Loading...
2012, 11-01 Permit App: APR-2012-0070 Approach :., Community Development Department (Staff Use Only) Permit Center guyOF " - 11703 East Sprague Avenue, Suite B 3Spokane Valley, WA 99206 PERMIT NUMBER: 7v okane ••-7_ Tel: (509) 688-0036 PERMIT FEE: ' c//C/ Valley Fax: (509) 688-0037 permitcentert spokanevaIley.orq APPROACH PERMIT APPLICATION PROJECT ADDRESS: 10 e2_ I e, Z c f A U START DATE: ANTICIPATED COMPLETION DATE: BUILDING OWNER NAME: ALS ( E 1-11 vh f} N MAILING ADDRESS: 5.4416- • .4416 a CITY: <Qe � UAf1c y STATE: t k ZIP: !et2 b CONTACT PERSON NAME: t PHONE: FAX: CELL: CONTRACTOR NAME: MAILING ADDRESS: a�CDS .cp. ✓/7 t / I la__ CITY: figitl le STATE: �,l/t`).51{ ZIP: q fog/ / li G PHONE: 6-0(1—2c/5' 3S>2- FAX: .54rnG CELL: SJe:LZ7(.9 —/z6 ( CONTRACTOR LICENSE No.: EXPIRES: CITY BUSINESS LICENSE NO.: PROJECT DESCRIPTION (Please Provide Site Sketch) Residential Driveway D Commercial/Industrial Driveway Existing Curb &Gutter 0 Rural Road Section Culvert Installation 0 Sidewalk Repair/Construction 0 Other Conditions: Bond/Insurance certification must be on file with the City. DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling,the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be equired to be submitted and subsequently approved before this application can be processed. /-//USignature Date: //-/-1/2-- Updated pdated 1-11-11 Page 1 of 1 http://www.spoka neva I ley.org/filestorage/124/938/210/948/1496/Approach_Permit_1-11-11.doc APPROACH PERMIT APPLICATION REQUIRED SKETCH INFORMATION (Revised 1/25/10) Provide required measurements (in sketch boxes), and include street name. Check all existing conditions that apply: ❑ Sidewalk ❑ Drainage Ditch ft wide 0 Drywell (show location on sketch) ft from back of curb 0 Other (please describe below) ❑ Streetside Swale Lu DISTANCE FROM Z l NEAREST PROPERTY LINE MAY BE LEFT OR RIGHT SIDE) FT(SEE TABLE) Lu! ao, c a APPROACH CONCRETE CUR RETUBRN N G' THROB EETABLE FT NG 'N CURB IF CORNER LOT, DISTANCE FROM STREET NAME / 5 �� IJ� CUR: RETURN rem FT(SEE TABLE) STREET WITH CURB WI DISTANCE FROM z - - NEAREST PROPERTY LINE 10±12. BE LEFT OR RIGHT SIDE) FT(SEE TABLE) �i 15'RADIUS ASPHALT RADIUS cc a.1 APPROACH RETURN THRO( IHFT / - - EDGE OF-/F SEE TABLE) NIFCORNER LOT, ASPHALT DISTANCE FROM STREET NAME RADIUS RETURN Q FT(SEE TABLE) STREET WITH ASPHALT EDGE Approach Requirements: • Maximum 2 approaches per property frontage; one on arterials. • Total width of approaches not to exceed 50% of frontage width. Residential Approaches Commercial Approaches Distance from Curb/Radius Return 15'minimum 75'minimum Separation between Approaches (measured See Page 7-27 from centerline to centerline of each None specified in City Street Standards approach) Throat Width (flat portion) 16'min., 30'max. 30'min.,40'max. Wing Width (at curb line) 4 feet typical 4 feet typical Minimum Distance from Side Property Line (@ r/w) 5.0' 5.0' Minimum Distance from Crosswalk 5' 5' crnv or I"" Development Engineering Spokane Valley 11707 E Sprague Ave Suite 106 ♦ Spokane Valley WA 99206 509.921.1000♦ Fax: 509.921.1008♦cityhall@spokanevaltey.org Approach Permit Application Review TO: Building Department Site Address: 10821 E. 21St Ave. Project No: APR-2012-0070 Accepted Not Accepted Approach X Building Location Paved Access Notes: Saw cutting of existing curb to create an approach is not allowed within the City's jurisdiction. Approach is to be inspected by the City's ROW Inspector prior to concrete placement. Approach to be constructed per City's Standard Plan R-112. Reviewed By: ti ,-,..;410.0-416-u- Date: ///D z// - • APPROACH PERMIT APPLICATION REQUIRED SKETCH INFORMATION (Revised 1/25/10) Provide required measurements(in sketch boxes),and Include street name. Check all existing conditions that apply: ❑ Sidewalk 0 Drainage Ditch _ft wide 0 Drywell (show location on sketch) _ft from back of curb 0 Other (please describe below) ❑ Streetside Swale I DISTANCE FROM - NEAREST PROPERTY UNE 1 MBE LEFT OR RIGHT'SIDE) ]FT(SEE TABLE) a / \ of CONCRETE CURB APPROACH RETURN CURB./ I--4' THROAT WIDTH 111 FT4'-4 —�-� WINO (SEE TAB - WINO IF CORNER LOT, � DISTANCE FROM STREETNAMEI 2 / 5--, fl Uf I r_ .t:RETURN Ka FT(SEE TABLE) STREET WITH CURB DISTANCE FROM V. NEAREST PROPERTY UNE AY BTE(SEE LEFT TABOR RIGLE)HT SIDE) F ASPHALT 16 RADIUS1.7) RADIUS RETURN '-'-'THIOATWIDTH FT— EDOEOF ASPHALT (SEE TABU IF CORNER LOT, DISTANCE FROM STREET NAME! RADIUS RETURN Q FT(SEE TABLE) STREET WITH ASPHALT EDGE Approach Requirements: • Maximum 2 approaches per property frontage;one on arterials. • Total width of approaches not to exceed 50%of frontage width. Residential Approaches Commercial Approaches Distance from Curb/Radius Return 15'minimum 75'minimum Separation between Approaches(measured See Page 7-27 from centerline to centerline of each None specified in City Street Standards approach) Throat Width(flat portion) 16'min.,30'max. 30'min.,40'max. Wing Width(at curb line) 4 feet typical 4 feet typical Minimum Distance from Side Property Line (6 r/w) 5.0' 5.0' Minimum Distance from Crosswalk 5' S' c.., 'I.2 771 •-d..i.,)7 3/r- (Z" '2 I r DI -,----..--,„... .?7ty •(,,.. , -2,74/72'-) prtY9-) °P / 6 f h ) gyfis:, i ci, 1 ,,,,.., , ,y 4,6-'6 ):--N----.... ')11, , ___...... _ . – v74-ti/re/ Z , ! . k — i _7;8 2 _ --2,, t, cl /r\ . ..,) / -_, — --- I / 777 i ) . 7 \ . i \ 3 r)7)i) J_______