2012, 11-01 Permit App: APR-2012-0070 Approach :., Community Development Department (Staff Use Only)
Permit Center
guyOF " - 11703 East Sprague Avenue, Suite B 3Spokane Valley, WA 99206 PERMIT NUMBER: 7v
okane ••-7_
Tel: (509) 688-0036 PERMIT FEE: ' c//C/
Valley Fax: (509) 688-0037
permitcentert spokanevaIley.orq
APPROACH PERMIT APPLICATION
PROJECT ADDRESS:
10 e2_ I e, Z c f A U
START DATE: ANTICIPATED COMPLETION DATE:
BUILDING OWNER NAME: ALS ( E 1-11 vh f} N
MAILING ADDRESS: 5.4416-
•
.4416 a
CITY: <Qe � UAf1c y STATE: t k ZIP: !et2 b
CONTACT PERSON NAME: t
PHONE: FAX: CELL:
CONTRACTOR NAME:
MAILING ADDRESS: a�CDS .cp.
✓/7 t / I la__
CITY: figitl
le STATE: �,l/t`).51{ ZIP: q fog/ /
li G
PHONE: 6-0(1—2c/5' 3S>2- FAX: .54rnG CELL: SJe:LZ7(.9 —/z6 (
CONTRACTOR LICENSE No.: EXPIRES: CITY BUSINESS LICENSE NO.:
PROJECT DESCRIPTION (Please Provide Site Sketch)
Residential Driveway D Commercial/Industrial Driveway
Existing Curb &Gutter 0 Rural Road Section
Culvert Installation 0 Sidewalk Repair/Construction
0 Other Conditions:
Bond/Insurance certification must be on file with the City.
DISCLAIMER
The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling,the dwelling is/will
be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property
owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional
information may be equired to be submitted and subsequently approved before this application can be processed.
/-//USignature Date: //-/-1/2--
Updated
pdated 1-11-11 Page 1 of 1
http://www.spoka neva I ley.org/filestorage/124/938/210/948/1496/Approach_Permit_1-11-11.doc
APPROACH PERMIT APPLICATION
REQUIRED SKETCH INFORMATION (Revised 1/25/10)
Provide required measurements (in sketch boxes), and include street name.
Check all existing conditions that apply:
❑ Sidewalk ❑ Drainage Ditch
ft wide 0 Drywell (show location on sketch)
ft from back of curb 0 Other (please describe below)
❑ Streetside Swale
Lu DISTANCE FROM
Z l NEAREST PROPERTY LINE
MAY BE LEFT OR RIGHT SIDE)
FT(SEE TABLE)
Lu!
ao,
c
a APPROACH CONCRETE
CUR
RETUBRN
N
G' THROB EETABLE FT NG 'N
CURB IF CORNER LOT,
DISTANCE FROM
STREET NAME / 5 �� IJ� CUR: RETURN
rem FT(SEE TABLE)
STREET WITH CURB
WI
DISTANCE FROM
z - - NEAREST PROPERTY LINE
10±12. BE LEFT OR RIGHT SIDE)
FT(SEE TABLE)
�i 15'RADIUS
ASPHALT RADIUS
cc
a.1 APPROACH RETURN
THRO( IHFT
/ - -
EDGE OF-/F
SEE TABLE)
NIFCORNER LOT,
ASPHALT
DISTANCE FROM
STREET NAME RADIUS RETURN
Q FT(SEE TABLE)
STREET WITH ASPHALT EDGE
Approach Requirements:
• Maximum 2 approaches per property frontage; one on arterials.
• Total width of approaches not to exceed 50% of frontage width.
Residential Approaches Commercial Approaches
Distance from Curb/Radius Return
15'minimum 75'minimum
Separation between Approaches (measured See Page 7-27
from centerline to centerline of each None specified in City Street Standards
approach)
Throat Width (flat portion) 16'min., 30'max. 30'min.,40'max.
Wing Width (at curb line) 4 feet typical 4 feet typical
Minimum Distance from Side Property Line
(@ r/w) 5.0' 5.0'
Minimum Distance from Crosswalk 5' 5'
crnv or I"" Development Engineering
Spokane
Valley
11707 E Sprague Ave Suite 106 ♦ Spokane Valley WA 99206
509.921.1000♦ Fax: 509.921.1008♦cityhall@spokanevaltey.org
Approach Permit Application Review
TO: Building Department
Site Address: 10821 E. 21St Ave.
Project No: APR-2012-0070
Accepted Not Accepted
Approach X
Building Location
Paved Access
Notes: Saw cutting of existing curb to create an approach is not allowed
within the City's jurisdiction. Approach is to be inspected by the City's
ROW Inspector prior to concrete placement.
Approach to be constructed per City's Standard Plan R-112.
Reviewed By: ti ,-,..;410.0-416-u- Date: ///D z// -
•
APPROACH PERMIT APPLICATION
REQUIRED SKETCH INFORMATION (Revised 1/25/10)
Provide required measurements(in sketch boxes),and Include street name.
Check all existing conditions that apply:
❑ Sidewalk 0 Drainage Ditch
_ft wide 0 Drywell (show location on sketch)
_ft from back of curb 0 Other (please describe below)
❑ Streetside Swale
I DISTANCE FROM
- NEAREST PROPERTY UNE
1 MBE LEFT OR RIGHT'SIDE)
]FT(SEE TABLE)
a
/ \
of CONCRETE CURB
APPROACH RETURN
CURB./ I--4' THROAT WIDTH 111 FT4'-4
—�-�
WINO (SEE TAB - WINO IF CORNER LOT,
� DISTANCE FROM
STREETNAMEI 2 / 5--, fl Uf I r_ .t:RETURN
Ka FT(SEE TABLE)
STREET WITH CURB
DISTANCE FROM
V. NEAREST PROPERTY UNE
AY BTE(SEE LEFT TABOR RIGLE)HT SIDE)
F
ASPHALT 16 RADIUS1.7)
RADIUS RETURN
'-'-'THIOATWIDTH FT—
EDOEOF
ASPHALT (SEE TABU IF CORNER LOT,
DISTANCE FROM
STREET NAME! RADIUS RETURN
Q FT(SEE TABLE)
STREET WITH ASPHALT EDGE
Approach Requirements:
• Maximum 2 approaches per property frontage;one on arterials.
• Total width of approaches not to exceed 50%of frontage width.
Residential Approaches Commercial Approaches
Distance from Curb/Radius Return
15'minimum 75'minimum
Separation between Approaches(measured See Page 7-27
from centerline to centerline of each None specified in City Street Standards
approach)
Throat Width(flat portion) 16'min.,30'max. 30'min.,40'max.
Wing Width(at curb line) 4 feet typical 4 feet typical
Minimum Distance from Side Property Line
(6 r/w) 5.0' 5.0'
Minimum Distance from Crosswalk 5' S'
c.., 'I.2 771
•-d..i.,)7 3/r- (Z" '2 I r DI
-,----..--,„... .?7ty •(,,.. , -2,74/72'-)
prtY9-) °P
/ 6
f h )
gyfis:,
i
ci, 1 ,,,,.., , ,y 4,6-'6
):--N----....
')11,
,
___...... _ .
– v74-ti/re/ Z
,
! .
k
— i
_7;8 2
_
--2,,
t,
cl
/r\
. ..,)
/
-_,
—
--- I / 777
i
)
. 7
\ . i
\ 3 r)7)i)
J_______