Dyer N 520 Truck Testing Facility
1
~
BLDG. pERAffr # _ oT, FME #
. Rel$ted fd8 # ( ` )
Datie #o Revievv 4:~,•~' 91 ' ' _
Date to .A~1 ~r DR Tune
~ Date Received /,~P • ft`- *
Project rTaxa,e 61 z- e-, o. Lots No. Acres`
4i -
S1TEADDRESS l PARCEi. # ,44f593
~ S-~t•r
SpaDSOrYs Name AA o , Ptiane
,
=Adc~ress Work #
+ ~ - Date condibons mailed _
Contact , on - a Pl~one # / -~s
,~LOOD 70,~ Yes I~o a~~$
Engineer 1 SuNeyor's JArchitect's Name
Wa-ter _ Address
Sewer
Schoo1
PlannYng CQntaot Person Phvne #
Date Submitted Desoription Initials
-
~ .,l AG,REBMENT TO PAY FEES COMPLETBD
FTNAL PLAT FEES COMPLETED
NO't'ICE TO PIJ.BI.IC # 1 3 4 6 CO1VtrPLETED - OR NOY.NEEDED 'N'OTTCE M PUBLIC NEEDS TO BE SIGa`+I.ED.
.
~
r ~
-
16~27~
- ~ ~
~
4~5 Al -Z, A,
~
I
~
~
NC~TICE 01~ TAANSMITTAL i !3-70 tj r~ 19,91
~ -
r4DDRESS 1_ P A R C E L #
- -
PB6 FA~f(~if~ PR C~JECi' # ~K~ .~rAa ~
~
JECT
, ~
DESCR1P. -
-f -
C ~
,
SrMF-s ,PH0~~1~ `
~ f ~ F - ~ . ~ , rF n Y> ' ~ _ ~ _ ~ ~ Z~.~.+~•cp ~
r nXF Rif i'` i ~
t7* .ti r. .rm F IN ~C ~ V ~ r ti~ l 5 ~ y ~ ~fi w'~~jr r rr h h } ~ ~ 4 . ','S - { } ('r.. ~ '~C,.r~ a 4 ~ 1.~1
TYPE QF CONFERENCE
/Pro-Application Pre-Constructron Other DATE ~2_1I
TIME
DOCUMEN7S CIRCULATED
DATED RE11ISED
ARPLICATION ~
SITE PLAN ~
DRAINAGE PLAN
LAMascAPE PcAnt ~
Other.
~er. ~
ADDITIONAL INF[?RMATIQN
ClRCULATED TO CIRCULATEt] 13Y DATE:
SCAPCA-M. Cain$ Utirdies ~
Engmeerrng Fire i]isVict # ~
Healih DisVict ce" Liberty Lake 5ewet Questions? Cor►t$ct Jeff Fotry or.
Planning w- Other:
tr_-L
Spokane County
DiVIS1ON OF BuILDINGS
INest 1 303 8rpadway Spokane,lNA 99280
(509) 455-3675 (office) nr [5091 456--4703 ftaxS
h
f ~ Page 1
. ,
OFFICE OF TH$ COIINTY ENGINELR
SPORANE COUNTY, WASHINGTON
Project: Truck testing facility Date 12-16-91
Address: N. 520 Dyer
Parcel No: 13533-0605 Ref No. B91115
The County Engineering Department has completed a review of
the above referenced project. The following information must be
provided in order for us to proceed with our review.
A) For any new hard surface area, for an asphaltic roof, or
a roof containing HVAC machinery, a drainaqe plan
for the site shall be prepared in compliance with
Spokane County "Guidelines for Stormwater Management". At
a minimum the plan must contain:
i. Drainage calculations for stormwater volumes
generated on site.
2. Calculations for total impervious surfaces
contained within the site.
3. Finished grade elevations for structures to be
constructed on site.
4. Finished grade elevations at the top and bottom of
the 208 swale.
5. A typical cross section of the 208 swale.
6. Calculations to justify the number and type of
drywells proposed.
7. Elevation of drywell inlets where applicable.
8. Copy of the proposed landscape plan.
B) Insufficient information was submitted with the proposal.
We are unable to proceed with our review. We will need
the following before we can proceed:
~
1. Drainaqe plan as specified.
C) Utility Condition: Permittee is responsible for arranging
for all necessary utility adjustments or relocation as
required for completion of the improvement.
D) The owner of the property or the authorized
representative must complete and sign Spokane County
Engineers "Agreement to Pay Fees". This document must be
returned to the County Engineers Office. Plan review will
not be completed until this document is executed. This
document is attached to these comments. Please return
the completed Agreement to your contact person at the
Enqineers Department.
Only after all the information and requirements listed above
are supplied or completed and the necessary review has been
accomplished will your building permit be released.
Your contact person at the County Engineering Department may
be contacted at 456-3600. Your contact person is Robert Turner.
f
~
dw
. r.
i ,
S ~ (D K A Tl E C O U N T Y
DErAfiTMC~'7 OF BU1LU1`(,S o ADIVISIDti OF THE PUBi..IC WQRK-; DEPARTtv1ENT
,Eti4F4 L \SOti C B O DiltFr"i 01 DEfvNl5 %1 SCOTT P f TJI;';Ft TQR
TO: Jun Mascardo, Department of Buildings
' Enc Qlson, Fire District #1
Francuie Shaw, Planning Department
Bob Turner, Division of Engineenng & Roads
Torn Ve1gic, Plannine Department
, Daryl Way, Heatrh Dastnct
r
~RO-IM om Da4zs, Ccde Co-~pLancz Goarcsr~~lti,
` s);partment o; Bui).nrigs
DATE• , December 16, 1991
RL Decert-lber 16, 199I Prt ApplicGion ConfererLe.
North 520 Dyer
Enclosed is your cop =f of lhe minuces io the referenct~d meeung.
Should y,ou have any questions or need additional information, please feel free ca contacc me.
TLD•ckb
cc: Ji-m Haines
Jolw NI'iller
Western States Equipment
Mabel Caine, A.ir Pollution
Dennss ScooLc, Public Wor"s Deparime,ib
e
CODE EyFORCEMENT DIVtStON
WEST 1303 SROADWAY o SPOKANE, WASNINGTON 99260-0530 0 ISOQI 4So 3675
FAX (509) 456-4703 ,
r ~v
hUNUM
PRE-APP'I.IGATION COrfFF.RENCE
NORTS SZO DYER
TRUCK ZESTING FACILiTY
DECEMBIIt 16, 1991
CALL TO ORDER: The meeung was called to order at approximately 10:00 a. m. by the
Department of Buildings Code Compliance Coordinator, Tom Davis, with the following in
attendance.
PER.MIT REYIEW PARTICIPA►NTS:
Carol Bradbum, Department of Buildings
Jun Mascardo, Department of Buildings
Eric Olson, Fire District No. 1
Francine Shaw, Planrung Department
Bob Turner, Division of Enguieering & Roads
Tom Veljic, Planning Department
APPLICAN'1&
Jim Haines, Haines Arctutecture, Souih 140 Arthur #425,
Spokane, Washington 99202 (509)535-5135
John Miller, Divcon Inc., North 10220 Nevada,
Spokane, Washington 99218 (509)466-8900
Western States Equipment, P.O. Box 3668,
Spokane, Washington 99220 (509)535-2287
scoPFJPRoJEcT DESCRIMoN:
1. General Overview - The owner, Western States Equipment, is proposing to oonstruct a
1,500 square foot new building. The tentative start date is mid-February, 1992. The appli-
cant indicated that the new structure will be a dynamometer fachty, performing diagnostic
testing in conjuncuon with the existing buildmg which performs truck repmrs. The
dynamometer is a closed water running system. Applicant indicated that no repairs will be
performed in the new facility. Proposed will cootain an office area, will not have any toilet
facilities, and will contain a pit area in the rear of the building. No additional employee,s are
anticipated. The property is 100gb fe.nced and 100% paved (including the drainfield).
Appiicant indicated that there is some striped parlcing on the street. Some asphalt will be torn
up to construct the new building.
S Y OF DEPART2fENTAL REQ :
1. Planning Department (456-2205)
A. Discussion/Requirements
1. The proposed is located in an I-3 zone. The proposed use is allowed in the
zone.
2. The proposed is located on parcel number 13533-0645.
- 1 -
~ . .
3 On the revised site glans, please indicate:
a. The square footage of the shop area r+erses the parts sates area, of the
ex#sting building.
b. T'he elevation (height) of the bu1lftg from ground level.
c. The dlmensions of the build.tng.
d Fxisting fencing and it's height.
e. Entranees and exits from the building(s).
4 Pr4posA will not have aray parl+.ing r€quirements However, pkease identify
)n the revised site pians where t.he prmnt puking is Iccated. Applicant was
Lnformed €hat stnping is usually required for any new andlor existing pazking.
5 Pleas~ subrnit ~~raffic and circulataan plan fQr review and approva1
b. There are no landscapmg reqvimments. However, it was recammended to
the apphcant that Iarzdscaping be Ynstafled around the buildings t4 buffer them
irom the freeway. The usual tecommendation is 25 fee# of Type H landscapmg
adjacent to the freeway. However, sinae the pmperty is paved to the nght-vf-
way line, it would be unreasonable t.o require the apphcant to teaz up a 25 faot
wide strip of asphalt. Applicant was given P. copv af a pmrn1ssory Iett-T
~~yUA4f~1 Please submit a revised site p3an iliustzfing the square footage of the shop
verses the parts sales areas, elevation 4f proposed, dtm"sions +af propased,
exisi~na- 1-`nCujg inciudmg h%nght ~ enLr -,s m 3L--~ f - -Mew
r~2. Flease submit a traffic and circtilation plan.
Di,~isxur, t~~ ~~~i-jeenn~ ~ Rcvx,7~ 'JO}
A. DiscussionlReqvirements
l. Cvmments were given to tkte applicant and the Iepartment vf Buildings by
Bvb Turner.
2. S1I1C4' tJ1e 51#e 25 C11Fren~y paYed, no 208 stormwater drainage swaies wi11 be
re.quired. However, pleaw indicate where the roof dsairiage will ~e directed.
~7~`~'7'4a.p}y~ 's ,4tr~usr ~ r}[l~ wr- ' w• ~.a T~
z+►i~ ►:1 i7r a • VI~~ i- i- ".~r ! ' y`y ,r~~JT2.r~. sit
on the s3 ie
3. Please subrmt a traffic and circulation pxa,a for review aad appravat,
4 Plea.se submit mformation as ta where the wat,ex from the flaor drain(s) gaes.
5. An Agreement to Pay Fees was gxven to the appLcant during the meeting.
The agreement is tv be signed by the owner ared retumed tv the Division af
En,~tneering & Raads. Plan rewiew will not be completed until this document is
executed.
-2-
. . ~
B PermYt Relmse Requiremen#s
1. Flease subma a descriptian on hQw the st+~ormwater will be retained on site for
review and approval
2 Please subrnit a traffic arid circuIadan plan for review and agpraval.
3. Please submit infQrmation regardtng vwhere the water from the floor drwn(s)
goes.
4. Please submit a copy af the Agreement to Pay Fees signed by the Qwner,
III. Hea1th District (456-6040)
A. Discussiva/Requxrements
1. Camrnents were given to the applicants by Tam Davis in Daryl Way's
absence. Acopy of written cvmments fram Daryl Way were given ta the
applicant.
2. The water purveyor fQr the proposed is the Citv of Spo-a e Please a►~~;~t
ihe u aeer pur-ve)ar to review requirements f4r bac'K flow prevercters.
3. Praposed is served by an vn-site sewer with a capacity of 525 gallons per
day, which c,an s,erve ug to 35 pesson-shifts per day.
4. No drainage from floor drains is allowed in#o the an-site sewer. Drai.nage
from the floor drains must ga to a 208 swale. Agplicant indicatad that the flvor
arains currently go into an ail separatar which is pumged aut and removed fr+am
the site
5. Please submit a critical mawrials hst to the Departmerit of Buildings for
review updating an prmously snbmitted critical matenals ust. If it is determined
that proposed is a cntical matenais user, the owaer wi]I be reqtureci Co sign a
Sampting Agreernent. T'he agreement allows the Health Distdct to sample the
effluent of the septic tank on an annual basis All costs for sample rebieva1 and
a,nalysis shaU be paid by the owne.r,
fi. A11 cnnstcuction debris shall be taken to a licensed lwdfill.
B. Perrnit Release Requirements
1. Plea.se subnut mfornnation regarding the drainage fram the flaor dzmns as
descrtbed above.
2. Please submxt an updated critical materials list~
IV. Fire Dastrict hTv. I (92$-24+62)
A► DiscussivnlR.equirements
1 Fire flow for the proposed has been calculated f+ar 1,004 G.P.M..
-3-
~
~ . .
2. One (1) fire hydranc i.s requued to be installed. The fire hydrant shail be in-
sWlled as per an approved water plan. Prior t4 the preparadon of the water plan,
the applicant shall contact the City of Spokane at 625-6000 as soon as possible to
obtain the purveyor reqwrzments including specifications. The waier plan shall
contain the location of the hvdrant, hydrant assembly detail, and plumbing detail
Tiie wate. pian snall lo-:,ubm,'tr-.: io th~ firt- aistnr-L and %ate-o puneyor for
~
1,°~ .~ta ~'l~l 1:7SI.~._~ p,:7.o,' :J th;: °
pancy.
i-ie existma Kre hydraii. ~ppears to be too great of a atstance from the proposed.
P:~a.se suom.° '''s ex:,--* Ir<-aiion °R rev:sed site r',.ns fcr fu:ther revic w.
3. A lock (Knox) box entry system for fire department pers4nnel access is
required to be installed Forms for orden.ng ate avaiiable from i.tie fine distnet
The completed forms are to be returned to the fire aistrict. The bax shall be
inst.-affled prior tA o:z-ap^ -v The fire district would Drefer if the lock boxes on
the two (2) building~ wco. xeyei th,, sL.roc
~ ..,~r.:.~.~ur.c►►t ,
1 ilzr_ revieu ";as bcei mplz. on :he c+~ plaa-i oniY by Ju^. N,.:~~--ardo.
i - b ~k 0,. ~ a.y ,pancy. A
final determinauon ot the occupancy classification w~l be made when the revised
construction drawings are s.ibmittetj
3. g'lease suc,r :it wc:twlb 4►`$Vr►t~16J GJEtaI.IUI- ..e v~,cti:,.uor. :..ad the equipment to
be installed. Apphcant uidicated that a heattng/coohng system will be installed
to primarily serve the office area.
4. As stated under Health District discussion/requirements, a enrical materials
Lst is required to be submitteci to the Department of Buildings.
5. The front page (cover sheet) of the construction drawings shall contain the
professianal siamp uith an pnglnal dated sign2tu_re, the builchng address, legal
..s..: - rLl, ; 1..t-, t . . 4 . _ zAz.. p CIS- , .ard _
B. Permit Release Requirements
1. Two compiete revised sets of plans addressing the items discussed during the
meeting and ather items from the plan review letter needs to be submitted for
review and approval.
APPLICANT'S CO /ACKNOWLEDGFa/IENT;
The applicant acknowledged that all comments/requirements were understood and had no
further questions at this time regarding permit requuements.
-4-
• ti~
i
COR1t EC'ITONS:
To minutes or changes from what appears in the minutes, we should be notified within one
day of your receipt of these minutes.
To site plans as required by any or all of the above-listed departments shall be subrriitted to the
Department of Buildings who will then distribute accordingly to those departments.
ADIO T: There being no further business, Tom Davis thanked the applicant and the
departments for their particigataon and reminded all that he should be contacted if there are
any unforeseen problems wtuch may arise.
The meeting was adjourned at approximately 10:30 a.m.
Copies of Minutes to: All participants
File - Norih 520 Dyer
Truck Testing Facility
NOTE TO APPLICANT: Some time ago the County recognized the need to stcmmline the
building permit system and accordingly uuvated these Pre Construction Conferences. Com-
ments so far would indicate these conferences are successful and do enhance the pern:ii
system. As a recznt participant, we would appreciate any comments you might have to further
improve the process. Should you have any questions or concerns regarding your conference,
please contact me at 456-3675.
, Sincerely,
James L. Manson, Director
-5-
y
r
. .
Summary oL Requirements -~orth 520 Dyer
December lb, 1991
i or your convenience the following ?s a listing of the permit
ra LeGse req«irem2nts A.
uur►a in the nursutes a:?a can be used as a
checklist while the proposa,l is in the application stage. If you
have any questions or concerns, please let us know.
PLANNING (456-2205)
~ Please sUbmit a traffic and circ~ilation plan.
_ :1 Ci S q ~ p
J I O U~. age = i. _i e li i~ 4~-' r S E' ~ L. l1e ~C.`..~-i! iz5 arE..-' aS, ele:;~= a a?1 Of
proposed, dinensions of proposEd existing fencing including
hezght, anc; entranCc.s aTsd exits for ~eviev and app:-ov~3 .
.
V ie .S .
•
DIVISION OF F'd;IhrEE2ING ~ R4ADS (45; -3600)
-1 Please submit a description on how the stormwater will be
u retained on site for review and approval.
r, Please submit a traff ic and circulation plan for review and
i
n Please submit information zegarding where the water from the
U f loor dra ir( s) goes.
n Please submit a copy of the Agreement to Pay Fees signed by the
'U owner.
Not-es:
e
~
. .
AEALTH DISTRICT (456-6040),
n Please submit a critical materials list to the Department of
u' Build'ing for review.
U Please submit information regarding th'e drainage from the floor
drains as de'"scribed above.
Notes:
BUILDINGS (456-3675).
n Please submit two complete rev-ised sets of plans addressing the
u items discussed during the meeting for review and approval.
Notes :
***REMDMER*** Please submit all revised site plans to the Depart-
men't of Buildings for distribution.
a
NOT CE OF TRANSMIAL
~ r .
~
~
ADDRESS !'AR~EL}#
-
PROJ ECT IrQc~~ fF!S~T1W3,- P-0it" PROJ ECT #
3
l 4 C^ {
~
DESGRIP.
{ 5 Ay 2
7 d t r,
~ r
` ~ i r ~ i ` r~C4s ~C~}h V?: ` { { ~ D
2 , . s....... . ~ • . _ _ "
;t~h4N,E F~~~ ~~s 6autP 6~~1 S6
~ r
1; _ . .
~~~~~f T ~ K I r ~ k } Y ~~F}'`~ r ~ ~ ~ ~ ~ { ~ ~,r ~ i~'~` S f• ~ r~,h~ pr
TYPE OF CONFERENCE
Pro-Application Pre-Cons#ruciion Qther, DATE:
TtME:
DQCUMENTS CIRCULATED
QATM AEVlSED
APPUCA710N r ~
St'I'E PLAN L-,-' ~ '~I ~
DRAINAGE Pl.AN
LANDSCAPE PlAN ~
other.
4ther:
ADQITIC1NAL iNFORMATION
. ~
CIRCULA.fiED TO CtRGULATEQ BY: DATE:
SCt4PCA--M. Caine Utrlities ~
4 - ~ 5- 9 2-~ Engineering L/ Fire Disirict # ~
HeafEh District Uberty Lake Sewer Questions7 Contact Jef Forry ar:
P{anning Ofther.
~
Spokane County
DIViStt]N OF BU{LDINGS
West 4303 Braadway Spokane, YNA 99250
(509) 456-3+675 (affica) or (509) 456-4703 (fax)
~
NOTICE OF TRANSMITTAL
` } fr ' k . ~ r ~ ` , "''~1 rJ {~~^xy~b r ~'i,~ L ~ 3 r ~ ~kJ' ~ , !v~^+ropp ,...a~, ~ r ~ Yv~.7{a~ +T i,~ 3 Y't'~to+j~V"'''„` v b f 6 r'$'~ r ~ v ~~'~`.M' E ~ vo+' ,ro i~'MZ. ~
(ti '+ti r h ~ ~ ~ 3. r 1 ~ v'4, f h .~.K~ ~ S 2~fl~x } ~ v ~ } `y' .3~. r,. ~lr- " lr ' {n • 1 + }ti { r~y. ti,7 } v ~ r ~ ~ ,~~y,~~cc ¢r ~ + y
~K L 1~ n rq r h x~v f ~ 4 w~ y 1' { 7.y~ivrh v{ ♦ nC~ .~.{W+" S'~ 9~.^~ f+.. ~v ~~S
N~. ~ ~ ~ t r{ 3-04oSp7 • f k YQ'v,'-. ~ m~5$~
~~.n
~ kF j rjGr~, n .~k~y.1 4'~v •~~r+~ 1
~ µ ~ C yS+~~~^ 1 Nbi~ ~ f~}~ S i •
ADD~. 6 0~'
,
ye.~ t~{~
~ y
} { r. +014 ~ ~ ~ ~ t J4'ti ' ~ ti r ~ +.yy ti ti rP' Y'~ {-i
7~ , < • ~ ~ ; } ~'~.~y`'~}+~ ~"`'c ~ ~ ~
, ♦ f ~i'.e w}iKl~vt r r ~f ''~i 4Ti'~}.i <f ~ +.~i , '!'Y'1r v ~
Y ~ lr1S~ ~ ` 'F 5 SV } ' { v } { \ . % rY
ti1.~ ti\h~ szv'
~iN?t Ypf}Ly k~
)
y~,., •~v~ ti b ~f } {,~•+.y~ ,v~t r{•; S v~ v~ ~ F~~7ky~
}~~v{ ~ ♦ ` x• 4f' .C t t~ ~ti,~i~i { { ~~5~ ~ < < r ?'f ~
i.
} ~ .'~~Y tiXiM1 AL Y ~/J+•y ,t f1 h41f { 4J+ t ~ y ~ ~ ~ I~(1}V~]}~'~V{ f t ; Y ~
~f
f ~ A~
,y<< ,,y r~t,r'> ♦ _ 1 4+'t~i~+~ a lr~v'{!~i`$~~{~, ~ `5 `~t 'y~~,~ ~C
~'Sr'~ti ~?`~-0Y.~'' 5R~~~rr e. ~r~ ~.'.~Jv4 ~~K ~ ~.~.a ti ~~1 ~ v ~?1 { :N,~4'.~L~ \1 ~4j~}~nS S~~f~ r~~i3'~'~~y~v ~ Y` ~1~~''^~f¢,~ ` 7~
iw ~'#Y ~ n7. vr U . ~ ~ Y'•, 2~ ~ r, i 11 Y}-. ~ v L ~~X ;~'~y}:~
ir5i~'i
~.,yy >~r{..~ 1v~~~ ~ _ ~ ti ~ ~ Y h,~ L » ~ r ~s v~• ~ "~i.~LSr~nz'~~. ,
~bl45r9 y s t '
i
t , ry ~~5~ Aj ' t - ~ IIQI ~ Y ~ ~ 3~ - 2.R OP7
~SF17Vn`
~ ~v't`C ti br vv?C ...,,.:rn r}{ vK ♦ ui~ntir}{Xw."r.i} 7{{J ~ 4?4~ti-?ti~ ~ i~V`1
~F r ti x } , ? ~ ~.4 0. $ r v'2' vc jS E $ `{7S E,... !~F ~
rL~, v w i ~
S^vo
1 y 3~ fvr Y~ y~{' r♦ 1 R } ~ Y 16 4~rf ~ k~ '+fl~ioc'+~} 1+005~~< e`~~ yti S`/? ~ 'p ~`y'i
~ ~ • s: 'k ~ a~♦ { ~v'r
ti t~~ ~ r ~6` ~tr R~ (v r~{ f w Ya+ aa yj
.~,'~~1~ i . nv
TYPE OF CONFERENCE
Pre-Applicagon Pre-Construction Other: DATE:
TIME:
DOCUMENTS CIRCULATED
DATED REVISEO
APPI.ICATION
SITE PLAN5C
DRAINAGE PLAN
LANDSCAPE PLAN
Other: .
Other: N
ADDITIONAL INFORMATION
CIRCULATED TO CIRCULATED BY: DATE:
SCAPCA-M. Caine Utilides ~
'
2v ~ ~~p -1?~J),C-En9ineering Fre District f
Health District Liberty Lake Sewer Questions? Contact Jeff Forry or:
Planning Other:
Spokane County
DIVISION OF BUII.DINGS
West 1303 6roadway Spokane. WA 99260
(509) 456-3675 (office) or (509) 456-4703 (fax)
sv •~v ~
p~~......
- ~ - -
• ~
~ a ~ ~ ~ • ` y + / ~ i ~ • ~ ~ • I ~ ~ ~ t' l ~ ~ f r • 00,
~Olff voBd9 ro ~ . . . . " 1 ,.:.:.:'f..~..
~ BROADWA AYE
T'Y~ ~ t~-o• •
J e I 4 r e ' J a j t
i~
► ~ I ~ ( c It t~ . li ~ M K ~ , ` '1 ` ~ Q
GD)
S
ti Y »
~I i~ . • ~ I ~ ~ ~ ~
,
~
, ~ ~ 9 ► , _ ,
_ ,~o~►e _~~ee , ~ ` ~ " ~ . ~a ~ 231 I
Al K 1 231-41 - 231.cr4i ' . ' ~1 . -
. a ; h • •a.~ - n , ~ l
i.
♦af t~ . _ ioB o ~ ~ a y ~ ~8 f I t ~ ~ ~ ` ~ o - ~
~ R
' lot
.
'(D I b, ~ " . 8
- , -
• ~ 1 , ~ ~ ~
I _Rof39 4_4¢r
v,t ~ tr al
c E ----ti
Mofu "wLo ,b
~ f~~~ ~r~ ~ ~~~e~`'~1~ ~.r f~ ~s• ~ 2
I ...1_►.~~ ' ~
. > ~
IF~ d nc~ e I.IC .t:f.i-V l:~i~i ! i N R! /t
07= ; A~I 6 r7 E
/ 6 d
IfJ~I
~~6+ C M' 44
6 ~ q I
y ,!•T~1' w
I qrWa
,r- .j 04 N
' 1f _ " ~oT~t vr~ W Alti~:~..►_t « ~ ° o
'r ' ~ A V I~ E~s~ ~iA4~ ~ ' . o~+cb'~'~" ~'r~~ ' if7Af9~' - - - - ~3{• 4 - ~ • - - - - - - - - d-~ a'. . _ - - - - - - -
~ '1e~ s' 7~ 6~ I! t%~ ii iI rt ~o r a'• a i t i
,
~ r`' ~ ' ~ ~ ~ ~ • ~ ~
j ~ r r~ tc i~it'4i rY -10 'yi t ar tt rt ri
6 ~ J a
•Iro
~ ' ~t ~ ~
, I • ~ 1V~ ~ 1~ ~ ~ ~
QI` YJ~d ~ ~3 J~
~ ~ ! ERSIOf do~..k.r•~ ,N~C ~
_ ~
~
1
~ ' 1-1 ~ . •
~ ~ , ( ) t~ <(D.~(~~,~~~,l~lt ~ ~ ~`C➢ '~C ~.1'~
PtJQIlC WORKS OEPAaTMENT
. ~
OFFICE OF
► C4UNTY ENGINEER
~ ~ A 071t
IL.1V RONALO C. HORMANN, P.E.
Tn p ?t~+.~~.;~~ COUNTY ENGINEER
. SPQKANE. WASHINGTON 99260-0170
srpAANC cOYNtY cOY"f w0{ISC
AGREEMEI~T TO PAY FEES
~l
Agreement Number • ~ ~
~
This aqreeraent between Spokane County and ,,01dC0A1
4 whose interest in the project is A6,6^1 r
is entered into
~ this day of 19 12- . This agreement is
T applfcable to the project known as:
,
That the individuals and patties named herein as having an
interest in the above described property or proiect agree to the
~ followinq: .
~
° 1. Reimburse spokane County for project zeview and inspection
` fees as specified in Board of County Commissianer's
Resolution 80-1592 attachment C, as amended. The fees will
~ be baSea on actual salary costs incurred by Spokane County
° fo= project reviews and / or inspections plus a ten percent
admf nistrati f ve charge, and wi 1'1 be bf lled monthly as
accrued. :*4h-
2. The undersigned agrees that these fees are due and payable
upon receipt of the billitfig as speciffed above. The'
monthly billing should be sent to the attention of:
1.71 ve- o •j ...1 ~/G dou iE-7o~
~~.44e 3 Wf9 ?,92of
I understand that failure to pay these fees may result in
delay in completion or approval of the project or other possible
sanctions.
~
Sy r~-
.
Public Works Building / North 811 Jefferson Street / Spokane, Wash►ngton 99260-0170 (509} 456-3600