Loading...
2011, 04-29 Permit App: 11001104 Mold RepairProject Number: 11001104 Inv: I Application Date: 4/29/2011 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Proiect Information: 0 $80,000.00 Units Unit Desc Permit Use: MOLD REPAIR - REPLACE DRYWALL & Contact: BELFOR CONSTRUCTION INSULATION Address: 10020 E. KNOX, SUITE 100 1 C - S - Z: SPOKANE, WA 99206 Setbacks: Front Left: Right: Rear: Phone: (509) 893-0001 Group Name: Site Information: Project Name: Plat Key: 001222 Name: HILLCREST ACRES 01ST ADD District: Sout Parcel Number: 45272.2353 Block: Lot: SiteAddress: 12519 E 21ST AVE Owner: Name: KANE, DENNIS J / COLVIN -KANE Address: 12519 E 21ST AVE Location:: CSV SPOKANE, WA 99216-2538 Zoning: R-2 SF Res Suburban District Water District: 101 SPO CO WATER DIST#3B Hold: ❑ Area: 11,250 Sq Ft Width: 0 Depth: 0 Right Of Way (ft): 0 Nbr of Bldgs: 1 Nbr of Dwellings: 1 Review Information: Review Building Plan Review Released B Originally Released: 4/28/2011 By: tmelbourn Permits: - -- - _ -- Building Permit — - Contractor: BELFOR USA GROUP Firm: BELFOR CONSTRUCTION Address: 10020 E. KNOX SUITE 100 Phone: (509) 893-0001 SPOKANE VALLEY, WA 99206 This Application: Description Grp Type Notes So Ft Valuation 1&2 FAMILY R-3 VB PLAN 0 $80,000.00 REVIEW Item Description RESIDENTIAL PERMIT FEE WSBCC SURCHARGE SF PLNS RV W < 7999 SQ FT Totals: 0 $80,000.00 Units Unit Desc 1 SELECT 1 SELECT 1 SELECT Permit Total Fees: Total Project: Sg Ft Valuation 0 $80,000.00 0 $80;000.00 Fee Amount $853.75 $4.50 $341.50 $1,199.75 Operator: JD Printed By: JD Print Date: 4/29/2011 Project Number: 11001104 Inv: 1 Application Date: 4/29/2011 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Notes: _ �AW Payment Summary: , ,,4R Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $1,199.75 $1,199.75 $341.50 $858.25 $1,199.75 $1,199.75 $341.50 $858.25 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: JD Print Date: 4/29/2011 rerrrut �,cnicr cm or 11703 E Sprague Ave, Suite B-3 PERtiIIT NLS IBER: 3poKane Spokane Valley, WA 99206 PERtiIIT FEE: ka11ey (509)C:'_3 -1-,G'36 FAX (509)683-0037 ,,;0o0 Community Dev,�iopment Residential Construction ❑ New Construction ❑ Accessory Bldg Permit Application ❑! XM,,Drd: t,emodel ❑ Decd,. ❑ Other: SITE ADDRESS: __ 12cS1 E 215T Air &(OMf4 4A Ae�: Lt/A. q 9 21 (e ASSESSORS PARCEL NO: LEGAL DESCRIPTION: Building Owner: Name: L Address`. City:s A rJ E V411LI State: Zip: 9 Phone: C� (513_ '2 95D Fax: Contact Person Name: t k �i Phone: �5 v - (0 '2-4 4 Contractor: Name: e l (`a;L Qe a fvr o Address: _ 4 City: S PO V_14- State: w Zip: '39 Phone- Fax: a 3- o0o ir93-ted o ContractLic No: Exp Date: 96L LJq 01]1 _ City Business Lic. No: Describe the scope of work in detail: Cost of Project: $ <�_v1000-00 STaZi� 1101.2 t -TV ERA �A Ct+R �R-IwArl �ttLvl,4�tor.l i >Jvo2s c.ANo,,Je-r s Proposed Use: **************The following MUST be com lete: write N/A if nota licable)********************** HEIGHT TO PEAK: DIMENSIONS: # OF STORIES: TOTAL HABITABLE SPACE: `t ds' G01( aq I 2 74.03 MAIN FLOOR TO Q. _ 2 FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE FTG: 1 9 v 6A— AREA: FINISHED BASEMENT GARAGE SQ. FTG: DECK/COV. PATIO SQ. FTG: 30% SLOPES ON SQ. FTG: 10 7 a S'7 (4 PROPERTY: # OF BEDROOMS: CONSTRUCTION TYPE: HEAT SOURCE: SEWER OR SEPTIC? The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. SIGNATURE: :'�G ,l �� �c�4 DATE: &/'v9, � - ( / Method of Payment. ❑ Cash Bankcard #: Authorized Signature: REVISED 2115/07 ❑ Check ❑ Mastercard ❑ VISA Expires: VIN#: poK 3ane p ,,;o0 Va11e 1V 3� 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 992.06 509.688.0036 ♦ Fax: 509.688.0037 ♦ cityhaii@spokanevalley.org Residential Plan Submittal Minimums ❑ Completed Building & Mechanical application with: Accurate address, Parcel Number and/or Legal Description, description of work, owner and contractor information, signature, and date. ❑ Two sets of plans including Site Plan, elevations, floor plans, foundation plans With details, roof plan, framing plans & details. ❑ Show the height of any proposed buildings or accessory structures. ❑ Floor plan for each floor: Dimension to scale (minimum 1/8") and label each Room (including sq. footage of house and garage on plans) Show each level of existing house and square footage of any additions. ❑ All braced wall panel types: show locations and details of installation, including engineered design. ❑ Egress windows: Provide at least one window or exterior door approved for Emergency escape or rescue from a basement and in every room for sleeping. ❑ Smoke detector locations ❑ 22" X 30" attic access location ❑ 18" X 24" crawl space access: Cl One-hour separation detail: between house and garage ❑ Floor framing details: Joist type, size, spacing and installation details ❑ Roof framing plan and details ❑ Furnace and hot water heater location. ❑ All header locations: type, size, and connections ❑ Foundation plan ❑ Insulation information This transmittal is being circulated along with the indicated documents for your review. Timely review of the information is important. Please notify the Project Coordinator as well as the applicant and/or contact oany major deficiencies. If the documents meet with your approval please notify the Project Coordinator as soon as possible such that we may include your sign -off on the permit application. Project Coordinator DAVIS, JENNA Phone: Fax: (509)688-0037 Please send all plan review and project comments via e-mail to the highlighted individuals. Site Address: 12519 E 21 ST AVE Parcel Number: 45272.2353 Project Transmittal City of Spokane Valley Community Development Department 11703 E. Sprapue Ave, Suite B3 Spokane Valley, XVA 99206 Phone: 509.688.0036 Newproject Previous pre -app meeting Plan revisions ❑ Transmittal Date: Thursday, April 28, 2011 Project Number: 11001104 Zoning: R-2 Water District: SPO CO WATER DIST#313 Fire District: FD 01 Applicant: BELFOR CONSTRUCTION Owner: KANE, DENNIS J / COLVIN -KANE, 10020 E. KNOX, SUITE 100 12519 E 21 ST AVE SPOKANE, WA 99206 SPOKANE, WA 99216-2538 (509) 893-0001 e-mail: e-mail: Contact: BELFOR CONSTRUCTION Occupant: 10020 E. KNOX, SUITE 100 e-mail: SPOKANE, WA 99206 (509) 893-0001 e-mail: Contractor: BELFOR USA GROUP Arch/Engineer: 10020 E. KNOX SUITE 100 SPOKANE VALLEY, WA 99206 (509) 893-0001 e-mail: Project MOLD REPAIR - REPLACE DRYWALL & INSULATION Description: Please send all plan review and project comments via e-mail to the highlighted individuals. SPOKan jUalley°' For City Use O ly PLUS Project Number Project Address 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is �1 The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it maybe several days before they can look at your new or revised infor ation. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK - BUILDING FILE REV 9/07