Nt~~r d,`, ~ ~ ~r,' ~ ~ • i , ' . , ' .l~• ~fi , '~t ~ t,. Y'. r e, - ~ r~ ' in ' . r~'~ i ~ ► ~r `.1~ ~ rt;. r 'ti;~, t• ~ r;" > r ~~s ~ 1•.,• ~~,4. p~ R~ ~ . ~rS ~ ;i M t'i;, yi~ 3 ' ,r'; + ,e . •i ti~ ~•~a a ~f f J~, ~ . s; .1 ' , vV.. ,~l; t~ 1- 1 r c~ : :"1 i •r !.(1 , ~ ~ ~ ~ ~ r, ; t ;4.~1 4 C :~ir,, ~•°f• et~r, ' 'i T ~;'4 i. ~ t .t r_',:~• 1;' i~';.t t. ~'Jt . '!~'i l < • A1 ~s~~• r.t{'a r,~•~i+~`{., r~ ,s:~• i 1'G, ;,l~~1 ~ ..i~, v:. . .a4}l~" ~4b 4~ra•, ~~/C',;; t ~ ~ Lt • r . ~'!'.i, , i r :~i.~i,~ aa~ `}I s , l . M., c1, nI. . I , !i'`._ , • ~ x:'t~:j:p' . ; ~~r. .~=.•.t •tr!'~ ( ~ ~~'''G"~i •y• ;:y~ ,`14~,'1j ~ I ~ . 4 ,e t ~ ' 'l t t ~ . ~ , a~~ :'16% ~ i .y, '~),t, : . ,)+r .q ~ . ~ . .ti . . , 7 1r-_t~ . ~.,~~I~, t ~~i:~, ',Jn,•. e. •1:•' , 'i ~S. ~ ~"Y;•' 1 r 1" ? d i~ 't'•~:r~:~ .:t K H t~. .n~ 5~l' , . a ~ J.j~~ ~ nv~ .i.' 1jy:~S':,V ~ ~ .~;N. `1'~' fti : ,';`y~'~i7~ r;ti ~ ti ? • T;'~: ~ ~,~i _ e J•~`• • ~ ti ~'i l~ ~ t : ~ , ;'s,°' . ~ .?7. r,{~!.' J,f'-t f !4. j: ~S~~~ ' ~ V' 'C'r'v ~C. ~ Z •T~~ . ~ N 'd• ^ r~ ::l~r tC~ '0:.~~,I ry ~y~ ~i~' a s ti b G • . ~ d:•: ~ i•'r I ' ' t. ► , i ' µ ~ Y.~4.''it{~~d. ' ie~ L~~~ - , r'7~+G~,:~,~;1 ~~]:~1.Y': ~ 'r ~1" ~~i ~4~~aF,4:,+'~rl~•~~~~' T,~ Y , ~ . ~ ( r\^ fJ Ki t' • j~ • 1. ~ ' r i i ~ n~ i . . ~ . ~ a` i;~'..a , ~ ~ , r' ~~1' ' „ .'L .•~t• D . • 'I: ~ ~Y-,% .7.h,. t.ii 4i t yi. n ♦ ~ ~ n~' R' l ° t , ~ y~, ;~'1~ , y. ~ f .w t ' k .t k !,i ~ . y ` 'e ~ 'J ' r ' ' ~ "r` v C7~ l~v,• . ' 2' . 1: < r • ~ i ~jj~E~~'; I . % ~ , ~~.n ~t;:.i~~ Iti~~,~„ ~ , ti,~ ;j~~lu:. J,~ • ~•t• S~! i i ti'y .P'~;4;9"1 -~S t~ t~L br. .'d••i".i 1 ~4 '~i "r~ ~~'b~ {{1 ~~~/~i.~~.~ ~ L~~ • r ' 4.+" tt~• -V•~~v,~'a ~.j► r~ ''Jf ~ j~' 1 'S '~:~'~~'i`!~ _ r~f'f! i~ • ~ r,~.Ar.~i• (,,1~1...Y~: i• ; tt~ '.ja.,l~. M ~r'• ♦ ~7~ 'i 44.~~~~ 0. ty~, ~7•,~. ~•1' i~ 1 f'~~ ~~,,~~5~~~~),~>}/..11'' ~'~r~.i~~ , 4' W ..~~1...,;~~~., y~~i7~~~J ~ ••~~~Yr'~(,+ :..J1~"~'.~'~y ~ IJ: , d I ~ + ' •G rTi • J:, '.f ~ ' i~. ~ ~ ~F, ~ ' ~ J. li f ' j'; .i ' jl', '.a~ i y ' ~l ~ ~ ~y Y ...~i~{ . . ; , ' tA.,~'~ ; fy~•,. 4~' ~ ~'It ~ Y' t. "~~'~n^i" ;~fj_.~!.~. ~ . d • . i.- ~ • 2~, 4~'~4 ►ry'` t. r ~ 'J'1~ . V' 'i~-!tY, l:~'f. . ' • . ~ ~ ~4~ ' t •t. •i'i~^1" a t ~ y . • i~)~K ~ , ~~.r ~ ~ ~ }~.il,~ •~Al ~i •'i..'>. f . e'qt~~,..:~~ -c; •y" , " ✓ i~ ~ r ~X ' ) :ae;: i ' ';~'.i .f " ? ' ' • A•' ir ~ ti: ~ ~ ~ 1 < r, 1 . ~ . ;ci~I . .i . '~A I~v~ r ~!f "e 1 4. V'~ ~M' ti~! _;~'•rl~ ~ ~ . • .L ~.~r.o }I i.;'^ . 1 7• ►l~ 1~ ~ ijai! r.~ v.~il.•~'' ~ N.' ,Y , ,y• .y~~ ,t.t•.~ 4 t.'.'.:. : ~ ~ ~ . ' „P o v.~1~; ~f . 'iiS., 21 , ~ 6~ ~ ~ d r~'...~~s 1a h• f.h, ~ Y' •:Y"~la, . ~.'~y':1~'.'~ l.Y 'y ~ ~ ~ ' ^r~~~ ~r ~ ,ek ~•l+T:• 74L.' ~9.y a e~! ~ ' ~ TJ,~~t~ aH• i}. ~t~~'!~:' 4~,h . ~ s~ ~ ~ ~ :~•i'1 . ,t•i;,11m, ~ . . ,a~< , ;:u•.~- „ •r.,<. a;; • u,., . \I ) ~ ~ ' J4..~ ,'<<% ~ '~i~ M •~Y,••~.' f:,: `t .:e. .AP .J. IC ~ ' e'•_::~~~ ~ ~ ~1 _ id.~ i~..~xi;,`~.~ -~~~~fh~ l~~~.= i~'. ~ • }i ~ J ~ '~~z'+ •i , r• / . i' , ~•.~c ~ ~s~{:~{1, • ~ ?F~ ~s'"~''•~ ~ ~t.a • . ~.1',: •~~j~: ' 1~', '~,y ~ / , - :.i .k . r ~y. . y, , ` ,,p ~ ~s ~ r4~! • , . r ~,~1~„ ~'L!S., 'ti'r ' ~ ~ > 7 6~ ~~f~ Y'. . .i, T' I 1 ~ ~ ' •.h. f, A~ . ` l~ ff'-. ~r, ~ ~jY. 1 I ~ -r L• ry y.~ y~•; . ~ s.:.. y~ ~ ~ ♦ ,a i ~i► ; ' ? . ' ! 1' ~ . ,~y~~ s' c, ~r , ~ ' .+w ~ e - •ti ~~s',~r ,.i~:~• ~ c•..i• \ •}y( 1 uw ti:.'•C, N ti±- , i < f_;t ~ p , ' ~ ' '1 ; ~ ~ t .~,y ~ ~r. ~ ~i'~.YP 1~ y ~ T : i 'G ~p , T ~ Ur . : ~ 4 ~ ~ . ~ C?M l ~1i;.~'. tir. d ii~ S~ 1 p~l~ . ~ v.. , ' ~''F:, • , vti.~ ~ ~ . " v . • . ' , 7 'v~t ' .%C . 'r e t • ~ ' . t. ' ~ • ,j k ti+ ;'s: .~1:•~ f~.t ' ' . ?e ~ C~ ~c' i ;y.. i ' i~ t , -,~i ;t ~ ,..r~ S - '~~,;r' ~ ;.i X'.' 7~' v lj~± ' tL.~•~'~ • • fl~,~ i~ i ' ti'~i' h ~ 4 •;y~.:,C'' ;~F t 7' fJ. .l~~t',~, t..','1: , ' i , r~ t iF ':t~ 91..I..t•~;' ti > • ` • ~ ~n Y!y i .y~~' ^ Y j _ i i ~ ~1 ,r P ~ ~ : , , M ~ . , • k t: ~'0 ~ ~ ~ , ~ ~ ~ I ~e „ ? ~ f, e ~ , it ~ j;' ` ~ ~C, ~~Z' i ~ V:. ~'7''' r ''n - ~•t, :j.i " i . 7~•,1 % . 1 Y ~3,~~~ IyF % 'r• " t ~ ~ Pi. •~ti l~ •1. v; n. ' . . , ,t , . ~ ~r ~;,t t3 ~1' '4,~~-`'~~'~ ,,,z.~ r : ,ry.. , h I ti~>-'1T . ~ ' ' ,i's ry~.~=' ,r` r r.;~• 'f~: ~ :2+~' , I• ~ ~ 1,~,.dki, . 7~^~'~ i~ • ~1r~t,. • ,u•,,,' ' j ' ; a • ' l•Y,;'• ( "ly; ,'.~Y ~ ,p:l" "~L t' .•~~tY..fs-!. ~~~1'ty1.: !,.'l' t ~t• , r . :t,:' . M~t•f , t• 'S' .r ~ : ~r ~r:1 . ~ i~~.~ ` . ~ • t~ . ~i: .r~; t~N,; . ,T , <;.~:~,~.c~F! ~ ~1 ° , l~,. ~ . aw',, • :,~:~y .;4 ! ~d ;~r~°~,;~ . .s ' ~ '3•• u `Y. t, • , i '1 4 r. ; • ~ n ' ''l'•~ p~;; ~ • ~ r ~ r ,~~yl.•7. •~,'.~tt~,t ,~Y,~~~,~~.~~.~,~ ~ ti • ~;i~y•4~l,r~ ..1 ~ M1~w `.~c >it ~•t,~ ~ r `'i.,1,' .Y.",: ,~•v' , •~y i~:,n,j ~'p~~-.~. w~ ~I' . I :ty~!4 tiI ,;~/~1' ~.~:1. ~~;~L ~ !S 'h .i IY r"~y►.y. +a `J;.i~ • ~~t: ~ .~V ` • Ft, ' ,p• . ` ' .2~' , =i t, s , . J y~' , r. f ~ t • ` ' . 7"• , .<..~~'L-~,~.~.~s A~7~~'6t.r►'7~, ~ .I :e`'I j' ~1R"` .4 ~{±tit••1,!.'~,~~~:+~!,+~~L1 ~~~:h:`~: .1 ~~.i ~C j~5~ •:r J ~.~,~...~1•j4.:4•~'Y ~4y.~1r) .~I ~ S~.f•,:~~'•1 ~i` ~Jr~` 1j. .ri. :~►~1f~1~ .~•~,~-~.~Y:v ,~,~.i~~; r~:t:,;' ~ "f~ 4.t n'~, ~ ~ .'.E,~'..~:~ln ~~t• N' rr~. `~IR~l. ~y~~.++.~ 'pc :~~.J4.p7• rl ..i: 4, . ~r f~t' ~ • ~ ,g~~t b} ,~.~.jf;tr. e , 4~ ~''h• ! ,f ' . {~Y % . • ,1' ? ..f.. . 1 • ' ~>7~ r,i^1-'~" T~ ' , ~l ..f! ~J~,~~~ ~ ~~~t . ~~i i J~y ~ 1:~ •i.~A': 1:•t~4f,'~~.~, n t~:~. C` • v ' r,~ ~ ~ ~ r Y,,•. t. ~ ~ ~ . } i' .~y~. J; ~ a~ S' . .afi. ~r.. , t ~ ~ i '11 ~ .~E t•i rJt~ y/~ 'i • ~ •r ~iy ' ~ ,,.',C. ' 1' •Y. ~ d - ) - ' ~ 'r ~ i ~ Z. ~ 5' ~ 1~,; e ;,71 . ' t tiI ~ I. • 'r ti+~L i Y~'~ ' ~ 1 ~ .~ti" ~~!'t,.~ 'J• i , t ~ b'~',;~l~ilff'.;c~ 'r;,+ip'.''.l"' 1, .y••?a~~ f~, . ~~''Y' i• n. [~1 'h .i S. ~ ~ ~ : . / 1~' , , f., ~ ^,1 Y~~si1~~ R" . ~ ~ ~ . , d• . ~ kll ~ ~ 1 ~t1 ~ ~fwLi•~ j , `J~ . ~'`~rl,-.~r". f5~, ~ f' r•`~..~~ ~ ~ • ~.f..~f~~~r .a..~,~t ~~j~~9."~'~~~,tJ ~20~.1. •~y%~ ~~r ~~t ':r'. ~ ,1.i~A C ~J~ :b~ I ~ f J~, ~•l~ ' ~l'~''! ~ '4v.•' ~ ,:i,..~.~L ~ ~ ' I. } 165 , ~ , , a'u~ ~ ~.j~',' ~ t Nj~. N' ~v , • • ~ , ' ,l4 "~1~'' ~'I►`1 fli1 ~ r ~ . i' :c'• 1` ~ dY, ` i• io.:~'•~.~~. ~iG ~ rr. ;R'~:'yy' i . ..r t:; ~ f: ~ . r Y~c. "d.: ~ :F . i: t, .o~ ~~(•f P'~ ) •7i v :^5'i. 6 11 . ; t iµ' I , c1,r,? ~~~~.i ° ~ , t'::~ : ' ~ ,L. ~r {.y. }?3~., It • , .~4 ~ ' '.'i, r~;. ,:'9• '.r.•~~ ;.+Y ',5'~i,c,:,, nl~lL ~J- ~ . •i~''~ C".~}~sl . 1~(~~ ~u.i~~• ~t~ ~y~~.l' ~1~/~) ~ti~i~ ' ~r.~~..t~.~{'„ ^~`~~YJ~y.t~'~,~~r4r ~~',N7ji~,'rt'^ry'ffK'•:~ L„~r, •a ~d.~ t•; ~ y~~`!c1 :1~ 1~.'., ,I•'~';•' ' .Y 9°' • ~~l I ' 4 ~N.. . ' 6~ 4 . ~y, :~,r+ ~`~~j ' a. •v, , •<< ~,•,•~.~;A , ZF• ? f;~ i. ti•.' ^'..,i. . • • yV' . % ~ ~~r~ \ 1 ~ f , ~ • ~ i'', i i; ~ ~ ~l ~ ~ i1. r, ~ ~.i%.Clr •I: Jr ~4 • ` '.r . n , y.,~" ' . . . `~.~~;,r.,, ~~~r~:~ f:r~ o, 14 ~?~'7r-~.;yi:,,'.~i,i~y;~.~ .s`t,c,~'~.,:~ 1 •~l~~?y r L;.7 ~ r . ~ 9- ~.°I~f~. ~tl.~:'d..~> ' ' .5', 1' ~ • ~ r yJ. t~i~<~ ~ `Y..Q ti ,;y~ 7' ' :jj~~ .~~,~.r Y t1 .•~j~ ' ,r~.~.. ~ • ~.i ~ ~iVf rS. ~lA, 7 ' ~ i • ~ .i ..N I • : < ~ • , A f ;Y~ ~ 1 ~ • • r ; ({'~t: s ~L tl , ~~1,L..~',~ .l•` , • `I l~• , •'~i..~ ~x~'.~I ~ SB•A•~ . ~ ~I .l~ 1 1 E~~ , g .(iV I Y~~ •7' +s~ ! • ,R~'+.%y:n.~ki: ~ ei:•;~° ~~•e!~t' , ' ~„°t ' S Jyr w 'L ~.Ii.••: .b1~.• '61r:,. f1~;.1~~~ '•.'Q• • =.tr:M••~; ;r>~ r•4~:, ~-'~~t iti • i 11, r;~.~.f~ ~ . S.•ir ~ ,tJ •b•. ti~1lys~ [ ~ T~ J.,~,~• ~ .~r •jj`~ J.r'~Y ; ,~i a'`` y', ~r I. 'ri.' i~l• ,~~y.~~:~` i ~ pt Y,i! ~F•, ~ ti jV~~' r ~ ~ , f~;' ~ ~,p . : ~~l'i' • ~ ' l C" ii •q ~I' 't~ . ~J 1~'' ~Y" '.~,~.i„ ' .,7j~'y'•~ , ~r., }~r td~~d~1~ ~ ~ V'`~1+ •'1r~.i ;~!'t~ ~ •"a• ~ ►~I : P. ~ !.G¢ . ..4 ' tr• M1~ ..'1~ t ~~r' •4,. ~it~'~r i~ S i.L . 'J ~ . v ' f, . ~ ~ ' • ~ S Y~, ! ~•1~~~ , ~ n, , _ 1' ~ rl , l..i`>;'y ii 1 y~ - • T~~1 ~ •~4~~ •d,.t5k i • ;~f JS;.~ .~7 ti ti;T? ' ~ . ~i. ~w: v fi : . , ~ ; , ~ ' ~ 1. ~ ti~'~ ~ a•.l `A , „ !i F'•y`.. S J b ' • • ) c'. A,,; ;it ~ ~.I i 71t,I~ya i ;i. 11 , ti'~n ~r t+l l~' ~ r;{:• " ~i ' M, ► 1 '~t ~ •F ; ~ . .1, I ~ ' ~;~~•i,,f ~t~,^'. ~~f'?~!w~ r'yr; ~'4i.~ '►j~~a' •1~,~;'~T. ~,•.+n~y~~1,~:••~'~~.•.~.~~'%~~'~''' r~ k• ~lht\;J ti,'" .Q'liltt4r,,''`<l~ 4,% . '`S , 'i . 1'~ ti73~ ''i, ~~.r„ z. "'y. ~~,.i~ :t L~ ~~.,~•.A.. 1. • . •i': ~f •~ii'' ~i ~ .J9-~ f,' ;~r. ! . h•,, - . ' • c, j. ~ ~ ~'`i' . - ~rv r"a ~r ~~;f . d 1 f~ .,h ta ~ .ry' .V,~t . !II~„r~. ~ ~'a`~^ i• :f~ `i ~~~",'K~ ~ :~{4 ~'ri: 41~' V' .~i ~r1~' ;y'I .t~ f . •lC~4•~ .f•. ' K i~!! ~ . i: rY~ e~ {i ~V ' . r I f A . rE 4~.~ y ~ t ~ ~ f~~ .Ir ,,4 .'T . k' :F: ~ ~I~ f - ♦ ' ! F. i' '`5.1 , ' ~e{z:3 a. • . - .1.. • •4t. . . i :i'.~L• ~ ~t~ "y 4~ ~n.• 4*v;a .;'n a r~, i ti ! ~~;~e ~ ' 1)~/' : 1i7~ '.ti :...A'~i h~y" ' rw . Q :~•i.7~' ~.r ~•A•'..% 1<' y ~ h + , ,r I. 1,•.;y'. ~ ~ 3'~;~' r, l~.•. ~,~.:r0'i~~' ~ ~ r i,. w.• 'Y,~P.n~;!;'"I. :,y,~SE~..•. , ;h . J ' ,-r;', ~ ~ i .4 •.t~„ ~ ti-' e~"~ , ,'t 1•. '4~ ' ~ ~ ~ ~ ~ . I `1 • . . • a.• ' ~ , r ;.~~;I , ^r,. . ~ e ~ • JF • o-;7 ' ;tL ~ ..%r~, f~;;~~~. ~ i~ A. ~ ~ / f 7) " 'J j e f ~ ""~(~~•~•f.!i, :.~r~ 'Y,e ~ 1~ •1. , •i+. ' ♦ 'ts,.' • t.t.~i , ' ,o q ~ a t ; ~ y.iy''+ S • ~ ' . ' ~ ~s i~ l , ~~~5: ~ V. ~ 4{ d1, ~ ~ Y' 1~,~r ~ ;S! ~o'.,, , 5, i' ,•~.F• Ll~. .iM`f'~V f.~t:~4 ~'s ~iJ.:1~ - %f. 4,~ ~:•x. ' ,~l.%~";.r:r r : y 13f~ ' . ' * I ~ ~ i '~r•~jj~ J,¢;ir,•';'1~',;:'v ,~~~'i lr•'~'~,:K; ,~~~•+1 ' ~ , i!, )i ~ ~4S', t.; ~ e..i .th i . . : rt+ rA••>.' i r•• ~•~,a~~;f.~ f ` . ~~r,. , ~ 7 ' 1 r . , L~ :i•.. 4 . . ~ I . , . C' d~.'ti ~ i y. {'.,~jr~ ' t~~ ii % M'' yr.r ♦ .t''j~ . r. ~ti' .~ry „ •I~ • . . ^ `q+~.'.~a~ , ' 1". ' , "h ;ri!~ ~ ' r~ Ac 3~. , , ~ /t, B. •S~y~ ~t 1 ~ e~'A`.~' ~ '.;~j~., ~i . !~e, •Q....~s, r~,",~1~., ^i, ~ ' ~ tr.yti n.,.:i. 4 1~ e • . ~ . t~•~,/. I k .f~' ~"~?h!: I j I'~ C; ~ • ~~rp ) fl+ ` , .,yi ~`~f ~ ♦ .y t:' ~ ,.r , t,~, ~ ~ ~G.~, ~ ; ~ ~ ~ ~,L Y ~ i ~t~,. r','~' 5,4,•~ J. p•;Yi,::' •~Irj,. fi ~t Y'•t'~,• r{ 1~:. "i ; :.III ~ ~ 0.4. 1. - 0 i' . :~,'I,, • ~ ~ . bp i~ r t i I ~,~1~'l, ~ ~1~n.~F'J• • ~ ~~1.? ~~~1 t~+',': '.7i ~4 . ~ Y,, ~~~~•;tity~ ~.L Rr'~ tiY ra :1t` ~ ~ • t i,~~4.i•~" t1." .~i~ t~ ~,S 1t'~'.rp ~•at' ~ ' 1 ~fa; iy1 i a, .G,'. ~..,,i.~ ~,,.:i`~,;'•5;~~ ,'1 ~°'~'-'►1,~4 ' 7r•'~(~• ' yfp ,.l ~ .C tb N S; 'i'wM' «v ~ . ,T ` ti T~ g ~ ~ Oi". . 1~;'.~ ' ,/Y.;~1T. l••~4 ..ari.'~.• 1~,ly~ j .'i' ah~~, i~l'y~u~pr~i1~'? ~ J t ~.J . 'S ~ :4 . M3 :;"~~1i;~ir~~ •t`.:;fa~~ t••~~~% ~;h ~.i• :"K..:~ ;`:~'r;, ~ M*,5 .~~•n,,y• j. .~~'4".•,'q~. ' dta~'.R~~. .k:~ ,i 1~'~~ .1 t •~,~C A,~• •t..~':"~~~'./,.•`~ ~t `1Y;: ' . r1.~t~. •'~'~,'~~i~ . I G' i~.~~',,~•,i' ~~~~h~~ Q' ,~p~ ' r. t .t~ .S~ +W ~~Y:'. R'• f:':'~' ~•I~~ ' Oftb; ,+'~'ib,. ~ j~ ;l ~ _ .~,r ;~13? ~1.~~r~), ~~i •Y. fji' ~ <~ri t' * :4. ~ 5 t,~'~4,~~~,~ .~K; 1r. • t~ . „ 1 r: . o (`l.l f r ~R ~l~~.r~ Ar„ f ' - l~t. ~'L'' ,~f';~~ ~'<ti u~}~.,,~. i 'I: r.}, ~.t~ r ~k~ ~ v 'N.~~i1~~m . ' , t tJ~. "~i'~i 'l~ !Iy='': 'S , ~ T. f 5;+i 6j~, ~ • , i r~h. ,h' '~~1 ~f/ it-, T~ *1. •'<l;~ i V if';a+~: ~'?a e% t ~ ~ . c ' r ;e• . ~ "S~~ '•jl,, . } i~L i - . _t~~ ~T~'~, ~ ' r ~ ~ ~1 '~.:N~'b..~t!•x • ~ U+' , I . ~~:;y, ~ ~ . A ~ ',~,d : ti, '•:~~i, <,r, '•i'•;? • I,~ v, G- i.~ ~ i} ~{~G ~ _ r fY f,~.~ ~'i. •'y 3.~.'~•yr~~; ~ • i - u ! ~ • •r t1,,J~ 1 +sr ~t , {e. f ~ ~r•rl h • 1~, ~.r ~1''• a , t C. ~ :y ~f+~i~ ' N v, ' q, v'~~'1 , \4 ~ ~ 1~ ' . 1(:~ ~ `n ~,h• t1•r'•;~ ~f ~t ~ . F•i t - t r~~' ae. r.a• • i?, ~n•°, • ~ . . dy'c ~T~. F: . , ~ ~ ..4~1r. . • :.;'e:~a yi ~ ld.~x V' 4.'• r, r: ~,Y• y~;'R:'j 1 il ~ .tit5. k' ~ 11' i, c^~f ~P '1 _.t±~'~~•~;i'~:Iru,if„' ,~'~.v` f•~t•1,' ,'J~ , • .t.'1/'~~., 0~1\: , ~p, 1; r' }4r\ s~;' va`~ ► N: + - ~w- . .0. . S ,c . i r:; F~ ~1 ,):t1, e.,' ii~~ !~7 l ' i~, r.''~ ~1•4t~ . t Y•a ~1~ .P;..~' 1•~ : ' t '~~,4+' .7:~K "•i.W*•, .2~..r t ~t~~ ~ ~ , Y i ~''S. C~ ':~'d~1 t~i': ,y~, 1~'•rj~ ' i~ ' t ~a ke~ ~~>~5 tti•.•/; t.1 . {a • :r~ C r. .N•,:i i i~Sx 3•). • . '~~1a.(1 ;i;',~Q'~~ y'' .r~~ . ~ f r;~° ~y ~ j' f y , '6l:iTti - ~ + , ~ ~ ~ i ~'r . 1 ~ ' ♦ Y~~~;"'.,~ ~ .1 . r.~: ,V j; 1 ~ . , ; ~ • ~ ~y7. ~~m _~;~~l ~~.i R+:, tC}~ f 1~f:` i; '!1', i+ ~ .ti tt .!.:!•~~~''1'~ S~ t Y~ ~ ! ' ~ • ~e¢~', r~ ;Y P ~ r T~.~~i ~U?' '.'~:n, (s: ' ~ •+A! ~ ~i~T' ~L~ i~~~7r '1t h~{~o~, „)1^. :t .?~I,' .G~b'~ '~yb:.,. ~ i~'~n ,°i~, ~ . ~i ; r)~:'.i~~I~' t'!'4~`r:. t'..'t, j~: ) i. ~ ~ 'I~.,:s r~ ~ • J J . f~", ..1..d t t k,.:1... • + c+i4 ~i; • ~ ,a: 2s3 • v,••,st tii}'• •J~.i r'..t'•;~~ • ~;a' ~ •f ~ - ~i~,A ~„t,.~S ; : ' , ~~:if' . : t_ C~:ij-y~r~ . : ' n~ .s~~.~ e " y ~'I~~liv., ' ;~yr ~:'i'• .,'J'~:f~;~~~1~,~~~~~.vw ~ ! !~~t~ ~1 ~ ~E:' ~~i, 1 a y~' n d'F~~ ~ ~a~, f: 1, ,~Y'~..h~{._iY~,t~',~f~~. 7~~~•~.1•r'J~ " Jl ~,~1~ v~.a~ ~ ~L~T~~.~t.~;~ .;1,"~~'. ~~~~k`fl~j•~-; ~.y,~~~z~ • ,';5~~:~~' ';~,'t i ..K'.n,~y, ~ y~. ~ '~rv~;l. '~~t~ ' ~p[..~~~irt ~•.1~.,.~~ ~~''1~4• .y ' \ ' ~.i a t' s ~ ~ ~,r~ z SS~I. I r: l" ~ I.;ti ;~Y ~ `.d • ~ ~ ,i ~4 , ',~,i y I I. V e. ~ ~ ~ " i r' .i•~3'f ~i t ~ ~,c~~ i~;, ~il:ty ~ ~ .yA ~~•''v• f y ~~Iy ~F ~ ~f l~. ~ r~:S. a . . n ? ~q ri 'y d J^';#d,~Yi~ - ~ : $ ~ ~ t:~~:' ~~i~1 ~ fS „ .y.J~ ,+,;C' . , ' ~y . ~.i, y~ . ; N, ~i~:' 'r '+d,.,,C,' ~ ! ~ ~ bs y~•i'Si , s. - rci~ 3't'i .c;:~ 7~~I' .~°,jI"• : L`' : V . y , ' , ~~`1~~i.'._..i,~ r ~r i i7.~~ f fn~~~'~,' .~v~%ryT~~'t' ~r. 4'• •~A~~•~{ ~ rY~`r~,,?~ I , ~.:,.~.~t.~,,, 1 • ~Y, y~ e ,,:+.r.:s l,, f •t+b J' I, i ••r:'~5'" .~~~~T. i' e~I'; ',<~.hti. ~A~, Yr.'~! " ::5~~' Y,i.. F t is~t~c~ ~~t 1 r~ I ~ ' tl~.^'• • 4~~f~ i t'\C ~~,~'S 1( i~~.. o•' .e. p ,t~ .r, .iK1:~~.•,~ ' W. 'r~.'t i ~ rr+ ~ti~ r~"7• ~..tt . Zti,.~i. ' 4 1.:Mz;Y44 si t : ,•r i'•fS~t1' A i ~ t~1,~t~ r jy y ~.p f../,':.~ }'.t e:L..i J. t~ ~~~a ~ ~ , ~ t„ ~na~T ti: ' ~ 7- ~."r, •iTj~ %J,'d.~~~l' - ~~i ;i ii.?-'% I'~ iS ~'t•,~~ ' • "n~r~i ~ ••r' ~ r~ii'.~ .12' t t 1.7~" f- }'T.~~''ll T a ~I S• ~v • rM• ~~,1~ d B. ~ !C•~ v-t,~,M ~y,`yI, Y y a'rC ,,ti : ~rt~_? ~ a,'. 'i. i( 'yr% ~Y.Qi l, "S' . ~ 1 ~ _ ' ^~Y ' . . ' ~ ~ ^ ~ ~ ~`y rY , ~,,~1. ~ ~ ~•.I;~~~ J'- ; ~,i: , ~ Ir 'Y.~,{ ,,,~~y ,,~p .+~i: ~ • , i j '.L~ ~ ~ ` ~ yf !r , " ~l ~ ~Y f tf.':♦ '.i.,>1';~;`Ft • + 1 tA ~'~r✓'~'•~ 1.1 yty !9S'~ ;jA jrlj-`1'~'•'y. t~~Jn+ y,°.' fr~ c~' : . r ~ , ; ;~~p Y~. f , ~/6•Mp r >,l~W~ , - L ;i~, .•1, v ,1 t ,r~y, a ~ r,b.l~ r;'.~~•~'f'i N.ti~ .,y~ 1". i' ~V~' ~~1~~ ~t r}Q.Py a."•v.Q~ ~e- j~}~i ~ 1~ • 1~.1 ',^j' • "v!~_c, ' `I^~~ ~ Y~f fy ~y~ ~ .i. ~a~ ?~it-ty * 4~a~}1i~1° r '4 ~ { i.:~ ~ +Sf.~' ~`I,:~l)~ , f. ~~,F,ry'f•,.thi•t r~ - f - : ~ iisY. ~F~~ rt. 1 ei r~'~.. 7 :,'.~~,~r/,~ •tjJf~• t!{'~~~y.fc.»t, aJ;+;t~y. , Y ~Y''~ '~~tif:~''~~J~~1'',y,r.~^-,:~,.•'.s`;•~,'iF, • ''P 1•~J~, ~ •'F r' I , 1 ,f• • ~t ,I f V~•;a ~~4~iY'~...~~ ;,7t~,. ~ ~;f~`;f.~~ •f~ 1~~ y,~~ r.y'>'~~ ~j .F•.;' •.+`'i's4A,, r,~Y!i1~;•t .~~.~'i~•J;lr.•, ~Y'`,.r~. i ' nr,~. ~ -•M~.~' ~~~It 'if~ r;^t+' ,~1~~+ L ; .~1:. A ~ t. .~i. ~ 4 Y ' ,~~j ;ip• 1 ,t ~i,!„ • ' ,k-:' ) - ` 1 11 } ~ '~i~ ; ro' 3 i , e1 Cf ' T~'S'." . - i!'~~. ?,l.T~,l~' ' I n. i~tl,. o .:i. ; d' y~ ~ .J: ^ t~)~.:•.• ~at,r'~ -r 1 ~,`7~1,1 J i~ -t g •r :t~ f •t fk' ► 1u, , -cf:'^7; : 'p ,J• , t . . ~ ~ •~a~ . . ^,~r.~,r,,1'~~~ C~7i `7i1,.t:-1/. ti• ~ 4%.. s , i2:~-~ L~' ~1~~,~y• ~ j~:, ,3,~~,,,.4. r•' e - ~ y'r ~ -1 y U.. i .d r ~ ?.~%i t , a~ 'Y',,j' ~N .;1` ' i~t ' .~1 t ~ ~:~r i ',i'~ %",.J}~~.~ r.~F..'~,1i. 4~ .w't~'•'~! , 75..`.~ ~u. ' ^e1~. . :~".:.r'a 1~ ! , I' . r, ~6~~ . ! t :.y.~, ::1 ` e~ ,i.~ •~'::f . C:•' ti ~G.i), p.' ~ ~{i.~. vr' ~ yY ,Q:.i ~..N .;f; c•~ r I , ~0~ 1y ' y :~b' r~ ~ ..J ~ ,~*I,~. .~1. '.F ~,I ,rA_ i 7 t ~ ~1~ ' j4,,{4 - n ,'r \ f'• t . ,x . : .~I -•.+'i. * . y Q. !'~.~j'. .~t;JS k' "'~l.~' Z '.i. IJ' ~,7:~ ~t ~y'.`7~+~ . ~ ~..ti T• . "t~, ~~l Y,. N~ . J, F~,~, xi ~ t ~~_~;a;. ! i y , . ~ , ,Y~ { ~ . ~ .i ~ ' ~ • ~.r i , pl ~ 5~,~~ ~ ~ • ) V v n. • ~ ~ . ~ • ,1: • J• n•~ Pl' ~ v ; n, 4 ./w t w c ~ ~ ~ ~ii~~ ~I ~ t'~. ~ ~ J •'2.~ 'y. '.~r~~'F ` l' ~J' i~ 3~'r, •1' ~i~~~Ti~f~„ ~.c •.s;,~, ~;,~o,L_ : , ~ .~I~.i~+> •Ij,e~:+; .tY~ - ,'.I.:..~ ~ ,.`„~r , s r ~ i'• ,•i•~t,.,~. ` i ~a• • . • .i }rt I . I . ~ ~~1~,.r ~ ~j~ ,~,F~ %i , i ~ f 1~ •.t • ` • ~ f' t~" . i'~. . , • W' :~r• ' ~ ~ 1 P f ~y,rp ~~1,i. +'~.1 . t;• ~ ~n'~ ,k;'i~ U;ti ' . ~ . i' v~' 0} ~ i.1 , ' i'~' . .7 • f ~ • i 1 1 ;G~ . 1 'S~~ \ A'' I ' ' • t -7.•i 1. , ~ t+~I ~ 1J , ~ ` ';f}= ,v • 7i', j . .l:y~ ;`J ' -~Y~f•~' rr a~ ~i,T. ~ ' 1 : . : s+ ~1 I ~ t~ 1 1 ~ . t.. ~f ' { n 'i l.~~~ •Yt,• . i c a ~ S.. • y,4~.-. , ~w.:.,. ~+',,{fl. .~-~,~9`..y;f'i~;J-.: ;~~41 1 ;1:Ui D ~ ~.~~~f~ 1'• ~ j y;, ~ ~r~.' '4 ~i.,~~~v • . , t' . • 't' i ~ 3,r•.~ra• p fr , ~L.~ t b: ~ . ' .1 J1J . ,,~s ~ r • ~ , , y , y, , y . . i: , r . T. o., : y, .b : , I~~ . ~+•,.r , 7 ~'"*b,I 4~~; ~ a •t».'tL ,.i „ o, .b I f'.~4 ~ , I i~~ ~ . fi~.~- r ' ~ • • •rC l ~ '1 ~ , y ~'N~' ` r,' ~ t ~ -M~' fi 44 ~ ~.~.~R~{ , , o -'d .`'r.~ ~Y16, :~j~,~~~',~ ~~~:1. ' ~4:K~~' ;~r.~,. ~iyI~~/}~+ . .•~„~,,,r~~; ~ i:~ rr.^ ~ 1 ~ • f'~~ ~r"•~~~~~e9 v .t ~tr' + ~l, ' ~~r~_ •,~,v Y, ~;C!., ; l ~ ~ ; v'. i 1+. . ) 4 ~ • „ ~'t; ' YK.~-Y ; 'Y: F _ . F ~ f K • • ~ i > a ~ ~ ~ ~ ~ ~ y~ . .11 ~ ~ • ~Il '1 ,.,~,r ~7\ti '}~;r" i l't. 7'+ • Q '~.+Y, . . . 'Y'~ . ~ ~ ~~+~r 't! ~ ~ ~ ~ $ •an, •L'; a~'~jl''}.1 '1 t' i.' r~,.,~~~' y~w_ , `~f;1,J'`1_ `'1 , r , ..ti„ . °,~tI' ,"4~ 1'~^`1y~~: 1~..~ ~T~J • Yi~,.. • ~ ~`-y I ~ : ~ , I ` . . ; r A S. i ~l'., ~ ..f,.. . '.f ~ ' ".g S .a.i:~ v S ~ " . } . _ ~ 1~ v,.Y~ '~~.c~ r , , ` ~j, I a .I V,~. o w ri A. f, ' • ~•.',1_ t•;t~'~ ~~i.ia~ ~ I.~l 4, ~l. i: 90. , ~ ~ ~ ~ 1.*4'::• 5- ' ' ~J • ~ . •tl~. r",~~•! .r . ~ ~ u ; . r' ~i ~ i.:.• ~ r ip.. . , ~i ~ ~ i - ,j+ : t• 'ii' ~ .r~ 4 , t ~ ' ~ -i r,,, . • . . ` •h' tt~ e.-rr•;. ~ ~i. • i.. ii •,,-r •.E ~-i'; 4 : ~,"tiC~, ~ ~ . C: ir.. ~r* r' , I :~~;M:, ti ti~. • . ~i~ , .r:im~~ I d~~ } t ~ ~';:w~i1! v~' :'4 p.• + . n~'1'„~ . 1 . , A` A , 'y, Y ~ ~r~f, ;5S .l~.. ~ ~F •~t~ .i .~y` . 1. •f(1• • • In'- . .1 ~ ~r' , • ' I ' I ♦ , : .4 " » • Y, 't;1,, .1 ~ •v: 1 • ~ • , ~ ~ v~,` ~ ~ ~ l~~ 'N~:~ 4~ .ti ,.'s ' ~ 'i~~ • ~':v;. J, kY+.' 1 ,i , ~ . , . ~ /'"•I~t. i` ~ ~ ~..1 ~ . ' I. ~ , f' 11 • . ~ ~1 " '•~~~1' r.. . ' r ;i,';.' r•,~i~, ; I '-S• ~t'~ . . ;'t~ i ti r , .~r M~ . • : , '.i~7 • d: r y l,', ~+i?~- d ~ ~~..5, < n. . ; h~. •..J.• ~ ,~.e. y . ~ ~ r ,4, . ' • ~ . ♦ % i ' lt. , Y'y~ ..~~'I i' ' ! 3I , i y, I .r:T ~ . ' ~ V ' ' ~Y ~ ~ .r..,..~ ` g • ~ : , f'e ' • 'Y ',►'•`,f' t ~ '1; . i t rf ~ , ; ' °.~'i., f . n. T~~.~~' ~~.C:::~' • ~y~ L• '~'~a!.~% r~~lr'd.~~~• 1 ~ti~ • . -r.:. , . S ' r ' ~ . r-r ~ '~T c.. :i~t;F ~ , a~• ~y._ . '.f~.."It' , ;4 . ,ry ' . , • , M 'S `k ' . • t fi I` ~ ' ~it• M ; 7 .a ~ A~ , r • \ ~ ~.t •i ♦ . . '`r:. 7 ~It .n~ ~ ~ ~L~,~. ,j;).., . ~~6~~ .5;t ' • t.:~ 'y.t, I+~''~4d•. ~ ~Y~• •J.,g::~ ~ Ti ':y~''.F,ii ','i-.• `4~~ ' i ~i• _ ! _ I r t.,41~. , ' ' -i , , t~^~ • ~.t• ; , .t ♦ J :J S~' ~ ~ . s ~ ` 4:• -:r~`N••; Z'- ♦ i . , y, ..,1_'_Z. , ~ . ..1, ' , ,i,A ,i,~ 1fr~ ~1y'~ ~yti~r ;1 y f ' ~ • ' .~~~..1i. :14.'. b v.i ~ ;T.r ~.L.. .,,:,~i r1n' ~'i~ ~ ' ;.r;. •!'r.. . ~~.~f ' •'~i:. i~' ~.F~'° y •'t~Fv ~l4~~yl y ~ ~ . ~•~La'yar~rL ;.ti5 • ~ : '<';y, , ',~1 + ~S'rt~~ :i « ~j / .:i C:+ t1~ ~~t,.~"~Li ~,w~., ~f• r1r~1! ~f'~f'l• P . f,;~7: ' t. '~.,i, °11")..I'A' r ,N • ~i 'i,,,`'.., ..~~'.4 -0i 'i ~ . ~ • ' , • - ~ ~L~~ a~'~ ~ ` `;~~i' ri;,,,i.i.. k„ . ~ ~.•rA^ ~ ,:;•i; , 1 ' ' C.. .J~~~' ~ . I .,wN , ~ ~ . ~ , ~ ° „i . , e ' '/:'f7~ ' + 1,'+tii•Y , : A ' . ~ I ~-µn M1, .,.t)-)~'_ . :f4/, (j• i wg~1.. . ~:~~if,. ~t 1' •;4, ,;.i 44~ e'. i~;' ~ . . d~..~{. . 'el .!1 ~ ~ ~ ~ tT► ~,"y;,a. ~ •;t.~ • •n.~• 'ro. . • ' . ~y y~: ~ _ F~ •,O ~ ,`j• ' ~1 •1~%• ' , fT~',•; ~i . •1 1 ~•.ti. ~ ♦~~a• ! c . ti; , ~ •~r,~ ~.J' i :.tL L. ~ ' • .^I ' . ;~h'~r~~.~ '~~,I. i•,' ~ ~ ~ I .w',7' ~ C•".A 1'V . ' w-j~ ti'C,7'` r ' • , , 3,1 '~`~,..j' . ' ' .e~ •d ~ I' h ,-rL' 1. ~1 .r','t ~I '.k• •a'%'~ ~ t ~ r, ~ • ' . :i.~j,,4f ~ ~ ii ~A i. •;a ~o ~'v 'S~P~~s: , i ~n' % L~. .'i , f ' t c a ~.P iA[~'. , ?r ~r1,: , i i M . , ' ~'~Y"'i~•.'V:•• fl1 ~ ' y~ nPj9~1+Y. •'i~Jw.~:' M. ~r~~~: ; J , ~'~'.Y.'~ ~r ~ : }.,,ti, ~•'~'ll.~ t • •a.. ~~11~C~ ~ i' . j• • '.•.SC ~.:,~•~.'if•t~l.. .TC1 ~~~1'~(~ I , .j.,. r • ' . ~ .~.~17~~ ~t~.. n~i-a~ ' 1`~t l. ~P , '^.'~+C' ,io,':fP''~'`~'~'~'j'ir~ ~''~~J„'!~•., ~a > +,q • 3SC ty..rr~ ' ;K. " ~t'~( r,~►',iYO ; i ~i.;w'~I F'.'` „U!~, ,R' ~,'~u, /ry'';~ . ~ ,•C.a. ~ • ~l +F :j~~ y,.l.l . L f,' !S' ~(i~1' ' ~Z .~ri .t~'` sJ'•~ .n~ ~i:;)~.; ~ ' ..y~ • y J; C , I 4 ~ • r' . ,~.2..,.~t-. ~ ~,Li ,v •j ~ . y~ ~ •r~fl 1~ ~t ~ . ♦,~,{!lh , r7 S~,Y;'. n _ ~pr~l.~i :~r Tf t ~ ~ •Jt. l•~~ ~ ~~'~r» i ~ ~ .tKS :i~ j " ~ !h~ ; - ~'JI 1r .tar ~T}. ~ f 9''.;~~t*1=n'~~. ,p ~ 7S'"',.`:j~ r ''~'h'j' i Z 1.~ 1 ~ 0 . ` '~ti P •J;,;• •1~" t . , • 1~l' • -0n. f r{1 T { T' r ~ ~ t, ~~~8 ~ ~ A e'.E+~ 1• f e A' y 1 t~ A~► t • f' . ,~o;.,flf i~~ v..~'b~ ~'Sr~~R ta: ; , 'i~liLAt1 . ~ ~ I i / _ ' • . ~ - • ~oDY w~~ I~S . ~ g'-Z9-41 swr ~ T. Cr r F~~ PIa,,.~. <,..6 T, G 2. % Fr~•~ S l To ! 2L . 2v t7 , . F. O. ~ C ~p 5~sj qz.3 59.0~ /i~ u~r s! ro c E~ f r se ~ 7 ~b y 3 zs 9 59 59 - /2 7f00 S9.2S S,..ZS ~Nyle~' Q 37 4- cro S 9 3.r ' f3S S~,bS Se~/zy S~~P. Z,7 ~~zy s9~3 S93z S9vo 33 4S8 S8•9y 5 9,0 59,/Z s"9,`~l 59.63 s9.39 sy•s3 s9.~i3 4S70 S9 ~ Sy. i5 '~.S 59,~~8 sy.8/ s9.y7 s 9.56 sy.y~ 5 y~ S y• ~ 9 Y• ~ 59,`'19 59.81 S9. Sy S9.6o C, ,.y8 ~--FPn « t 9 60 ° s9, z/ y,s s).s! s). sa 5- 9. cZ s Y.~Z sy.s~ 5-0 59, z g ' S J9 ss S 9. 90 5 9. 70 -r s9 ~ cS~ J 1 G o v n`~ CtA O O,.7 . / 7 ~Or S~Q.~r- ~ d C~ ~'t'~'~✓ • i / s' ~ . ~ ; ~ - - . ` . t NOT CE OF TRANSMITTAL ~ . . . . . . . . . . . . . . _ _ ~ . . :::M.::. . ::t: • ::ti ~ '~}i..'.•.•_..• • ~ . " ' i;• _ . . . . . ' . . _ . • . ' ~titi•.~ . . v ' _ ' : • - • . 4 i'':' ~ . L:~:~ 'lF'•o'-'~• • . ' . . . . . . - ~ . :K" •...:::.r ~ : . ` • ♦ . . " - _ . . . . " . . ' . . . ' . . - 'J!!t~,~• ~•"T~1'~ . . ' . . . . • • ~ . . • ' ~ ~ • • • : l: . ADDRESS. .::PA=RCEL- . _ . ~ . . - - . PROJ-ECT;~~~:~:~::: A , y . ~ ~z~ .5~4-~x, 4JECT::##:; . .:i:: . . : . . . . - - - . . • - ' . - r~. . . "'y.}• ;,{r. , . . _ . . - . • . . . . . . . - •r., ~ • - - - . . . . _ . ~ : : . ~.~r. . . . . • - DE . . . .R I P.~ . . . . . . - . . • : . ...~..'~ti . ~ ' ~ ~ :•t..•' ~ ti . . _ ~ " • - .'•%.J:: - r~: . : • . . • ~ - •.Y: ~ ~ • ' . ' - . . ~ . . . . _ • . • ' : . • " _ . ~ - - Yl....'. ~ •::ti„" . . . . "".t.._ . - . • .v. .:~r. - . 4 - ' _ _ _ ~ ' ~ . - : ' i: . . ' " ' . 'r" • . . ' " . ' . . . . . . . {?{:tiT:-}:-}:-'=::~::•' ::~ti:i;Y'::-:'' 'i ~1~1':::.. . . . . . . . . . . . . r .4. ~ .•h••!=.-::.. . . . ' . . . _ . r ~S . . . . . • : v: . . • •.v.:::: ' ' . . . . . . " . ' " . .r... -:ti.. . . . .....n: v:....::::.v.:i - . ~ . • r . . . . . " e . 1.. . ~ ::J.': " ..............:.:.:.4"'•:'......• .......yti•:'"' "~~~}::;.:~::~..ti•r.. . . . . . ' ' _ ...r t:ti~::;~'r' . ..L . . . . ..V . ti. _._v.. . ..n.... . ....:.tiVJ{r•.:~. . . " " . ;f i ~ ~ . i .:n.. , • 1~.•:' . y , . " ' _ _ ' ~ !.k:•?~: ll.r:::::_: . . . . . : l.1:: ~:i:.V.}•.~..... : ~ . . . . ..Y}'•. ~ . . 'l~tit ~ '::•.•.ti`.:.•..'- . .::.~t::::• L ~ Yf ti:::•.: .~.1`}. s.::f:~%:•:. ~f~i::_~~.::{•~.:~:-:•:""'::` 'J!. . ~r.'""'--"•••~ . 11~ ~ "'"..5.. J~'-::'•: 4•'::.•. - ~ ~V~1`P._. '~-•y'YfF ~ ~f{}:1•~;:•~•:_~ ~ ~•~}.f..... :1l'.'~'•~'::.•.. .•.f.j..•'%~ ~ Jf.f• • f~.•~~.'. l.•..~::i:L~~S 1:' 1::•. YA . . {~f:~.~.`:.~.`.}\11~~~ ' ~.~•.vti :::::h • 1••:::: - ` 1t~::"-::~'. 1:•::: -=::W ~.::::-::.::~:.:::::;:::•°r~.::~;.::-:•~f... . :r:::>:--;::.~ r . . c:•:: v....,.;... i . . . r.~.... ~ r..-:: ..r.;•:• . . .:.;,,r,::.:: • :•:ti.;; . . . - . . • - , - r........ . . . . . . • ..~..ti ..r:: • •.:~c'.=i::•. ::•Y.::::_.: . ):•x;:::=;-::=:'•:... .ti • : . ..?.......:.r~:::::.::~:~;::..: ...."'.tiv:""'::.4•-.:.~:.:~v:~'~""'._.•....._::.b ..ti._.... 1::::::.. .ti :r..r. .....t....-- • . "";w::..' ..r....._. ..rn..._....~ r......... .v.. 4.~:: ••":t,• : : . . . . - ....----••..r..... . :'•t'Y''::-..:_ : ' Jx... . • . .2 . - - . . . . ........--•,.x•:::'_ :;:i>:~:Y~:i : •r.~:::::e.-c ..•-•--.,.L....---.. •.ct a..---•• : :.~:::._:rr• .1.~ L , ..:..::r -.::....."''..4..,~ _ •<::.~.:~.~Yh. . . 4..""'• ~r ; :wn.vh 1v' . „ . ......,~v.:~ , .r:::: ....+}~v..."" . ~ _ , . ..f. . .._.._...f....----••• ............----...y.ti , .'f`.:,::-:":.:':''• . . >:~t'~',• , ~ . ~CT`... r.....:.. r...... - --..~..:::___-:_.:_:::ri:.::::.:::.::. ~ . . . . . . . . . . ::•~.,s........ r,.:: . .r :::.v:~, . . r.~:{.}~:.Y: " :""•:....""'..::r:::: • • h.."'. . ..r..------ • ~l ' -•••~,}'F . . ..L~ . .l'?{._ r " .lJ..~::: .....}~..........Yt:::- :::'.•f.`r•::•::.'.'.~.t . I~:h.....::.:5...._...................~.. ...1~.... ..."........•.{..........{{~........1...... . ......._........I...__._......... . ..............._....Yfti~-:.':':..'::.Y.~j' • . TYPE OF CONFERENCE Pre-Application Pre-Consiruction Other; , OATE: ~ TIME: DOC.UMENT'S ClRCULATED DATED REVISED APPLICATION . . ~ . . . . ~ SlTE PLAN ✓ , DRAINAGE PLAN IANDSCAPE PLAN Oihpr: : Other: . , ~ . ~ . . . . . ~ AD.DITIONAL~INFORMATION LAN l°iPE eca,,.T [ t'ln A- r t5~ . ~ CIRCULATEO TO CIRCULATEO 6Y: OATE: SCaPCA-M. Caine Utilities Engineering Fire District # ~ Health Oisirici Uberty l.ake Sewer Questions? Contact Jeff Forry or: fPlanning Other: . Spokane County DIVISION OF BUILDINGS Wesi 1303 8roadway Spokane, WA 99260 t5091456-3675 fnff;f~nl e.r «nn~ A-M`3 fE^--` O n `iiY'°` ~i ' i~.~.3~/'yI: . . . w . , :O . _ ' . ~ 1~ • e L~~~,~W~`~~+C'~a► . • L~ t~.t~~~r~?' , • '~~)+~~+k~1~'~r".: ' ; •c . - : ; ySY:i3•+ t1i:`y~, C 4~ s? 4 t •~,•v ,'Ji• ' y:; ~~tw•:y. '1~::.~ ~ . . , .y.t;~*~ t•,yJ ".(y'~I y~ x?~~`!t'S~'~"{t_.'~ , `~t~,t'.,. ~..r.~':'3 •,~.~~~~-s,~i.~'n-~1a,,~;,, s~ St;'A '..,-~.t %~'•X~~a J : i ` ' .:ef ~•~f ~-~r+-d':~~? .a 1' ,~t'~?~t: a• , . ~~y~' . , • ,'a •;:~~i-' C-`.~a:'~,i•y /'h.t. FZ.;'.`i4~v I-~.. ro v iittl ~yli'j~ 'f`~i:;~~ ~ ~ ~-~.ti~'~~,ri.:~.•.,' . .1~<i..':•• ~ '~r F = ~ ,.Y~ _ ' ~ ~ , •ti'~ r. a., ri, N: 8026 fVlarket Street Ng~' Spokane; WA 99207 Glark ~ ~otvs- f ''-~-;r, •~i~ ~ (509) 467-6609 FAX (509) 467-0630 n cl sca p~.n ~t~nt ractors: a- •Contractor's Lioense Number & Wurscrymcn . r;~•. . CLARKS220DH ' •Lt'°' . • ROPOSAL SUBMITTEO TO PHONE : ' OATE , ~-K & M UNIBODY WORKS INC (JIM) 922-2083 FAX:922-084 , 9/10/91- 4REET ~ GTY, STATE ANO 21P COOF.,.;:, . . ~ , . . , . . F~2011 N:• `PARK RD SPOKANE, WA 99212 ~ BARR.;.&`. SHRUBS INSTALLED_- - ~ ` - S 0 .=pMUGHO;`- .3- FORSYTHIA; 40- ARB; 4- GOLD TIP; 5- BURNING*BUSH•' • •Y = - 3- BARBFRRY, 9- POTENTILLA, y!;.~•.'.~ .~i ~ . _•r.. ~ ' ' ::.•1i,-.. t~T'~•"~`-'~: :.,w~y.f'Y,;,n. ' . -:'M 'r~;~r . , ~ " :•,y, . . ~ ELTONIE JtJNIPER _ _ _ . _ _ . - ~'"~.~°sY~"~~~`' " . ~ " ~~=:~rP'~j~`,~+.9y'` " - .~W:S:•rf,:i••Z;,a.: '•,'r~.~'~'. ~°,,~CUBICYARD$ BARK - - . . -:;i;,~,~.~:~~;.:.._ , - . :~~•ti- ~ a.:r.L ~.~:•_~;,i =g„{~,; y. • • ,.tt.t:~'"`:x~~• s-:-lx ~;i~~ f,~ - . - . . . . . _ W . ~ ~ ~ - ~ ~ . ~ • : . : ZBOBCAT~&~~LA.BOR ~ ~ ~ • . ~ , . : t ' y - ~ . . f r a~' ;~,oy~~;~;;:~ ~ • _ _4 °~t'~'~S'~"~ . ,,u•.f!~1 '•=f;':,..'.:`:,~.`':• ~ • ~ _ . vXiti% "~3 ~ v " ~1 ~%'S~'-• - -W ~ • 18.00 ' . ~ • . : -`~w°~`'~3?~ r~ yDITI~ON.{6-~ ASPEN TREES 1J CAL . e_~___._._ ...t,-._~.~:I,::,~:r: O • r x:~~~ r 201~. 0 . . . . ~..v,. • . _ _ _ . '~'f.=?f•~ ~ ~4. . . • c •~'"y y^t .~.a•: ~ISc~ IN~~f:i'.. . . SUB TOTAL~ . , 91-9 .yoo~.~..._ • • • •~J'~ ~~~irj~,j3;•lsa~~y F' ~1~ T ~V,yi~~g }f"..~ ~ . - ' ' ..j'..ti-i4. ~ y/'..y,~t ~ 1\:.iry ~ . . - • : t ' 3a,: t : e C L PLU S TAX 1 .1 1 V O ~i ; ra;' /`1,~.7';iY. ' • ' . _ _ . _...~.~..._m.-_._...~._ ~'..'t~:-• . _ 3 . . ~~y ~ ~ - _ ______1..__.w_...- _ BID_ TOTAL - -$~2 -0 70. 60 ~t ~ - - . ~ . : _~,~OWNER'.WILL'`;BRING AREA _ TO ~LEVEL WANTED FOR BARK; NO WEEDS, FINE GR.ADED- . . _ . . _ . - _ . ~~EADY~~`.FOR ~ 2" BARK AND PLANTING SHRUBS & TREES . ......~.~..Y.+'~,.'• ~ ~ . y.'`• . : 5M1>.~._1• . - . t r'.+ ` - • ~t~~+~s~~~pi.. `a.• • • - • - - - - : ...fy. r•`•.~.~i<'/'t. . . . ` ' _ , 4- ~-•,r • ~....~~._.J~-......a.~~.. . . . _ . _ _ ~ _ . ._~....J.~~ ' ~:tr- . - ~ ..,r_.~ e....... . : !~'~t' • ' ~ s,• . ' , ti . i. ~ ~W~`; t ~ . . •~y,~ ' j . - ~ ' . ~,.j. 1'~' .•i:~ •ry+`.'~ ~"~_S" :Permits and Dum Fees If Need ~ l ~ ~ - ~ ` :r::;-`~.♦i:~~~j~`~- ~ .K , ~N . p , ed, Wii beat Additional Cost AlI':Bids Subject to State Sales Tax ~'No Nursery.Stock is, Guaranteed ABe hereby to furnish -material and labor - compiete in accordance%.with °.above -specifications:3,or thp-4~rh,. - ~ a:; G=~.'•?E ! TWO THOUSAND SEVENTY AND . 60 / 100---------------------------------- (b 2.9 070. 60 Payment to be made as follows: dollar5 Down and Balance upon Completion ~ `Ar+a • , ' . . - ,t,` - - , , c,, t'' ~.--o~: . .•-~.:-~y ~ . . . . . . 1 •~llnless otfier gree ents are made in vuritin8, the entire balance in the amount If-by reeson oi any default on Me part of the contr~ctwp party to pty,tM ~ aino~xn,sc;a,~ 6~ is due and payable at the completion of the job. A °O~UO^ oi the job wit}wui a writcen prean~ru to tM oontrary, .r,d n~oo~,,.. n.o,.wr b, qrk.e t {of 0- Zv 0] Sons co eanPJov an attornsy m ootleet wrta dus and owirg.lMn the aontrsctlnp WY 04 PW qWtc.6 ~finance charBe of 1296 per annum shall be cherged on any unpaid amounts Sane reason" ,ttorW, f„a~ 01a al com wW expana kwumW aexpwidW by Ctwt eSom In:I ,~innine wfien the job IS completed." oon,ect~on wh~, wd, dete~Re. In a,e.venc a~ec w!c M to on dh oont,ct, ov*W. qw« that the ection shsW be broupht b tha ,'v • • State of.Wpt~ktiy of . . r . . ^ y . . • , . . ~ ` . . ~ - ofe: This,proposal may be Authoriz 'rithdrawn~by•us'if'not accepted within THIRTY days. Signature ~ •~;,~k.. - . - . . _ ~ . . ;Atip~tup tif -frupr►s~i - The above prices. speci(ications rind tonditions' are satis(actory and are hereby accepted. You are authorized Signature i `do`the*work as specified: Payment will be made as outlined above. ' • ~ . .e ~'!Y ~ • ' ! ot'AccePtante: L!= r' Signature . ~ ~ • ~ . • • I ~ BEFORE THE SPOKANE COUNTY SHORT PLAT ADMINISTRATOR IN THE MATTER OF ) FINDINGS OF FACT SHORT PLAT N0. SP-85-394 ) CONCLUSION AND DECISION THIS MATTER, an appl ication from Bri an T. Butl er for the approval of a Short Plat, pursuant to Spokane County Resolution No. 78-291, came before the Spokane County Short Plat Administrator on the 23rd day of July, 1985., Naving reviewed the records cind files in this matter, the Spokane County Sho rt Pl at Admi ni strator makes the fol 1 owi ng : FINDINGS OF FACT AND CONCLUSION I. That the Spokane County Comprehensive Plan indicates this site to be wi thi n the Industri al Category and wi thi n the Pri ori ty Sewer Servi ce Area. II. That the uses and lot sizes proposed by the plat sponsor appear to be consi stent wi th the Industri al Category of the Comprehensi ve Pl an. III. That the existing zoning for this site is Restricted Industrial and Aquifer Sensitive Area Overlay Zone. IV. That when the zoning for this site was changed from Residential Office to Restricted Industrial (ZE-82-84) in September of 1984, certain conditions were placed upon any development of this land. V. That proper legal notification was given for this proposal. VI. That the owners of ad,jacent lands expressed neither approval nor di sapproval of thi s proposed use. YII. That appropriate provisions have been made for sewage disposal, water supply, storm water control, ci rcul ati on, fi re protecti on and other necessary public facilities and utilities. VIII. That the proposed use is not detrimental to the general purpose or otherwi se ha rmful to the publ i c heal th, safety and wel fa re. IX. That no significant adverse environmental impact will likely result from approval of thi s proposal. TNEREFORE, the Spokane County Short Administrator hereby issues this DECISION Short Plat application SP-85-394 is hereby APPROYED subject to conditions which shall be complied with by the applicant and/or sponsor prior to f i nal i zati on of the short pl at. Dated thi s Z3LW da of 198 Y , 5. J S FINDINGS OF FACT, CONCLUSION AND DECISION (cont'd) SP-85-394 CONDITIONS OF APPROYAL FOR SHORT PLAT #SP-85-394 PLANNING l. That the preliminary plat be given conditional approval to August 1, 1988. The Short Pl at Admi ni strator ma~y admi ni strati vely approve a request for a one year extension of time if the sponsor submits a wri tten request forty-fi ve (45) days pri or to the above expi ration date. A request for an Extension of Time may subject the proposal to new condi ti ons requi red by revi ewi ng agenci e s. 2. That the plat be designed as indicated on the preliminary plat of record and/or attached sheets as noted. - 3. That a statement be placed in the dedication to the effect that no more than one allowable use as determined by the Spokane County Zoning administrator be placed on any one lot, nor shall any lot be further subdi vi ded f or the purposes of creati ng addi ti onal 1 ots or bui 1 di ng si tes without filing a replat. 4. That appropri ate street names be i ndi cated. 5. That appropri ate uti 1 i ty easements be i ndi cated on copi es of the approved prel imi na ry pl at for di stri buti on to the P1 anni ng Department and the uti 1 i ty compani es. Wri tten approval of the easements by the uti 1 i ty company must be received prior to the submittal of the final plat. 6. That a certificate of title be furnished the Planning Department prior to the filing of the final plat. 7. That a survey be requi red pri or to ttiie ri 1 i ng of a fi nal pl at. 8. The condi ti ons of ZE-82-84 shal 1 be compl i ed wi th i n conj uncti on wi th aRy devel opment of thi s si te. COUN7Y EN6INEER DEPARTMENT 1. That conditional approval of the plat by the County Engineer is gjven subj ect ap proval of the road system as i ndi cated i n the prel i mi nary pl at of record, 2. A statement must appear in the dedicatory language of the plat that i ndi vi dual dri veway access permi ts be requi red pri or to i ssuance of a building permit for driveway approaches to the County Road system. 3. The word uappl icantu shal 1 i ncl ude the owner or owners of the property, his heirs, assigns, and successors. 4. That private road(s) be improved to Spokane County standard for a private road Urban-Suburban standard serving four lots. Subject to approval under section 10.207 of the Spokane County Fire Code. 5. That the following statement be placed in the plat dedication: WARNING: Spokane County has no responsibility to build, improve, maintain, or otherwise service the private roads contained within or providing service to the property described in this plat. 6y accepting this plat or subsequently by al l owi ng a bui 1 di ng permi t to be issued on property on a private road, Spokane County assumes no obligation for said private road and the owners hereby acknowledge that the County has no obligation of any kind or nature whatsoever to establish, examine, survey, construct, al ter, repai r, improve, mai ntai n, provi de drai nage or snow removal on a private road. This requirement is and shall run with the land and sha11 be bi ndi ng upon the owner, thei r hei rs, successors or assi gns i ncl udi ng the obligation to participate in the maintenance of the private road as provi ded herei n. 2 FINDINGS OF FACT, COHCLUSION ANQ DECISION (cont'd) SP-85-394 COUNTY ENGINEER DEPARTMENT (cont'd) 6. The proposed plat shall be improved to the standards set forth in Spokane County Boa rd of Commissioners Resolution No. 80-1592, as amended, which establishes regulations for roads, approaches, drainage, and f ees in new construction. , 7. That pri or to the rel ease of bui 1 di ng permi ts for any of the parcel s within the proposed plat, the applicant must comply with the Conditions of Approal which were specified for Zone Change ZE-82-84. 8. That the appl icant wi 11 be requi red to construct concrete curb and sidewalk along the frontage of Parc el "A" prior to the release of a bui 1 di ng permi t. Concrete si dewal k wi 11 al so be requi red for Parcel s uBu, uCy & u0" pri or to rel ease of bui 1 di ng permi ts for those parcel s. 9. Access to tracts wi thi n thi s proposal shal 1 be by the pri vate road as shown. The plat dedication shall state "Direct access from Park Road to any tract wi thi n thi s short pl at is prohi bi ted. COUNTY HEALTH OI STRICT l. A combined surf ace water and sewage disposal detailed plan shall be approved by the County Engineer and the Spokane County Nealth District pri or to the i ssuance of any bui 1 di ng permi t for thi s project. 2. The dedi catory 1 anguage of the pl at wi 11 state that: "Subject to speci fi c application approval and issuance of permits by the Nealth Officer, the use of individual on-site sewage systems may be authorizedu. 3. Water service shall be by an existing public water supply when approved by the Regional Engineer (Spokane), State Department of Social & Health Services. 4. Prior to filing the final plat, the sponsor shall present evidence that the pl at 1 i es wi thi n the recorded servi ce a rea of the water system proposed to serve the plat. The dedicatory language on the plat shall state: "Use of private wells and water systems is prohibited." 5. The plat dedication wi11 contain a statment to the effect that: "The public water system as approved by County and State health authorities and the local fire district and purveyor will be installed within this pl at, and the subdi vi der wi 11 provi de for i ndi vi dual domesti c water service as well as fire protection to each lot prior to sale of each lot." 6. Disposal of sewage effluent beneath paved surfaces is currently prohibited. 7. Prior to filing the final plat, the sponsor shall dernonstrate to the satisfaction of the Spokane County Health Oistrict that suitable sites for on-site sewage disposal systems are available on all lots. COUNTY UTILI7IES DEPARTI+IENT 1. The owner(s) or Successor(s) in interest agree to authorize the County to pl ace thei r name(s) on a peti ti on for the formation of a ULID by peti tion method pursuant to RCW 36.94 which the petition includes the Owner(s) property and further not to object by the si gni ng of a protest peti ti on against the form ation of a ULID by resolution method pursuant to RCW Chapter 36.94 whi ch i ncl udes the Owner(s) property. PROVIDED, thi s condition shall not prohibit the Owner(s) or Successor(s) from objection to any assessment(s) on the property as a result of improvements called for i n conj uncti on wi th the formati on of a ULID by ei ther peti ti on or resolution method under RCW Chapter 36.94. 2. Any water service for this project shall be provided in accordance with the Caordi nated Water System Pl an for Spokane County, as amended. 3 ( > FINDINGS OF FACT, CONCLUSION AND DECISION (cont'd) SP-85-394 COUNTY UTILITIES DEPARTMENT (cont`d) 3. Each unit shall be double plumbed for connection to future areawide col 1 ecti on systems. 4. Thi s acti on shal 1 be condi ti oned wi th the performance cri teri a of Section 4.16A.050 Aqui fer Sensi ti ve Area Overl ay Zone for al 1 fu'ture uses. B UI L DI NG & SAFETY DEPARTMENT 1. Those condi ti ons as attached i n ZE-82-84. APPROYED TNIS ZSA DAY OF 1985. ~ SPO 10UN7 SNORf-PTAT aDMI hfISTRATOR cc: Heal th Oi strict Engineer Utilities Bui 1 di ng b Safety Applicant Su rveyor File 4 ~ 8509230192 i DECLARATION OF COVENANT REQUIRiNG PKIVATE CONS'TRUCTIUN ANU MAINTENANCE OF SHORT PLAT APPktOVED PRIVATE ROAD, AND DEllICATION TU TtiE CUUNTY WHEN REQU I EZED. "Ueclaration of Covenant ~ 1"In consideration of the approval by Spokane County of short plat ll S_jqn which said pla[ creates ()qXkQM ( 4 lots) described as follows: 2Lots A,B,C and D of Short Plat Number 85-394 more particularily 3:. described as follows; 4 The East 140 feet of Tracts 1 and 2 of O'Conner's five acre tracts, as measured along the South line thereof,according 5 to plat recorded in Volume "E" of Plats, page 12, in Spokane County, Washington. ~ ~ 6; the undersigned covenants and agrees that: - 7 ~ "1. The owner(s) of the aforedescribed property or of any lot which has been or is subsequently created on said property shall be responsible for the 8 Ifinancing for consrruction and maintenance of all private roada within said short plat. 9 ' ~ "2. The road shall be improved consistent with Spokane County standards lU for yhort plat private roads. I 11 i "3. Maintenance inethods, s[andards, and financing shall be in a manner , de[ermined by the owners of a majoriCy of the square footage of buildable land within 12 such aforedescribed property. ~ 13 "4. In [Ile event such private road is improved to Spokane County standards for public street8 and the County is willing to accept the dedication of such road, 14 each lot owner shall execute any documente neceesary to accomplieh such dedication. 15 ( "S. Ownera of lots within [he above referenced ehort plat who are served ' by such road, may sue and recover from any owner of any lot within the short plat 16 , which is similarly served who refuse8 to participate in the road construction, financing, and maintenance. Such ownere who refuee to share the costs under the 17 percentage set forth above shall be liable for any attorneys fees. ( 18 : "6. WAKNING: Spokane County has no responsibility to build, improve, or ; maintain or otherwise service the private roads contained within or providing service 19 , to the property described in thie plat. By accepting thie plat or subsequently by allowing a bi,ilding permit [o be issued on property on a private road, Spokane County 20 assumes no obligation for said private road and the owners hereby acknowledge that the County has no obligation of any kind or nature whatsoever to establish, examine, 21 survey, construct, alter, repai.r, impruve, maintain, provide drainage or snow removal on a private road. This reyuirement is and shall run with the land and shall be 22 bi(iding upon the owner, their heirs, successors or assigns including the obligation to participate in the matiitenance of the private road as provided herein." 23 '4 ~ 0 n ` ner lr, , S'fA'CE UF WASHINCTUN ) Cc)UNTY c)F S!'UKANE ) ss 'L ? ~ ~ . chn ~hLS 9daY pNrsunallY aP Peared before me ! h k iY6 wYi to~ me to he the inciiviciual(s) described in and wtio executed the within and foreboing intiCrument inci acknowl0ci);te1 that they signed the same as their Eree and voluntary aet aii(i c1ect1 for the tises :inc1 ptirposes therein st:ited. ~ Civen undNr my hand an aFf xed my official seal this 19~~"- . Z~z ~4~co~ Norary N„hlic i' in rint_i fur the tiCate of Washinbton, re, td i nK ae 5pokarie,, Wash i nb to~n. , ~ - - File No. ZE-82-84 SPOKANE COUNTY NEARING EXAMINER COh1MITTEE FINDINGS AND ORDER A. INTRODUCTION This matter having come before the Zoning Hearing Examiner Committee on September 6, 1984, and the members of the Committee present being Kenneth Kennedy, Chairman, Kathleen M. Carstens and F. Lynn Tennican. B. PROPOSAL The sponsor, Brian T. Butler, is requesting approval of a zone reclassification, File No. ZE-82-84, Residential Office to Restricted Industrial, for the purpose of developing General Industrial Uses (No Site Plan). C. FINDINGS OF FACT 1. That the existing land use in the area is residential, commercial, grain storage, railroad tracks, and vacant. 2. That the Comprehensive Plan designates this area as appropriate for Industrial development. 3. That the existing zoning of the property described in the application is Residential Office. 4. That the provisions of RCW 43.21C (The State Environmental Policy Act) have been complied with, and the Committee concurs with the Declaration of Non-Significance. 5. That the proper legal requirements f or advertisement of the Agenda Item have been fulfilled. . 6. That the land in this area, especially along the west side of Park Road, is suitable for the proposed use, or uses within the proposed Zone Classification, but is not necessarily compatible with the adjoining residences east of Park Road. 7. That the applicant has not demonstrated that conditions have substantially changed since the original zoning of Residential Office in 1973 of this area and can only be justified with site specific mitigating measures. 8. That the proposed use can be made compatib1e with existing uses in the area, if adequate buffering techniques are imposed. . ~ ZONE RECLASSIFICATION N0. ZE-82-84 C. FINDI14GS OF FACT (continued) 9. That the owners of adjacent lands expressed strong disapproval of the proposed use. 10. The Hearing Examiner Committee finds the proposed use may be in harmony with the general purpose and will not be otherwise detrimental to the public health, safety, and welfare, if appropriately conditioned. 11. The following are additional findings of fact considered by the Nearing Examiner Committee: a) That this parcel serves as an unique transitional buffer between existing industrial uses west of Park Road and residential areas to the east of Park Road. The residential area is we11 established and predates most industrial development in the area; including the several rezone attempts on this site. Testimony f rom the applicant's representative indicated that extensive buffering techniques and mitigating measures could be very expensive in terms of material and loss of developable land. However, the Comprehensive Plan, past land use actions, and public testimony indicated the need to protect the residential area f rom encroaching industrial development. Approval of the zone change f rom Residential Office to Restricted Industrial can only be justifiable if all mitigating measures, as recommended by Staff, are imposed on the property. D. CONDITIONS OR CONTINGENCIES APPLIED TO THIS APPROVaL (Al1 Conditions imposed b the Zoning Hearing Examiner Comnittee shall be binding on the "applicant", which term shall include the owner or owners of the property, heirs, a'ssigns, and successors.) a) COUNTY PLANNING DEPARTMENT 1. Approval by the Zoning Administrator of a specific lighting and signing plan for the described property prior to the release of any bui 1 di ng permi ts. 2. A specific landscape p1an, planting schedule and provisions for maintenance acceptable to the Spokane County Zoning administrator shall be submitted with a performance bond for the project prior to release of building permits. Landscaping shall be installed and maintained such that sight distance at access points is not obscured or impaired. 2 ZONE RECLASSIFICATION N0. ZE-82-84 a) COUNTY PLANNING DEPARTMENT (continued) 3. D i rect 1 i ght f rom any exteri or area 1 i ghti ng f i xture shal 1 not extend over the property boundary. 4. The specific development plan will be submitted for Planning Department review and approval prior to issuance of building permi ts. 5. Al1 current standards of the Restricted Industrial Zone, as amended, shall be complied with in the development of this site. f. That the project is subject to Section 4.16A.050, the Aquife r Sensitive Area Overlay Zone of the Spokane County Zoning Ordinance, which sets forth various measures for Aquifer protection; specifically, measures dealing with wastewater disposal, spill protection measures, and stormwater runoff. - 7. That the present proposal is not detailed enough to determine whether or not the use of or materials stored on the site are in compliance with Chapter 4.16A (Aquifer Sensitive Area Overlay Zone) of the Spokane County Zoning Ordinance. Accordingly, as a condition of approval, the sponsorlapplicant shall be required to file with the Spokane County Auditor, within thirty (30) days of the signing of Findings and Order of the final decision in this matter, a"Notice to the Public" which shall provide in materi al as fol l ows: PRIOR TO THE ISSUANCE OF ANY BUILDING PERMIT OR CERTIFICATE OF OCCUPANCY FOR ANY BUILDING OR ANY USE ON THE PROPERTY DESCRIBED HEREINAFTER, THE APPLICANT SHALL BE RESPONSI6LE FOR COMPLYING WITH THE PROVISIONS OF SPOKANE COUNTY ZONING ORDINANCE CHAPTER 4.16A (AQUIFER SENSITIVE AREA OVERLAY ZONE). THE PROPERTY WHICH IS THE SUBJECT OF THIS NOTICE IS h10RE PARTICULARLY DESCRIBED AS FOLLOWS:....". 8, applicant shall comply with '208' recommendations concerning stormwater runoff and provide necessary 1andscaping for runoff. ~ 9. Any division of land for the purpose of sale, lease or transfer, shall comply with RCW 58-17 and the Spokane County Platting Ordinances prior to issuance of building permits. 3 ZONE RECLASSIFICATION N0. ZE-82-84 a) COUNTY PLANNING DEPARTMENT (continued) 10. That the provisions of SEPA's NOTICE OF ACTION pursuant to Chapter 43.21C.080 RCW and the Board of Spokane County Commissioners Resolution #77-1392 be initiated by the project applicant within thirty (30) days of final dis'position of this application, and prior to any on-site improvements, or file appropriate documents to the effect that the tJOTICE OF ACTION is waived in accordance with Spokane County Commissioners' Resolution #82-0458 dated May 4, 1982. 11. Pursuant to the provisions of Chapter 43.21C RCW, the SEPA Guide1ines (WAC 197-10) and the Spokane County Environmental Ordinance (SCEO), a proposed declaration of non-significance has been issued at least fifteen (15) days prior to this date; the official file, written comments and/or public testimony contain information regarding assessment of the proposal's likely significant adverse impacts to the physical environment; a finding is hereby made that no probable significant adverse impacts upon the physical environ ment are anticipated as a result of the project; and a final declaration of non-significance is hereby to be issued. 12. That all areas within the front yard setback off Park Road be planted and maintained in dense landscaping, except access point, as approved by the Zoning Administrator. 13. That no parking, storage, or loading dock be allowed on the Park Road (eastern) portion of the site. Also, that a11 traffic and activity be oriented to the western portions of the site. 14. That only one access point be allowed f rom the site to Park Road, to be as approved by the Zoning Administrator and the County Engi neer. b) COUNTY ENGINEERING OEPARTMENT Prior To The Issuance Of A Building Permit: 1. Access permits fior approaches to the County Road System shall be obtained f rom the Spokane County Engineer. 2. Other specific improvements: Applicant shall construct Portland Cement concrete sidewalk along Park Road per Spokane County standards. 4 • ZONE RECLASSIFICATION N0. ZE-82-84 b) COUNTY ENGINEERING DEPARTMENT (continued) 3. Applicant shall submit for approval by the Spokane County Engineer road, drainage, and access plans prior to the issuance of a building permit on the property. 4. The applicant shall submit for approval by the Spokane County " Engineer and the Spokane County Health Uistrict a detailed combined on-site sewage system plan and surface water disposal plan for the entire project prior to the issuance of any building permit on the property. 5. A parking plan and traffic circulation plan shall be submitted and approved by the Spokane County Engineer prior to the issuance of a building permit on the property. The design, location, and arrangement of parking stalls shall be in accordance with standard traffic engineering practices. Paving or surfacing as approved by the County Engineer, will be required for any portion of the project which is to be occupied or traveled by vehicles. 6. The word "applicant" shall include the owner or owners of the property, his heirs, assigns, and successors. 7. The construction of the road improvements stated herein shall be accomplished as approved by the Spokane County Engineer. 8. All required improvements shall conform to the current State of Washington Standard Specifications for Road and Bridge Construction, and other applicable County standards and/or adopted resolutions pertaining to Road Standards and Stormwater Management in effect at the date of construction, unless otherwise approved by the County Engineer. 9. Roadway standards, typical roadway sections and drainage plan requirements are found in Spokane Board of County Commissioners' Resolution No. 80-1592 as amended. 5 ZONE RECLASSIFICATION N0. ZE-82-84 c) COUNTY UTILITIES DEPARTMENT l. The owner(s) or Successor(s) in interest agree to authorize the County to place their name(s) on a petition for the formation of a ULID by petition method pursuant to RCW 36.94 which the petition includes the Owner(s) property and further not to object by the signing of a protest petition against the formati on of a ULID by resol uti on method pursuant to RCW Chapter 36.94 which includes the Owner(s) property. PROVIDED, this condition shall not prohibit the Owner(s) or Successor(s) from obj ecti on to any assessment(s) on the property as a resul t of improvements called for in conjunction with the formation of a ULID by either petition or resolution method under RCW Chapter 36.94. 2. Any water service for this project shall be provided in accordance with the Coordinated Water System Plan for Spokane County, as amended. 3. Each unit shall be double-plumbed for connection to future areawide collection systems. 4. This action be conditioned with the performance-criteria of Section 4.16A.050* for all future uses. * Aquifer Sensitive Area Overlay Zone. d) COUNTY HEALTH DISTRICT l. A combined surface water and sewage disposal detailed plan shall be approved by the County Engineer and the Health District prior to the issuance of any building permit for this project. 2. Sewage disposal method shall be as authorized by the Director of Utilities, Spokane County. 3. Subject to specific application approval and issuance of permits by the Health Officer, the use of an individual on-site sewage system may be authori zed. 4. Water service shall be coordinated through the-Director of Utilities, Spokane County. 6 . ZONE RECLASSIFICATION N0. ZE-82-84 d) COUNTY HEALTH DISTRICT (continued) 5. Water service shall be by an existing public water supply when approved by the Regional Engineer (Spokane), State Department of Social and Health Services. 6. Use of private wells and water systems is prohibited. 7. Disposal of sewage effluent beneath paved surfaces is currently prohibited. e) COUNTY BUILDING AND SAFETY DEPART14ENT 1. The site is located in Fire District # l. 2. Fire hydrants which meet the fire flow are required to be installed prior to construction. These hydrants shall be placed so that no portion of the building exterior is more than 175 feet from the hydrant. The bottom of the 1 owest outl et of the hydrant shall be no less than 18 inches above grade. A water plan showing each fire hydrant (specifying the gallons per mi nute for each f i re hydrant ) and meeti ng the re-qui rements i n Chapter 10.04 of the Uniform Fire Code is required prior to construction of the water service. 3. Approved numbers or addresses shall be placed on all new and existing buildings in such a position as to be plainly visible and legible f rom the street or road fronting the property. Said numbers shall contrast with their background. 4. Trash enclosures shall not be located adjacent to combustible construction or underneath windows or nonprotected eaves. f) WATER PURVEYOR l. Water Purveyor is Spokane Suburban Water Company, and they will . supply the site with adequate water for domestic, fire and irrigation uses. 7 ZONE RECLASSIFICATION N0. ZE-82-84 g) COUNTY AIR POLLUTION CONTROL AUTHORITY 1. Air pollution regulations require that dust emissions during demolition, excavation and construction projects be controlled. This may require use of water sprays, tarps, sprinklers, or suspension of activity during certain weather conditions. Haul roads should be treated and emissions from the transfer of earthen material must be controlled as well as emissions from all other construction related activities. 2. Measures must be taken to avoid the deposition of dirt and mud f rom unpaved surfaces onto paved surfaces. If tracking or spills occur on paved surfaces, measures must be taken immedi ately to cl ean these surfaces. 3. All travelled surfaces (ingress, egress, parking areas, access roads) must be paved and kept clean. 4. Some objectionable odors will likely result during the construction phase of a project and f rom motor vehicles using the site following completion of the project and from occupants of the proposed project. 5. SCAPCA Regulation I, Article IY requires registration with this Agency. 6. SCAPCA Regulation I, Article V requires that a Notice of Construction and Application for Approval be submitted to and approved by our Agency prior to the construction, installation or establishment of an air pollution source. 7. SCAPCA Regulation I, Article VI and SCAPCA Regulation II, Article IV addresses emission standards. All emission standards must be met. 8. All air pollution regulations must be met. ORDER The Hearing Examiner Committee, pursuant to the aforementioned, finds that the application of Brian T. Butler for a zone reclassification as described in the application should be APPROVED. Motion by: Tennican Seconded by: Carstens Vote: Tennican - Aye Carstens - Aye Kennedy - Aye Unanimous to APPROVE to the RESTRICTED INDUSTRIAL ZONE - ( 3 - 0 ) 8 i ' . . ZONE RECLASSIFICATION Nb. ZE-82-84 E. ORDER (continued) HEARING EXAMINER COMMITTEE HEREBY ATTEST TO THE ABOVE FINDINGS, ORDER, AND YOTE Chai rman , ~ 1 ~ ATTEST: For WALLIS D. HUBBARD Planning Director ~10'W B y sT~vE os Zoning Administrator D a te : 9 r ` ! c; - 4 . BLDG. PERMIT # - or = FILE # • :Sr (~J r ' DGl L4r L%J eY lew V Date Received 3-11 ° 9 - z ~ 1'raject Narne No. Lots) IVa. Acres ~ ~DRESs PARCEL# S S } L-I' Sponsor's Name a;;~17 ~~A-4 P h o ne # 4~2e~~~~~`,~, ~ Address Work # ~ Date conditians mailed Contact persan ~ 6UW-71 - Phane ~ 9e>l' ~ ~ 64,C-S . ,FLOOD ZONE Yes Na:.~ Engineer f Surveyar's J Architect's Name Water _ Address Sewer - - Schoo! a Planning Contact Person Phane t~ - l , Date Submitted Descriptian Initials I ~ ; . ~ . ~ i , ~ - , ~ - ~ , .~w ~ ' • * •f • PROJECT ; IS ITEM ITEM , DA'I'E REQ[~IRED DEsCRTPfiiON RECIEVEn . ~ DRPiTNAC3E CALCUTATxONS 208 SWALE bETAIL - - ~ BENCH MAF1{ ARCHITECfiSf ENGINEEFtS S'g'ANIP - - ~ DRY'WELL CALCULATIONS REfiURNED CHECK PRINT - - RECORDED PROPERTY DEED RECZEVED ~ - RIGF-iT OF WAY (SIGNED) PuBLIC NoTICE (sIGNEa ) PAcxET TO RIGxT oF wAY FaR ~~~PARATzON R~~~ DRAIrrAGa~ PLAxS BoND - APPRoAcx ~ERMxTS ~ . AGREEMExT To PAY FEEs ~ . - ~ . . , SPOKANE COUNTY DEPARTMENT OF 6UILDINGS W. 1303 BROADWAY AVENUE SPOKANE, WASHINGTON 99260 (509) 456-3675 I certify that I have examined this permiVapplication, state thet the information contained in it and submitted by me or my agent to compile said permiVapplication is true and correct, and authorize Spokane County to proceed with processing. In addition, I have read and understand the INSPECTION REQUIREMENTS/NOTICE provisions included herein and agree to comply with same. All provisions of laws and ordinances governing this type oi work will be complied with whether specified herein or not. I understand that the issuance of this permiVapplication and any subsequent fnspection approvals or Certificates of Occupancy shall not be construed to give authority to violate or cancel the provisions ot any state or local lew regulating constructfon, or es a warranty of con(ormance with thQ provisions of any state or local laws regulating construction. SIGNATURE OF APPLICATION OWNER OR AGENT DATE ' • . . _ . ~ t • ~ ~ 1 ~ 6 ( 1 ~ { . C , ~ • , . . ; ~ ; , ; . 1='AC E=- 01 F~0..1[:GY ~ll.tC•::r~~~ y~00i t) 4 i ~1F'r~'~. r cn~r oN . n~ar~:.= 03/ 11/5~ i THIS IS N(]T A h'ERr'i:CT 1='k::NAL.'1'If::S W]:L.l.. DE ASS[::S'S'[4I) FOfl C:CaMMENC7:NG WOFiI< •`-WT;1'WC)llT A f'EfiMII' ; S']:'T'E ,S'TRl_:E:T= 7420 E:: TuDI(-)NA ~ I...N ~ PARC:~:l~~=' 1:~`i:~4._.i 509 . r~1~3~iI~iC~S'S' = u'f:lK r1~lC~ W F~ 992~? ~ ~ • ~ , ~ • . PIERM:1:7' 1.15'E:: - S1'pRFaGE I:tU]:l..U]:NG . , ~ . i='i._r1T'w = 0 0 4 13 a P1..(1'T NAME = SP.._,'a94 .D L.ClCi<w LCIT= i If.lNE= 1: °°0-3 ; A'7: S'T~-~ r~f`iEra= F/~1-• f= WTD'TN~::.. UE~'TH-- S 4U R/W= ;.7in 41: OF BLDr.;S= I DwEi_.L~~GS= wATE'R r>~ST ,sPca G;ra wAT~~~ DISTUA OWNER = M:C I._I._ER, .a 7: M 1='MQNF== ~509 922 20.83 ,S'T'REE"T = ?i 24 E YiRTDC',F'F'ClF'tT AVE. AnDf°~l.:,SS=-- ,SPCll<ANE_ WA 992S . t c:caN T f) c:~~ N A M E::::: r>c~N BF;OwN . 1:1a-10 N E_ NuMBr::.F,-- 509 927- 0655 BU.r.i...DINr TE.rB~~Ci<S: 17RqNT= 30 L~FT== 43 R:CCrHT=- 20 ~ R EA R 7 . ~t~~~.~..x..~..u~t•~•h~u~u~x~x~~•~th~tt~•xat~~~tt~x~~~~€ REVI:C:W 7:Nf7ClRMAT1f.lN )iuuu~t~tit~i~•ri•ai~i~i•~a~~~c~xac~c~u~x~ l~E PA R Ttl EN T RE1r':I: CW CUi"fMh NTS ~lP (='}"C) Vftl... CqMMFAl7'S . . 1 ~ BlJ :C I._ D 1 NG Pl_ r-1 u RF. V:[ EW k i-EQtJ :t Iz ED ....a. _ _ I:iIJ]:L D l:N C, ENEF'`C;Y F`G.AN RC'VIEW Rf (.,,1ll]:REI> C N C; I NE:-*. f1 S I T' l= DRr•1:[ NAGE T 0 BE F~ EV:G k".. WED . _ _ . . _ i ~ f . i] cAL rt-1 D r.ST NEw OF; A7)I)ITT.QNAI.:. wASYE WATE::R z F'L aN IN:r.N r.; SzTE F'i._AN iREvzEw REQUxRED ~ r-~:Rr-:: D:cS-rR r:* r.R c: Fi...Ow 1*0 t:{e REVIEwEr> ~i # ~ aE )i ~i ii• ~i~'1r ~1i• ~i• ~i ~i• ~E i(• ~E~ ~i ~f ~i 3( 3c Jc ?i• ~ 3i ~i # # ii BtJ Il_ b :C NG 1=' ERM:C T ~ ~ ~t # a~ a~ # ~c n• ~t ~ r~ # # ~E )E K ~ # # )E ~k )E ~E x ~ c::caIN T F;Ac:.TaF,= SPCIKANC:: STRuCTuRF.S ~ PHONe=; 509 927 0655 s'rr<r7 E r.- r>~~~ N MuLc..AN RD . ; ~ ADx>r,E,sS= SPOi<nNE: wA 99206 N r::w-:: x RE:M 0 z»E i... nz>z) 1 T 10 NC 1..1 A N r.,E 0 F LJ 9 F-~ nwI-:i...i... ~a N~~ ,s.... cac:c:t.'. i...Dz{~._pcY i~~c;~r~ ,STCIC"~ 1: FS = z-i L, nc; wX n= 40 x 60 SG F T=:: 2400 NPRa:Ni<i...E R- N R r:::cA i-'A R I< 7: N G m 01-HAun t CraP= c:i~ I T :r. C A i._ M raY::.. N ; z> h:: ,s~ F, :r ~r~ :r. c~ N c; f~ Cl tJ f~~ 'r Y r:, r:: Q F.:~ ~r ~ v ~ ~ ~ ~Y~ :i: c:~ ~ ~ ~AREf'~OUSE E{_..2 v N 2400 qn000a 0l7 a: I'E r~ D E .sC R :c a-~IJ 0 N Qt.lANr :C TY rE E nM 0 c.1N'r r.;caMMEhCxAL vALUAr:r.caN Y 356.00 r"i...AN F,c::vIE:w F~~-E 2:11 .40 ~ ,sT A rr:- ,s•U IR c:i-4 raiR c r ^w Y 4 . ~~c> ~..~.~L) N T Y J' LJrlrr~'~ P1 1.r L:. Y 5 C:> n 9 • . 1-, 1:7 r~~j J. T TYI-- r: F c:r raMcaUNY AMcat.~NT r'n xD nMOuNT c) W:r. Nr.~ . UI(... DING ~ ~RM~ I' 64(3.86 t • . .00 ^ Ca 4 f:; . G 64B. 86 .t)n 6 4,:3 . G ti ' I'RO(.I'.SSIE-U BY : WI::.NDI'-".I_, GLOFi:L(.) F`R]: NTC::D DY : WE::N1?[E1.. , Cyl...qFZIA iF ~i• ~i• k k •k •1i ~u• -~i• i~• # 7i• 1i• # ~ ~i u ~ ~i• Ti~ )i Ji 1t• 2i• 3i• ~i k ~i ai TI••I Fl NI< Y C? ll ~x ~ x• ~k• x• a~ ~ ~}t iE 1f ~i •li 3i ~i• ii ~i• 3i• u ~F ~i ~c u a~ ae ~ ~ # F:~• ~ EIVED , . ~ . NOT CE OF TRANSMITTAL ~mAR 11 1991 ~ ; 5ruii~~~~ ;4 _ ADDRESS T° 1A ii A ~AU : PARCEL .~U . ) . l . . . . . . . . PROJECT..;.,,.: ~7oRAgr=_ B(m ~ ~ ;;,::.PR'OJECT:#::;:: rllCo fC%f ~ . . ~ . . . - ~ - . . . . .SC DE RIP.::~~ . . . . . _ - . . . . ~ - - . ~ . - . - - . _ . - - - ~ } ~ - - ~ ~ . . . . . . . . . _ - ~ : . - _ . . . : . . - . . . ; . . . . . . . . . ON~E--:#=~ =i - ~f 7 LkdE . . . . . - . ~ ~ . . ~ . . . . . - _ . _ . . . . . = . - - . . . . _ • . . . . . : . - - . , . • • •t . . . . . :v~•.. '~{..4 . ' . . . : . • . . ~ . . : ;:•.~4. . : " " . - "I.•• - . - - • • . ~.r . . . . ' . . . C. . . ...r.. . : ~ NT CO A T . . . , . . . . ~ . . v . . ~ . . ~ . . - ~ . . . . ~ ~ . . - - . - ~ . . . . TYPE OF CONFERENCE Pre-Application ~ Pre-Construction Other: DATE: ! TIME: / I ~ Ca /4N DOCUMENTS CIRCULATED ~ DATED REVISED ~ APPLICATiON I SITE PLAN DRAINAGE PLAN ~ LANDSCAPE PLAN I Other: I ~ Other: ~ ; j i ADDITIONAL INFORMATION k ~ , CIRCULATED TO CIRCULATEO BY ~ DATE ~ Air Pollution Utilities Engineering ✓ Fire District # 1 ' Health DistrictL/ Liberty Lake Sewee Questions? Contact Jeff Forry or: : Planning Other: Spokane County DEPARTMENT OF BUILDING AND SAFETY West 1303 Broadway Spokane, WA 99260 ~ (509) 456-3675 (office) or (509) 456-4703 (fax) . , . ~ . , Page 1 OFFICE OF TNE COUNTY ENGINEER SPOKANE COUNTX, WASHINGTON Project: Storage Building Date 3-18-91 Address: E. 7920 Indiana Parcel No: 12534-1509 Ret No. B91014 The County Engineering Department has completed a review of the above referenced project. The following information must be provided in order for us to proceed with our review. A) A drainage plan for the site which has been prepared in compliance with Spokane County "Guidelines for Stormwater Management". At a minimum the plan must contain: 1. Drainage calculations for stormwater volumes generated on site. 2. Calculations for total impervious surfaces contained within the site. 3. Finished grade elevations for structures to be constructed on site. 4. Finished grade elevations at the top and bottom of the 208 swale. 5. A typical cross section of.the 208 swale. 6. Calcu].ations to justify the number and type of drywells pzoposed. 7. Elevation of drywell inlets where applicable. B) The subject property is affected by the "Findings and Order" and the "Conditions of Approval" for the following land use action: 1. Spokane County Zone Change No. ZE-82--84 C) The following improvements within adjacent Right of Way are reguired prior to the release of a building permit: 1. You must submit road and drainage plans for street improvements. These must be prepared by an engineer. Plans must be prepared for the following streets: a. Pazk Road: Continue the existing sidewalk and curbing. AI1 reguired construction (sidewalk/curbing/pavement) within the Public Road Right of Way is to be completed prior to the release of a building permit or a financial guaranty in an amount estimated by the County Engineer to cover the cost of construction or improvements shall be filed with the County Engineer. Required plans are to be submi.tted prior to estimati.ng the amount of the financial guaranty or permit release. . , Page 2 2. Approach permits must be obtained from the County Engirieeri.ng Department for driveway approaches to the following streets: a. Park Road D) Insutficient information was submitted with the proposaJ.. We are unable to proceed with our review. We will need the following before we can proceed: 1. Site Plan. 2. Drainage plan as specified. 3. Other information: a. Surface water disposal plan if the project is to be phased. b. A parking and traffic circulation plan must be submitted. c. Paving will be required on all surfaces which are to be occupied or traveled by vehicles. E) Utility Condition: Permittee is zesponsible for arranging for all necessary utility adjustments or relocation as required for completion of the irr,provement. F) The owner of the property or the authorized representative mustcomplete and sign Spokane County EnginePrs "Agreement to Pay Fees". This document must he returned to the County Engineers Office. Plan review will not be completed until this document is executed. This document is attached to these comments. Please return the completed Agreement to your contact person at the Engineers Department. Only after all the information and requirements listed above are supplied or completed and the necessary review has been accomplished will your building permit be released. Your contact person at the County Engineering Department may be contacted at 456-3600. Your contact person is Robert Turner. Page 1 OFFIGE OF THE COUNTY ENGINEER SPOKANE COUNTY, WASHINGTON Projzct: Storage Building Date 3-18-91 Address: E. 7420 Indiana Parcel No: 12534-1509 Ref No. B91014 The County Engineering Department has completed a review of the above referenced project. The following information must be provided in order for-us to proceed with our review. A) A drainage plan for the site which has been prepared in compliance with Spokane County "Guidelines for Stormwater Management". At a minimum the plan must contain: 1. Drainage calculations for stormwater volumes generated on site. 2. Calculations for total impervious surfaces contained within the site. 3. Finished grade elevations for structures to be constructed on site. 9. Finished grade elevations at the top and bottom of the 208 swale. 5. A typical cross section of the 208 swale. 6. Calculations to justify the number and type of drywells proposed. 7. Elevation of drywell inlets where applicable. B) The subject property is affected by the "Findings and Order" and the "Conditions of Approval" for the following land usE action: 1. Spokane County Zone Change No. ZE-82-84 C) The following improvements within adjacent Right of Way are required prior to the release of a building pezmit: 1. You must submit road and drainage plans for street improvements. These must be prepared by an engineer. P1ans must be prepared for the following streets: a. Park Road: Continue the existing sidewalk and curbing. All zequired construction (sidewalk/curbing/pavement) within the Public Road Right of Way is to be completed prior to the release of a building permit or a financial guaranty in an amount estimated by the County Engineer to cover the cost of construction or improvements shall be filed with the County Engineer. Required plans are to be submi.tted prior to estimati.ng the amount of the financial guaranty or permit release. 'o - . ' . Page 2 2. Approach periiiits rnust be obtai.ned from the County Engineering Department for driveway approaches to the following streets: a. Park Road D) Insufficient information was submitted with the proposal. We are unable to proceed with our review. We will need the following before we can proceed: 1. Site Plan. 2. Drainage plan as specified. 3. Other information: a. Surface water disposal plan if the project is to be phased. b. A parking and traffic circulation plan must be submitted. c. Paving will be required on all surfaces which are to be occupied or traveled by vehicles. E) Utility Condition: Permittee is responsible for arranging for all necessary utility adjustments or relocation as required for completion of the improvement. F) The owner of the property or the authorized representative must complete and sign Spokane County Engineers "Agreement to Pay Fees". This document must be returned to the County Engineers Office. Plan review will not be completed until this document is executed. This document is attached to these comments. Please return the completed Agreement to your contact person at the Engineers Department. Only after all the information and requirements listed above are supplied or completed and the necessary review has been accomplished will your building permit be released. Your contact person at the County Engineering Department may be contacted at 456-3600. Your contact person is Robert Turner. ~ ' • . ~ Page 1 OFFICE OF THE COUNTY ENGINEER SPQKANE COUNTY, WASHINGTON Pro7ect: Storage Building Date 3-18-91 Address: E. 7420 Indiana Parcel No: 12534-1509 Ref No. B91014 The County Engineering Department has completed a review of the above referenced project. The following information must be provided in order for us to proceed with our review. A) A drainage plan for the site which has bEen prepared in compliance with Spokane County "Guidelines for Stormwater Management". At a minimum the plan must contain: 1. Drainage calculations for stormwater volumes generated on site. 2. Calculations for total impervious surfaces contained within the site. 3. Finished grade elevations for structures to be constructed on site. 4. Finished grade elevations at the top and bottom of the 208 swale. 5. A typical cross section o£ the 208 swale. 6. Calculations to justify the number and tyPe of drywells proposed. 7. Elevation of drywell inlets where applicable. B) The subject property is affected by the "Findings and Order" and the "Conditions of Approval" £or the following land use action: 1. Spokane County Zone Change No. ZE-82-89 C) The following improvements within adjacent Right of Way are required prior to the release of a building permit: 1. You must submit road and drainage plans for street improvements. These must be prepared by an engineer. Plans must be prepared for the following streets: a. Park Road: Continue the existing sidewalk and curbing. All required construction (sidewalk/curbing/pavement) within the Public Road Right of Way is to be completed prior to the release of a building permit or a financial guaranty in an amount estimated by the County Enqineez to cover the cost of construction or improvements shall be filed with the County Engineer. Required plans are to be submitted prior to estimating the amount of the financial guaranty or permit release. ~ / , ~ • Page 2 2. Approach permits must he obtained from the County Engineering Department for driveway approaches to the following streets: a. Park Road D) Insufficient information was submitted with the proposal. We are unable to proceed with our review. We will need the following before we can proceed: 1. Site Plan. 2. Drainage plan as specified. 3. Other information: a. Surface water disposal plan if the project is to be phased. b. A parking and traffic circulation plan must be submitted. c. Paving will be required on all surfaces which are to be occupied or traveled by vehicles. E) Utility Condition: Permittee is responsible for arranging for all necessary utility adjustments or relocation as required for completion of the improvement. F) The owner of the property or the authorized representative must complete and sign Spokane County Engineers "Agreement to Pay Fees". This document must }De returned to the Caunty Engineers Office. Plan review will not be completed until this document is executed. This document is attached to these comments. Please return the completed Agreement to your contact person at the Engineers Department. Only after all the information and requirements listed above are supplied or completed and the necessary review has been accomplished will your building permit be released. Your contact person at the County Engineering Department may be contacted at 456-3600. Your contact person is Robert Turner. . S P O K A N E C O U N T Y DEPARTMEh'T OF BUILDiNGS • A DIVISION OE THE PUBLIC WORKS DEPARTMENT JAMES L. MANSON, C.B.O., DIRECTOR DENNIS M. SCOTT, P.E., DIRECTOR MpR 2 21991 ' ~ ; *E:j TO: Allan deLaubenfels, Planning Department Bob Turner, Division of Engineering & Roads Daryl Way, Health District Clyde Wisenor, Fire District No. 1 FROM: Ken Jeffrey, Special P'ects Administrator Division of Buildings DATE: March 19, 1991 RE: March 18, 1991 Pre-Construction Conference North 1909 Park Road Enclosed is your copy of the minutes to the referenced meeting. Should you have any questions or need additional information, please feel free to contact me. KEJ:rmd cc: Mr. Stan Cochran, Spokane Structures Ms. Mabel Caine, Air Pollution Control Authority Mr. Dennis Scott, Public Works Department CODE ENFORCEMENT DIVISION WEST 1303 BROADWAY * SPOKANE, WASHINGTON 99260-0550 ~(509) 456-3675 FA)C (509) 456-4703 . MINIITES PRE-CONSTRIICTION CONFERENCE NORTH 1909 PARR ROAD STORAGE BIIILDING MARCH 18, 1991 CALL TO ORDER: The meeting was called to order at approximately 11:00 a.m. by the Division of Buildings Special Projects Administrator, Ken Jeffrey, with the following in attendance. PERMIT REVIEW PARTICIPANTS: Al1an deLaubenfels, Planning Department Robin Domitrovich, Division of Buildings Ken Jeffrey, Division of Buildings Bob Turner, Division of Engineering & Roads Daryl Way, Health District Clyde Wisenor, Fire District No. 1 APPLICANTB: Stan Cochran, Spokane Structures Inc., N. 502 Mullan Rd, Suite B Spokane, WA 99206 (509) 927-0655 SCOPEIPROJECT DESCRIPTION: I. General Overview - The owner Jim Miller is proposing the construction of a 2,400 square foot storage building. The applicant would like to begin construction as soon as possible. Please Note: The address has been changed from East 7420 Indiana Lane to North 1909 Park Road. SUMMARY OF DEPARTMENTAL REQIIIREMENTS: I. Planning Department (456-2205) A. Discussion/Requirements 1. The proposed is located in a I-2 Zone. 2. The proposed must comply with the conditions of Zone Change No. ZE-82-84. 3. The front yard requires heavy dense landscaping per ZE-82-84. A 20 foot strip of Type I(sight obscuring)- ' landscaping is required along Park Road. , 4. The zone requires a 35 foot front yard setback, please illustrate on the site plan. ~ _ 1 _ . ` _ . 5. The parking as illustrated on the site plan is adequate. A minimum of two spaces are required, three spaces are shown. 6. If the fenced area is for outdoor storage, the fence must be sight obscuring. Please specify on the site plan. r 7. Discussion of a revised site plan illustrating detailed landscaping, setbacks, and a legal access and a practical access to the site were discussed. 8. The plans call for access through the adjacent property to the north. Allan stated this would be ok however, an easement through the adjacent property would be required. Please submit a copy of the easement from the owner. Allan deLaubenfels stated that the easement be filed at the County Auditors Off ice. 9. Allan will verify if access from Park Road is possible as per the condition of the re-zone and get back to the applicant. B. Permit Release Requirements 1. An estimate from a nursery including size, type, and quantity along with a promissory letter from the owner stating the landscaping will be installed shall be submitted. 2. Please submit a revised site plan as described above for review and approval. II. Division of Engineering & Roads (456-3600) A. Discussion/Requirement 1. Comments were given to the applicant and the Division of Buildings by Bob Turner. 2. Please submit a drainage plan for the site that is in conformance with Spokane County Guidelines for Stormwater Management. 3. The proposed will have a metal roof, therefore stormwater drainage from the roof may go directly into a drywell. , 4. The proposed must meet the conditions of Zone Change ` No. ZE-82-84. , . _ 2 . , , , . 5. Please submit road and drainage plans prepared by an engineer for Park Road. Road improvements shall include continuing the existing sidewalk and curb. All required road construction shall be completed prior to the release of the building permit or a bond in an amount estimated by the County Engineer to cover the cost of construction shall be submitted. 6. Approach permits shall be obtained for new driveway approaches along county right of way. 7. Traff ic and circulation plan including the type of vehicles and turning radiuses is required for review. The plan should address the types of truck traffic. 8. Paving is required on all occupied areas and areas traveled by vehicles including the easement extending from Indiana Lane to and including the subject property. 9. Previous requirements for paving of the driveway and area parking which were not completed for Kelly's Frame Shop located on the adjacent property were discussed. Because this was a condition of the zone change, and should access be obtained through said adjacent property, the paving requirements will be required to be completed in conjunction with this current project. Bob voiced his concerns on the previous project's lack of compliance and requested that the Division of Buildings follow up on this matter through continued inspections to verify completion of the improvements. 10. An Agreement to Pay Fees was given to the applicant during the meeting. The agreement is to be signed by the owner and returned to the Division of Engineering & Roads. Plan review will not be completed until this document is executed. B. Permit Release Requirements 1. Please submit a revised drainage plan as described above for review and approval. 2. The proposed shall meet the conditions of Zone Change No. ZE-82-84 which shall include the paving of the easement from Indiana Lane. 3. Please submit road and drainage plans-prepared by an engineer for Park Road. . 4. Please submit a parking and traff ic plan for review. _ 3- G ~ L • , 5. Please submit a copy of the Agreement to Pay Fees signed by the owner. III. Health District (456-6040) A. Discussion/Requirements 1. Daryl Way advised the applicant to aggregate the parcels of land and tie into the existing sewage disposal system instead of installing a new system. If the parcels are not aggregated the existing system may still be tied into, but an easement for the sewer line must be obtained. 2. If the applicant decides to install a new on site sewage disposal system a leach bed will be required instead of a drainf ield because of the property size. The address must be posted on the face of the structure for emergency responses. 3. Please submit a critical materials list to the Division of Buildings for review. 4. Daryl advised the applicant to check with the refuse disposal company regarding the location of the dumpster. B. Permit Release Requirements 1. Apply for a permit to either install a new on site sewage disposal system or for a permit to tie into the existing on site sewage disposal system. IV. Fire District No. 1(928-2462) A. Discussion/Requirements 1. Fire flow for the proposed is 2,000 g.p.m. Fire hydrants located near the site are adequate. 2. The fire district requested that the address be changed from an Indiana Lane address to a Park Road address. 3. If access is provided to the site by an easement the fire district will require that a 50 foot turning radius be provided for maneuvering fire fighting equipment. If . access to the site is provided of f of Park Road the f ire di'strict will have no problems accessing the site. - 4 - . ~ 4. Please submit a parking and traffic circulation plan for review. V. Division of Buildings (456-3675) A. Discussion/Requirements 1. Plan review has been completed on the site plan only and a letter was sent to the applicant by Ken Jeffrey. 2. Please identify what the proposed will be used for, and if proposal is in conjunction with the existing building located on the adjacent property. The Division of Buildings is limiting the use of the proposed to storage only. If use of the structure is to change, a change of use permit would be required. 3. Submit a critical materials list to the Division of Buildings for review and approval. 4. The proposed shall meet the minimum requirements of the Regulations for Barrier Free Facilities. B. Permit Release Requirements 1. Two complete revised sets of plans addressing the items discussed during and after the meeting and other items from the plan review letter needs to be submitted for review and approval. APPLICANT'S COMMENTS/ACRNOWLEDGEMENT: The applicant acknowledged that all comments/requirements were understood and had no further questions at this time regarding permit requirements. CORRECTIONB: To minutes or changes from what appears in the minutes, we should be notif ied within one day of your receipt of these minutes. . To site plans as- required by any or all of the above-listed departments shall be submitted to the Division of Buildings who will then distribute accordingly to those departments. `ADJOIIRNMENT: There being no further business, Ken Jeffrey thanked the applicant and the departments for their participation and reminded all that he should be contacted if there are any unforeseen problems which may arise. : _ 5 . • . ' The meeting was adjourned at approximately 11:55 a.m. Copies of Minutes to: All participants File - North 1909 Park Road Storage Building NOTE TO APPLICANT: Some time ago the County recognized the need to streamline the building permit system and accordingly initiated these Pre-Construction Conferences. Comments so far would indicate these conferences are successful and do enhance the permit system. As a recent participant, we would appreciate any comments you might have to further improve the process or, should you have any questions or concerns regarding your conference, please contact either Jim Manson, Division of Buildings Director, at 456-3675 or Dennis Scott, Public Works Director, at 456-3600. Sincerely, James L. Manson, Director - 6 - L`~ • r; ,I I' f {,(,~i'`~, v ~ I 1 t I I•, i ~ I Y I 1 '13 $ Z w ! ~L..c~ ~ _ ~ . .~`J~ j , `iIi ~e tI Y 2 ! i~ , M. s on) .1 " / ~ O/ • \ ~ ,s ; ~i~ , ; ~J• ' - - ~ ~ ' ` ~ ,.Z ~ ~ ' ~ ~ 3~ ~D 1 % r ~ Z' 1 O -A 40) ,s .JT~ R k ~ 0 ~ 9 „ ~ 3 ~ • ' ~ ~ v ~ 4-4 il g• h ~ I r 'i o ~ • i K ~ i~ ~,t Q 6 r- r• i 1 . Q 9 g Q. ~ ` ' ; , ~ , ~ K ' ~ ~ -`'"f~ ~,1~~N' - ~ ~ - ~a • qA 'r ; ' ~ ~ .r \ 'u,T IA I ~ ` n , / ~ • ENiIRE h1AP IS WIl'HIN 0'CoNNOr~~ . ~ 4~ . s ~ ~ 1 f . J . ~ ~ J y `-t . . ~ E;tcF;r 1', n;~Hsy o~3 ~ 39-(,~ ~ ~ E. ~ . I i . , ~ . "C.. s ~ y ( O S~'; ~roc . - ~ ~ ' ~~I a~ ~ ~ ' Jr 9 'j ~ i►~,,, / _ .:r:~ .....N i` . . ` .i s ✓ Q I-- '~J D I . I`i ' l y,1/_ ) ~ ' > > . 131 ~ ,~~O,f ~~I , , ~ * ~ • ~ M f, . . 41 ~ . • ` File No. ZE-82-84 SPOKANE COUNTY HEARING EXAMINER COMMITTEE FINDINGS AND ORDER A. INTRODUCTION This matter having come bef ore the Zoning Hearing Examine r Committee on September 6, 1984, and the members of the Committee present being Kenneth Kennedy, Chairman, Kathleen M. Carstens and F. Lynn Tennican. B. PROPOSAL The sponsor, Brian T. Butler, is requesting approval of a zone reclassification, File No. ZE-82-84, Residential Office to Restricted Industrial, for the purpose of developing General Industrial Uses (No Site Plan). C. FINDINGS OF FACT l. That the existing land use in the area is residential, commercial, grain storage, railroad tracks, and vacant. 2. That the Comprehensive Plan designates this area as appropriate for Industrial development. 3. That the existing zoning of the property described in the application is Residential Office. ' 4. That the provisions of RCW 43.21C (The State Environmental Policy Act) have been complied with, and the Committee concurs with the Declaration of Non-Significance. 5. That the proper legal requirements for advertisement of the Agenda Item have been fulfilled. 6. That the land in this area, especially along the west side of Park Road, is suitable for the proposed use, or uses within the proposed Zone Classification, but is not necessarily compatible with the adjoining residences east of Park Road. 7. That the applicant has not demonstrated that conditions have substantially changed since the original zoning of Residential Office i n 1973 of thi s area and can only be j usti f i ed wi th si te speci f i c mitigating measures. 8. That the proposed use can be made compatible with existing uses in the area, if adequate buffering techniques are imposed. ~ , ZONE RECLASSIFICATION N0. ZE-82-84 C. FINDI14GS OF FACT (continued) 9. That the owners of adjacent lands expressed strong disapproval of the proposed use. 10. The Hearing Examiner Committee finds the proposed use may be in harmony with the general purpose and will not be otherwise detrimental to the public health, safety, and welfare, if appropriately conditioned. 11. The following are additional findings of fact considered by the Hearing Examiner Committee: a) That this parcel serves as an unique transitional buffer between existing industrial uses west of Park Road and residential areas . to the east of Park Road. The residential area is well established and predates most industrial development in the area; including the several rezone attempts on this site. Testimony f rom the applicant's representative indicated that extensive buffering techniques and mitigating measures could be very expensive in terms of material and loss of developable land. However, the Comprehensive Plan, past land use actions, and public testimony indicated the need to protect the residential area f rom encroaching industrial development. Approval of the zone change f rom Residential Office to Restricted Industrial can only be justifiable if all mitigating measures, as recommended by Staff, are imposed on the property. D. CONDITIONS OR CONTINGENCIES APPLIED TO THIS APPROVAL (Al1 Conditions imposed b, the Zoning Hearing Examiner Committee shall be binding on the "Applicant", which term shall include the owner or owners of the property, heirs, assigns, and successors.) a) COUNTY PLANNING DEPARTMENT l. Approval by the Zoning Administrator of a specific lighting and signing plan for the described property prior to the release of any building permits. . 2. A specific landscape plan, planting schedule and provisions for maintenance acceptable to the Spokane County Zoning Administrator shall be submitted with a performance bond for the project prior to release of building permits. Landscaping shall be installed and maintained such that sight distance at access points is not obscured or impaired. 2 Y , ZONE RECLASSIFICATION N0. ZE-82-84 a) COUNTY PLANNING DEPARTMENT (continued) 3. Direct light f rom any exterior area lighting fixture shall not extend over the property boundary. 4. The specific development plan will be submitted for Planning Department review and approval prior to issuance of building permi ts. 5. A11 current standards of the Restricted Industrial Zone, as amended, shall be complied with in the development of this site. 6. That the project is subject to Section 4.16A.050, the Aquifer . Sensitive Area Overlay Zone of the Spokane County Zoning Ordinance, which sets forth various measures for Aquifer protection; specifically, measures dealing with wastewater disposal, spill protection measures, and stormwater runoff. - 7. That the present proposal is not detailed enough to determine whether or not the use of or materials stored on the site are in compliance with Chapter 4.16A (Aquifer Sensitive Area Overlay Zone) of the Spokane County Zoning Ordinance. Accordingly, as a condition of approval, the sponsor/applicant shall be required to file with the Spokane County Auditor, within thirty (30) days of the signing of Findings and Order of the final decision in this matter, a"Notice to the Public" which shall provide in mate ri al as f ol 1 ows : PRIOR TO THE ISSUANCE OF ANY BUILDING PERMIT OR CERTIFICATE OF OCCUPANCY FOR ANY BUILUING OR ANY USE ON THE PROPERTY DESCRIBED NEREINAFTER, THE APPLICANT SHALL BE RESPONSIBLE FOR COMPLYING WITH THE PROVISIONS OF SPOKANE COUNTY ZONING ORDINANCE CHAPTER 4.16A (AQUIFER SENSITIVE AREA OVERLAY ZONE). THE PROPERTY WHICH IS THE SUBJECT OF THIS NOTICE IS h10RE PARTICULARLY UESCRIBED AS FOLLOWS:....". 8. Applicant shall comply with '208' recommendations concerning stormwater runoff and provide necessary landscaping for runoff. 9. Any division of land for the purpose of sale, lease or transfe r, shall comply with RCW 58-17 and the Spokane County Platting Ordinances prior to issuance of building permits. 3 ZONE RECLASSIFICATION N0. ZE-82-84 a) COUNTY PLANNING DEPARTMENT (continued) 10. That the provisions of SEPA's NOTICE OF ACTION pursuant to Chapter 43.21C.080 RCW and the Board of Spokane County Commissioners Resolution #77-1392 be initiated by the project applicant within thirty (30) days of final disposition of this application, and prior to any on-site improvements, or file appropriate documents to the effect that the NOTICE OF ACTIOPJ is . waived in accordance with Spokane County Commissioners' Resol uti on #82-0458 dated h1ay 4, 1982. 11. Pursuant to the provisions of Chapter 43.21C RCW, the SEPA Guidelines (WAC 197-10) and the Spokane County Environmental Ordinance (SCEO), a proposed declaration of non-significance has been issued at least fifteen (15) days prior to this date; the official file, written comments and/or public testimony contain information regarding assessment of the proposal's likely significant adverse impacts to the physical environment; a finding is hereby made that no probable significant adverse impacts upon the physical environ ment are anticipated as a resul t of the proj ect; and a f i nal decl arati on of non-significance is hereby to be issued. 12. That all areas within the f ront yard setback off Park Road be planted and maintained in dense landscaping, except access point, as approved by the Zoning Administrator. 13. That no parking, storage, or loading dock be allowed on the Park Road (eastern) portion of the site. Also, that all traffic and activity be oriented to the weste rn portions of the site. 14. That only one access point be allowed from the site to Park Road, to be as approved by the Zoning Administrator and the County Engineer. b) COUNTY ENGINEERING DEPARTMENT Prior To The Issuance Of A Building Permit: 1. sAxr,ess vermi ts for approaches to the County Road System shal 1 be obtai ned f rom t-Fie Spokane County Engi neer. 2. Other specific improvements: Applicant shall cons+rw Portland Cement concrete sidewalk along Park koad per Spokane County standards. 4 ti ZONE RECLASSIFICATION N0. ZE-82-84 b) COUNTY ENGINEERING DEPARTh1ENT (continued) 3. Applicant shall submit for approval by the Spokane County Enginee r road, drainaqe, and access plans prior to the issuance of a building permit on the property. 4. The applicant shall submit for approval by the Spokane County Engineer and the Spokane County Health District a detailed combined on-site sewage system plan and surface water disposal plan for the entire project prior to the issuance of any -trrrifidi n g pe rm i t-an-th e p rope rty . , 5. A parking plan and traffic circulation plan shall be submitted a-n pproved by the SpoKane (:ountyEng'rnee-r--)-ri or to the i ssuance of a bui 1 di ng permi t on the property. The desi gn, location, and arrangement of parking stalls shall be in accordance with standard traffic engineering practices. Pkving or surfaci ng as _approved by.the_County Engi neer, wi 11 be _ ~ re ya.rr-e,d-for any porti_on of the ,project.-which-Tis-to-=be--acc.u.pied ve 1 e d" byr=ve h-i-c 1-e s e " - - - - - _ _ 6. The word "applicant" shall include the owner or owners of the ~ property, his heirs, assigns, and successors. 7. The construction of the road improvements stated herein shall be accomplished as approved by the Spokane County Engineer. 8. Al1 required improvements shall conform to the current State of Washington Standard Specifications for Road and Bridge Construction, and other applicable County standards and/or adopted resolutions pertaining to Road Standards and Stormwater Management in effect at the date of construction, unless otherwise approved by the County Engineer. 9. Roadway standards, typical roadway sections and draina9e Plan I requirements are found in Spokane Board of County Commissioners' Resolution No. 80-1592 as amended. 5 2ONE RECLASSIFICATION NO. ZE-82-84 c} COUNTY UTILITIES DEPARTMENT 1. The awner(s) or Successor(s) in interest agree to authorize the County_ to place their name(s) on apeti ti on for the formation af ~ULID by Retition rnethod pur°suant ta RCW 36.94 which the petitian i ncludes tIne Owner(s) propert,y and further nvt to object by the signing of a pratest peti tion agai nst the farmatian af a ULID by resoluti on method pursuant ta RCW Chapter 36.94 whi ch i ncludes the Owner(s) property. PRO1f IDLD, thi s condi tz orr sha7 l nvt prohi bi t the Dwner(s) or Successor(s) from object7nn ta any assessment(s) on the property as a result of irnpravements cal 1 ed for i n canj uncti on with the formati on vf a ULID b,y either peti ti an or resa7 utian method under RCW Chapter 36,94. . 2. Any water service for this prvj ect shal l be provided in accordance wi th the Coordi nated Water Systern Pl an for Spokane County, as amended. 3. Each unit shal i be doubl e-plurnbed for connectian tv future areawi de col1ecti an systems. 4. Thi s acti an be condi tioned with the performance criteri a af Sectian 4.16A,450* for all future uses. * Aquifer Sens7 tive Area Overla,y Zone. d} COUNTY HEALTN DISTRICT i. A combi ned surface water and sewage di sposal detai led plan shai 1 be approved b,y the Caunt,y Engineer and the Heal th Distr7ct prior tn the issuance of any buY ldi ng permi t for thi s praject. 2. Sewage di sposal method sha7 l be as authorized hy the ai rector of Utilities, Spokane County. 3. Subj ect to speci fi c appl i catian appraval and issuance of permi ts by the Health Offi cer, the use of an i ndi vidual on-sz te sewage sy5tem rrldy be duthor1 Zed. 4. Water service shall be coordinated through the Director of k1 Li1it1es, Sp1Ikane l.+oUll Iry■ 6 ZONE RECLASSIFICATION N0. ZE-82-84 d) COUNTY HEALTH DISTRICT (continued) 5. Water service shall be by an existing public water supply when approved by the Regional Engineer (Spokane), State Department of Social and Health Services. 6. Use of private wells and water systems is prohibited. 7. Disposal of sewage effluent beneath paved surfaces is currently prohibited. e) COUNTY BUILDING AND SAFETY DEPARTMENT l. The site is located in Fire Uistrict # 1. 2. Fi re hydrants which meet the fi re fl ow are requi red to be installed prior to construction. These hydrants shall be placed so that no portion of the building exterior is more than 175 feet from the hydrant. The bottom of the 1 owest outl et of the hydrant shall be no less than 18 inches above grade. A water plan showing each fire hydrant (specifying the gallons per minute for each fire hydrant) and meeting the requirements in Chapter 10.04 of the Uni form Fi re Code i s requi red pri or to construction of the water service. 3. Approved numbers or addresses shall be placed on all new and existing buildings in such a position as to be plainly visible and legible f rom the street or road fronting the property. Said numbers shall contrast with their background. 4. Trash enclosures shall not be located adjacent to combustible construction or underneath windows or nonprotected eaves. f ) WATER PURYEYOR l. Water Purveyor is Spokane Suburban Water Company, and they will supply the site with adequate water for domestic, fire and irrigation uses. 7 ZONE RECLASSIFICATION N0. ZE-II2-84 g) COUNTY AIR POLLUTION CONTROL AUTHORITY 1. Air pollution regulations require that dust emissions during demolition, excavation and construction projects be controlled. This may require use of water sprays, tarps, sprinklers, or suspension of activity during certain weather conditions. Haul roads should be treated and emissions from the transfer of earthen material must be controlled as well as emissions f rom all other construction related activities. 2. Measures must be taken to avoid the deposition of dirt and mud from unpaved surfaces onto paved surfaces. If tracking or spills occur on paved surfaces, measures must be taken immediately to clean these surfaces. . 3. Al1 travelled surfaces (ingress, egress, parking areas, access roads) must be paved and kept clean. 4. Some objectionable odors will likely result during the construction phase of a project and from motor vehicles using the site following completion of the project and f rom occupants of the proposed project. 5. SCAPCA Regulation I, Article IV requires registration with this Agency. 6. SCAPCA Regulation I, Article V requires that a Notice of Construction and Application for Approval be submitted to and approved by our Agency prior to the construction, installation or establishment of an air pollution source. 7. SCAPCA Regulation I, Article VT and SCAPCA Regulation II, Article IV addresses emission standards. Al1 emission standards must be met. 8. All air pollution regulations must be met. ORDER The Hearing Examiner Committee, pursuant to the aforementioned, finds that the application of Brian T. Qutler for a zone reclassification as desc ribed in the application should be APPROVED. P9otion by: Tennican Seconded by: Carstens Vote: Tennican - Aye Carstens - Aye Kennedy - Aye Unanimous to APPROVE to the RESTRICTED INDUSTRIAL ZONE - ( 3 - 0 ) 8 ► ZONE RECLASSIFICATION N0, ZE-82-84 E. ORDER (continued) ' HEARING EXAMINEk COMNiITTEE HEREBY ATTEST TO THE ABOYE FINDINGS, ORDER, AND VOTE ~ rc~J Chai rman / . . ~ / /{/d . • % / ' % ~ i /~r / ATTE ST : For WALLIS D. HUBBARD Planning Director ~ By S'f'IE Frgg OB 0/ SK I Zoning Administrator D a te : 9 . - x : . x• , BEFORE THE SPOKANE COUNTY SNORT PLAT ADMINISTRATOR ; ~ IN THE MATTER OF ) FINDINGS OF FACT SNORT PLAT N0. SP-85-394 ) CONCLUSION AND DECISION THIS MATTER, an appl ication from Bri an T. Butl er for the approval of a Short Plat, pursuant to Spokane County Resolution No. 78-291, came before the Spokane County Short Plat Admi ni strator on the 23rd day of July, 19850 Having reviewed the records and files in this matter, the Spokane County Short Pl at Admi ni strator makes the fol 1 owi n9: • F INDI NGS OF FACT AND CONCLUSI ON I. That the Spokane County Comprehensive Plan indicates this site to be ~ wi thi n the Industrial Category and withi n the Pri ori ty Sewer Service Area. ~ . II, ; That the uses and lot sizes proposed by the plat sponsor appear to be consi stent wi th the Industri al Category of the Comprehensi ve P1 an. III. That the existing zoning for this site is Restricted Industrial and Aqui fer Sensi ti ve Area Overl ay Zone. IV. , That when the zoning for this,site was changed from Residential Office to Restri cted Industri al ( ZE -82-84 ) i n September of 1984, certai n condi ti ons were placed upon any development of this land. ~ ~ Y. ' That proper legal notification was given for this proposal. ~ That the owners of ad,jacent lands expressed neither approval nor ' di sapproval of thi s proposed use. ; YII. That appropriate provisions have been made for sewage disposal, water ~ supply, storm water control, ci rcul ati on, fi re protecti on and other necessary ; publ i c faci 1 i ti es and uti 1 i ti es. . YIII. That the proposed use is not detrimental to the general purpose or , otherwise harmful to the public health, safety and welfa re. ' IX. That no significant adverse environmental impact will likely result from ' approval of thi s proposal. ; n THEREFORE, the Spokane County Short Administrator hereby issues this ' DECISION Short Plat application SP-85-394 is hereby APPROYED subject to conditions which shall be complied with by the applicant and/or sponsor prior to , finalization of the short plat. Da ed thi s 2>0L da of _ U`~" 1985. t Y ~ .N J ~ ~ ~ uli; ~4NTY SRW PLAT ADMINISTIU= : 1 i . FYNDI HGS OF FACT, CONCL USION AND DECISION (cvnt' d) 5P-85-394 -1 , ; CON0ITI0N5 OF APPROYAL FDR SHORT PLAT #5P-85-394 PLANhlING - - ~ 1. That the preliminary pl aL ae ga ven conda tional apprvval ta ~ ~ August 1, 1988. The Short P1 at Admini strator ma}r administrati vely N approve a request for a one ,year extension of time If the sponsar subrnits i a written request fort,y-five (45) days prior to the above expiratian J date. A request for an Extensi on of Time may subject the propasal to new 5 conditions required b,y revi ewing agenci e s. ~ T 2. Tinat thg plat,be des#gned as indicated an the pre]irninary plat of record : and/ar attached s~heets as noted. ~ . ; 3. That a statement be placed in the dedi cation ta the effect that no more i than one al1 owable use as determined by the 5pokane Caurtt,y Ioni ng ; Admini strator be placed on any one lot, nor shal1 any lvt be further subdi vi ded for the purposes of creata ng addi ti onal i ats or bui1 ding si tes without filing a replat. 4. T+`at appi VpJ #aLre s41 44 t liames Ue indicLL4r1:Lfr - 5. That appropri ate uti 1 i t,y easements be i nd3cated on capies of the approved , prel imi na ry plat for di stri huti on to the P1 anning Departxnent arad the uti ]ity cornpanies. Wri tten approval of the easements by the uti 1 ity compary must be received pri or to the submi tt~l of the fi nal p1 at. 6. That a eertificarte of ti tle be fur~ni shed the Planning Departrnent pri or to the fi1ing of the fi nal pl,at. 7. That asurvey be requi red pri or to the fi lj ng of a final plat. 8. The condity ons of ZE-82-84 shai 1 be compi ied wi th i ncvnj unctian wi th any develapment of thi s site. GOUNTY ENGTNEER DEPARTMENT 1. Tha,t condi tianal appravai of the plat by the County Engi neer is gi ven subj eet approval of the road system as i ndi cated In the preli rninary p] at ; of record, 2. A StdtE'ment mlJst appe8r 1 ~ the dedi GdtOry ldngklage of the plat that inciividual dri vewa,y access permi ts be requi red pri or to issuance of a : bui1 ding pemit for drivewa,y approaches to the Caunty Road system. 3. The word uappli cant" shai l i nc]ude the owner or owners of the property, hi s he1 rs, assi gns, arrd successor~s. : 4. That pri vate road(s) be irnproved to Spokane Cvunty stan+dard for a pri vate raad Urban-Subur°ban standard servi ng faur lots. Subject to appraval under~ sectivn 10.207 of the Sppkane County F# re Cade. 5. That the following statement be placed in the pl at dedicati an: WARNING* Spakane County has no responsibility to build, imprave, maintairr, ar other+ri se servi ce the private roads cantained wi thi n or prvviding servi ce ' tv the property described in this piart. B,y accepting this plat vr subsequently by a11 owi ng a bui 1 di ng perrnit to be issued on propert,y an a private r~oad, Spokane Cvunty assumes nv obl i gation fvr sai dpri vate road and the owners hereby acknowl edge that the Count,y has nv ob1 igati vn of any ki nd or nature whatsoever to establish, exammi rre, surve,y, evnstruct, al ter, repai r, timprove, maintain, provi de drainage vr snaw rernoval on a pri vate road. Thi s requirernent i sand shai l run wi th the 1 and and sha17 be bi ndi ng upon the owner, their hea r~s, successors or assigns i ncluda ng the obligation to part3 cipate i n the maintenance of the pri vate road as prvvi Ided herei n: . . . . , , 2 ~ ` • G • 5 . • s• FINDINGS OF FACT, CONCLUSION AND DECISION (cont'd) SP-85-394 COUNTY ENGINEER DEPARTMENT (cont'd) 6. The proposed plat shall be improved to the standards set forth in Spokane County Boa rd of Comnissioners Resolution No. 80-1592, as amended, which establishes regulations for roads, approaches, drainage, and fees in new ' construction. 7. That pri or to the rel ease of bui 1 di ng permi ts for any of the parcel s within the proposed plat, the applicant must comply with the Conditions of Approal which were specified for Zone Change ZE-82-84. 8. That the applicant will be required to construct concrete curb and sidewalk along the frontage of Parcel "A" prior to the release of a bui 1 di ng permi t. Concrete si dewal k wi 11 al so be requi red for Parcel s uBu, °Cu & uDu prior to release of building permits for those parcels. 9. Access to tracts wi thi n thi s proposal shal 1 be by the pri vate road as shown. The plat dedication shall state Direct access from Park Road to any tract wi thin thi s short pl at i s prohi bi ted. COUNTY HEALTH DI STRICT 1. A combined surface water and sewage disposal detailed plan shall be approved by the County Engineer and the Spokane County Health District pri or to the i ssuance of any bui 1 di ng permi t for thi s project. 2. The dedicatory language of the plat will state that: "Subject to specific application approval and issuance of permits by the Health Officer, the use of individual on-site sewage systems may be authorizedu. 3. Water service shall be by an existing public water supply when approved - by the Regional Engineer (Spokane), State Department of Social & Health Se rvices. , 4. Pri or to fi 1 i ng the 'fi nal pl at, the sponsor shal 1 present evi d°ence that the plat 1 ies wi thi n the recorded service area of the water system proposed to serve the plat. The dedicatory language on the plat shall state: "Use of pri vate wel 1 s and water systems i s prohi bi ted, u 5. The plat dedication will contain a statment to the effect that: uThe public water system as approved by County and State health authorities and the local fire district and purveyor will be installed within this pl at, and the subdi vi der wi 11 provi de for i ndi vi dual domestic water service as well as fire protection to each lot prior to sale of each lot." 6. Disposal of sewage effluent beneath paved surfaces is currently prohibited. 7. P rior to filing the final plat, the sponsor shall demonstrate to the satisfaction of the Spokane County Health Oistrict that suitable sites for on-site sewage disposal systems are available on all lots. COUNTY UTILITIES DEPART14ENT l. The owner(s) or Successor(s) in interest agree to authorize the County to pl ace thei r name(s) on a peti ti on for the formati on of a ULID by peti ti on method pursuant to RCW 36.94 whi ch the peti ti on incl udes the Owner(s) property and further not to object by the si gni ng of a protest peti ti on . against the formation of a ULID by resolution method pursuant to RCW Chapter 36.94 whi ch i ncl udes the Owner(s) property. PROVIDED, thi s condi ti on shal l not prohi bi t the Owner(s) or Successor(s) from obj ecti on to any assessment(s) on the property as a resul t of improvements cal 1 ed for i n conj uncti on wi th the formati on of a ULID by ei ther peti ti on or resolution methodunder RCW Chapter 36.94. 2. Any water servi ce for thi s project shal 1 be provi ded i n accordance wi th the Coordi nated Water System Pl an for Spokane County, as amended. 3 • ' X . • FINDINGS OF FACT, CONCLUSION ANO DECISION (cont'd) SP-85-394 COUNTY UTILITIES DEPARTMENT (cont`d) 3. Each uni t shal 1 be doubl e pl umbed for connecti on to future areawi de col 1 ecti on systems. 4, thi s acti on shal 1 be condi ti oned wi th the perf ormance cri teri a of Secti on 4.16A.050 Aqui fer Sensi ti ve Area Overl ay Zone for al 1 fu'ture uses. B UI L DI NG b SAFETY DEPARTMENT 1. Those conditions as attached in ZE-82-84. APPROVED TNIS ISA DAY OF 1985. . 4, ADMI hTIS CRA~R SPO E COUtII S R T-P cc: Heal th Oi strict Engineer Utilities Building & Safety Applicant Surveyor File 4